Laserfiche WebLink
INSPECTION REPORT <br /> Date t@ _ Permit(( I 80_- / 4,'_, <br /> .,•= Contractor: <br /> ;i D ia0 <br /> `I50 t t) Owner: <br /> Site Addres : a( __ AJ C, <br /> TYPE OF INSPECTION REQUESTED <br /> BUILDING MECHANICAL PLUMBING <br /> a - • ervice ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHE CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION A e r r <br /> ❑ UN O PERFORM INSPECTION: t/�J <br /> ALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> G✓►SJ 4 t o-",, ` — - 20. I <br /> k <br /> I <br /> Inspector: 7,....,1-tolliccolLate: 7/30S <br /> EIR(10/06) DATABAR,INC. <br />