Laserfiche WebLink
Task 4: List #3 approach to MR #5 compliance (flow control exempt projects only) <br /> E You are required to use the first applicable BMP that is considered feasible in each <br /> category (lawn, landscape and hard surfaces) below. <br /> Mark whether the BMP is feasible or infeasible. If you select infeasible, cite the reasons for <br /> infeasibility(See Worksheet 2) and or a reference to supporting documentations (such as a <br /> geotechnical report). <br /> List#3: On-Site Stormwater Management BMPs for Flow Control Exempt Projects <br /> . __.._..... . . ....__ <br /> ate•o 1 , '` <br /> Feasible Infeasible If infeasible provide justification <br /> BMP T5.13: Post-Construction Soil <br /> Quality and Depth f I__ <br /> Feasible Infeasible If infeasible provide justification <br /> *BMP T5.10A: Downspout Full Infiltration 7 I *Soils report required for this BMP <br /> or <br /> BMP 5.30: Full Dispersion I— <br /> BMP T5.10B: Downspout Dispersion <br /> Systems <br /> BMP T5.10C: Perforated Stub-out <br /> Connections (— <br /> Cate•ory 3 - • rd <br /> Feasible Infeasible If infeasible provide justification <br /> BMP T5.12: Sheet Flow Dispersion <br /> or <br /> BMP T5.11: Concentrated Flow I— 7 <br /> Dispersion <br /> 0 Task 5: Attach sizing implementation for the BMP selected above in List#1 or #3. <br /> Worksheet 3 (attached) provides tools for sizing your selected BMP. Fill out the sizing <br /> justification sheet for your selected BMP in Worksheet 3 and submit to Permit Services <br /> attached to this report. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 19 <br />