Laserfiche WebLink
IN. I MY: I <br />below the finished ceiling. <br />floor <br />equipment <br />y ems^a 1ch is <br />level <br />on <br />e customers contractor must provide all penetrations in post tension floors. <br />customers contractor st provide and install any non-standard anchoring. nt r standard <br />anchoring s are included it i drawings r is areas that require such <br />documentation. <br />customersprovide <br />hardware <br />underfloors.contractormust f provide <br />floordrilling cannot be <br />completed because <br />of <br />obstruction <br />, encountered <br />f <br />by <br />installer such as rebar x <br />Structural Notes <br />