Laserfiche WebLink
4 p i <br /> Li <br /> To: Tony Lee, Everett Building Official Vc, DEC 262017 <br /> CITY OFEVER T <br /> From: Doug Engelson, Architect Permit Serv3,:yr <br /> Date: December 21, 2017 <br /> RE: Hodges Building Renovation, Phase 2, #B1606-075 <br /> Following is an item by item response to your letter dated 12- <br /> 19-17: <br /> General- <br /> 1. It was there. Look at Sheet 2. <br /> 2. I understand an electrical consultant is working on it. <br /> 3. Good. Thanks! <br /> 5. I just measured again (in the field) the ceiling heights at the <br /> Mezzanine Floor, and they are indeed as marked on the <br /> plan on Sheet 2. You may have heard from someone that <br /> some plumbing lines are less than 7 feet above the floor. <br /> However, these will not be above the floor, but instead will <br /> be above kitchen cabinets. <br /> Construction- <br /> 1. See change to Detail B on Sheet 10. <br /> 2. See change to Detail A on Sheet 10. <br /> 3. See new Trash Chute Access Room added to Sheets 3 <br /> Page 1 2 <br />