My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1804 HEWITT AVE 2022-05-12
>
Address Records
>
HEWITT AVE
>
1804
>
1804 HEWITT AVE 2022-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 9:08:52 AM
Creation date
5/9/2022 3:59:38 PM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
1804
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/25/2022 City of Everett Page' <br /> 9:44:44AM <br /> INSPECTION ACTIVITY REPORT <br /> 4/2/2019 4/2/2019 BLDG DWF CORRECTION Phone:425-948-9487 <br /> 09-DRYWALL <br /> (4/2/2019 11:39 AM DWF) <br /> Need to have electrical,plumbing, <br /> mechanical RI sign off before Framing <br /> inspection. <br /> 4/11/2019 BLDG KMK VOIDED(KMK 425-948-9487 <br /> 09-DRYWALL 4/11/2019) 2nd floor to 3rd floor <br /> 4/19/2019 4/19/2019 BLDG DWF PARTIAL APPR Unit living rooms and bedrooms only. <br /> 08-FRAMING 2nd,3rd,4th and 5th floors. <br /> Note:Some units and utility/laundry <br /> rooms-not ready.Bathrooms and kitchen <br /> not ready in all units <br /> 6/27/2019 6/27/2019 BLDG 14-OTHER DWF PARTIALAPPR 425-948-9487 <br /> Framing inspections-203,201,204,205, <br /> 205,207 and laundry room only ok to cover <br /> subject to <br /> electrical RI sign off. <br /> Note: 209,309,409 and 509 stack needs <br /> mechanical RI sign off. <br /> 6/28/2019 6/28/2019 BLDG DWF PARTIALAPPR (6/28/2019 2:53 PM DWF) <br /> 08-FRAMING 3rd floor units, <br /> Note:209,309,409 and 509(bathroom <br /> exhaust ducting)not completed mechanical <br /> RI. <br /> 406 fill hole(FIRE Protection)around <br /> shower drain in ceiling. <br /> Fifth floor already covered. <br /> 7/18/2019 7/18/2019 BLDG DWF PARTIALAPPR Floors 3 thur 5 <br /> 09-DRYWALL 425-948-9487 <br /> (7/18/2019 12:23 PM DWF) <br /> units only-2nd,3rd,4th and 5th floor- ok <br /> to cover. <br /> (7/18/2019 2:13 PM DWF) <br /> 2nd,3rd,4th and 5th floor units only-ok to <br /> cover <br /> 8/1/2019 8/1/2019 BLDG DWF NOT READY eTRAKiT Inspection 7/31/2019 10:47 AM Refugio Camilo <br /> 09-DRYWALL Request For units 209/309/409/509 <br /> And fire stop and box framing for duck <br /> pipes in the bathrooms.On floors 2 to 5 <br /> Contact Name:Refugio Camilo <br /> Site Address:1804 HEWITT AVE <br /> Phone:4259489487 <br /> e-Mail:info@drcconstruction.net <br /> (8/1/2019 8:06 AM DWF) <br /> Need to complete the work before <br /> inspection. <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.