My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1700 13TH ST 2019 Plans 2022-12-07 (2)
>
Address Records
>
13TH ST
>
1700
>
Plans
>
1700 13TH ST 2019 Plans 2022-12-07 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2022 8:48:45 AM
Creation date
5/10/2022 9:42:50 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1700
Permit
B1912-025
Year
2019
Notes
TI REMODEL IN EXISTING CT ROOM 1 FOR INSTALL OF RELOCATED GE
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 , <br />GENERAL ABBREVIATIONS <br />SYMBOL DESCRIPTION ACH AIR CHANGES PER HOUR <br />HEAVY LINE INDICATES NEW WORK ARCH ARCHITECTURAL <br />LIGHT LINE INDICATES EXISTING WORK OR BACKGROUND BDD BACKDRAFT DAMPER <br />BTUH BRITISH THERMAL UNIT PER HOUR <br />-- - - -- CENTERLINE CF CUBIC FEET <br />WORK TO BE REMOVED CFM CUBIC FEET PER MINUTE <br />CLG CEILING/COOLING <br />O KEY NOTE CALLOUT CONN CONNECTION <br />CONT CONTINUATION <br />Al REVISION CALLOUT DB DRY BULB <br />POINT OF CONNECTION DDC DIRECT DIGITAL CONTROL <br />DEG DEGREE <br />EF-1 EQUIPMENT CALLOUT, SEE SCHEDULE DIA DIAMETER <br />DISCH DISCHARGE <br />CD2-300 DIFFUSER OR GRILLE CALLOUT, SEE SCHEDULE DN DOWN <br />DWG DRAWING <br />__. VOLUME FLOW RATE (CFM), NONE INDICATED EA EXHAUST AIR/EACH <br />FOR TRANSFER GRILLE EAT ENTERING AIR TEMPERATURE <br />:DIFFUSER <br />OR GRILLE TYPE EF EXHAUST FAN <br />EFF EFFICIENCY <br />0 INDICATES DIAMETER OR ROUND ELEC ELECTRICAL <br />ESP EXTERNAL STATIC PRESSURE <br />1 DETAIL CALLOUT: EXH EXHAUST <br />M-2 EXIST (E) EXISTING <br />INDICATES DETAIL NUMBER <br />F FAHRENHEIT <br />SHEET NUMBER WHERE DETAIL IS DRAWN FD FIRE DAMPER <br />FLA FULL LOAD AMPACITY <br />VENTILATIONFLR FLOOR <br />FPM FEET PER MINUTE <br />DOUBLE SINGLE DESCRIPTION FEET/FOOTFT FTU FANTERMINAL UNIT <br />DUCT, 1ST SIZE (IN) INDICATES SIDE SHOWN, HR HOUR <br />24x12 2ND SIZE (IN) INDICATES SIDE NOT SHOWN, HTG HEATING <br />INSIDE FREE AREA <br />SUPPLY AIR DUCT - TURNING UP OR TOWARD ID INSIDE DIAMETER <br />IE INVERT ELEVATION <br />SUPPLY AIR DUCT - TURNING DOWN OR AWAY IN INCH <br />KW KILOWATT <br />RETURN OR EXHAUST AIR DUCT - TURNING UP KWH KILOWATT HOUR <br />OR TOWARD LAT LEAVING AIR TEMPERATURE <br />®® RETURN OR EXHAUST AIR DUCT - TURNING DOWN LBS POUNDS <br />OR AWAY <br />MAX MAXIMUM <br />- ROUND DUCT - TURNING UP OR TOWARD MBH BRITISH THERMAL UNIT PER <br />HOUR (THOUSAND) <br />ROUND DUCT - TURNING DOWN OR AWAY MCA MINIMUM CURRENT AMPACITY <br />MECH MECHANICAL <br />TRANSITION <br />MINIMUM <br />TRANSlTIO <br />MOD MOTOR OPERATED DAMPER/MODULAR <br />TRANSITION - ROUND TO RECTANGULAR NOM NOMINAL <br />OD OUTSIDE DIAMETER <br />� OPER OPERATING <br />TURNING VANES IN RECTANGULAR DUCT TURN ORD OVERFLOW ROOF DRAIN <br />PD PRESSURE DROP <br />POC POINT OF CONNECTION <br />90° ELBOW (RADIUS = 1.5 x ELBOW DIAMETER) PSI POUNDS PER SQUARE INCH <br />PSIG POUNDS PER SQUARE INCH (GAGE) <br />RA RETURN AIR <br />RECTANGULAR BRANCH CONNECTION WITH 45° TAPER RD ROOF DRAIN <br />RWL RAINWATER LEADER <br />RLA RATED LOAD AMPS <br />RPM REVOLUTIONS PER MINUTE <br />CONICAL BRANCH CONNECTION SA SUPPLY AIR <br />SF SUPPLY FAN <br />45° LATERAL FITTING SP STATIC PRESSURE <br />SPEC SPECIFICATION <br />TBD TO BE DETERMINED <br />45° LATERAL FITTING WITH 45° ELBOW TDH TOTAL DYNAMIC HEAD <br />TEMP TEMPERATURE <br />THERM THERMAL <br />TSP TOTAL STATIC PRESSURE <br />90° CONICAL TEE FITTING TU TERMINAL UNIT <br />TYP TYPICAL <br />AUTOMATIC CONTROL DAMPER -OPPOSED BLADE UH UNIT HEATER <br />(PROVIDE ACCESS) UNO UNLESS NOTED OTHERWISE <br />VOLUME DAMPER V VOLTS <br />VEL VELOCITY <br />COMBINATION FIRE/SMOKE DAMPER VOL VOLUME <br />(PROVIDE ACCESS) W WATT <br />---- WB WET BULB <br />I <br />---- EXISTING COMBINATION FIRE/SMOKE DAMPER WG WATER GAGE <br />FD INDICATES EXISTING FIRE DAMPER, WSEC WASHINGTON STATE <br />SD INDICATES EXISTING SMOKE DAMPER ENERGY CODE <br />CEILING DIFFUSER (FOUR-WAY DIRECTIONAL AIRFLOW) <br />-®-I RETURN/EXHAUST GRILLE <br />EQUIPMENT <br />SYMBOL DESCRIPTION <br />THERMOSTAT OR TEMPERATURE SENSOR <br />TERMINAL UNIT, SEE SCHEDULE <br />�-ACCESS <br />1. PROVIDE DEADBAND BETWEEN HEATING/COOLING SPACE SENSOR SETPOINTS OF <br />5 DEGREES AS REQUIRED BY SECTION C403.2.4.1.3 OF THE WSEC OR AS DESCRIBED <br />IN THE TEMPERATURE CONTROL SEQUENCES. <br />2. HVAC SYSTEMS SHALL BE EQUIPPED WITH AUTOMATIC CONTROLS CAPABLE OF BEING <br />SET FOR SEVEN DIFFERENT DAY TYPES PER WEEK AND ALSO ACCOMPLISHING SETBACK <br />OR SHUTDOWN DURING UNOCCUPIED PERIODS AS REQUIRED BY SECTION C403.2.4.2 <br />OF THE WSEC AND AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES. <br />3. PROVIDE BALANCING DAMPERS, TEMPERATURE AND PRESSURE TEST CONNECTIONS <br />AND BALANCING VALVES IN ALL AIR OUTLETS/INLETS, BRANCH DUCTS AND PIPE <br />RUNS TO TERMINAL DEVICES AS REQUIRED BY SECTION C408.2.2 OF THE WSEC <br />AND AS INDICATED ON THE CONTRACT DOCUMENTS. <br />4. INDIVIDUAL ZONE TERMINAL UNITS AND HVAC SYSTEMS SERVING PORTIONS OF THE <br />BUILDING HAVING LESS THAN 24-HOUR OPERATION OR DIFFERENT USES SHALL BE <br />SHUT OFF OR SET BACK DURING UNOCCUPIED PERIODS AS REQUIRED BY SECTION <br />C403.2.4 OF THE WSEC AND AS DESCRIBED IN THE TEMPERATURE CONTROL <br />SEQUENCES. <br />5. RECORD DRAWINGS SHALL BE PROVIDED TO THE OWNER AS REQUIRED BY SECTION <br />C103.6.1 OF THE WSEC. THE DRAWINGS SHALL INDICATE THE LOCATION AND <br />PERFORMANCE DATA OF EQUIPMENT, GENERAL CONFIGURATION OF DUCTWORK AND <br />PIPING DISTRIBUTION SYSTEMS, INCLUDING FLOW RATES AS A MINIMUM. <br />6. OPERATION AND MAINTENANCE MANUALS SHALL BE PROVIDED TO THE OWNER AS <br />REQUIRED BY SECTION C103.6 OF THE WSEC AND AS SPECIFIED. <br />7. HVAC SYSTEMS SHALL BE BALANCED AS REQUIRED BY SECTION C408.2.2 AND OF <br />THE WSEC AND AS SPECIFIED. <br />8. COMMISSIONING SHALL BE PROVIDED AND REPORT OF COMMISSIONING BE SUBMITTED <br />TO THE OWNER AS REQUIRED BY SECTION C408 OF THE WSEC. COMMISSIONING <br />SHALL CONSIST OF A COMMISSIONING PLAN, BALANCING, FUNCTIONAL PERFORMANCE <br />TESTING, POST CONSTRUCTION COMMISSIONING, TRAINING, REPORTS, ACCEPTANCE AND <br />COMMISSIONING COMPLIANCE CHECKLIST. <br />9. ALL DUCTWORK SHALL BE CONSTRUCTED AND SEALED PER IMC, C402 LEAKAGE <br />REQUIREMENTS AND IBC VAPOR RETARDER REQUIREMENTS AS REQUIRED BY SECTION <br />C403.2.8.3.1 AND C403.2.8.3.3 OF THE WSEC. <br />DUCTWORK STATIC PRESSURE AND SEAL CLASS; <br />WATER COLUMN SEAL CLASS <br />Y2 TO 3 INCHES SEAL TRANSVERSE JOINTS AND LONGITUDINAL SEAMS <br />10. DUCTWORK SHALL BE TESTED AS REQUIRED BY SECTION C403.2.8.3.3 OF THE WSEC. <br />PROVIDE TEST REPORTS TO THE OWNER. <br />11. LOCATION OF LOW, MEDIUM AND HIGH PRESSURE DUCTWORK IS IDENTIFIED IN THE <br />PROJECT MANUAL AS REQUIRED BY SECTION C403.2.8.3.1-3. <br />12. ALL DUCTWORK SHALL BE INSULATED AS REQUIRE =D BY SECTION C403.2.8 OF THE <br />WSEC AND AS DESCRIBED IN THE PROJECT MANUAL. <br />DUCT TYPE LOCATION R- VALUE /U-FACTOR <br />ALL OTHER SUPPLY CONCEALED FROM CONDITIONED R-3.3 <br />DUCTS SPACE <br />SYMBOL <br />DESCRIPTION <br />X <br />DENOTES CONTROL POINT <br />A <br />SUMMARY ALARM <br />Al <br />ANALOG INPUT <br />AO <br />ANALOG OUTPUT <br />AUX <br />AUXILIARY DEVICE OR CONTACT <br />CR <br />CONTROL RELAY <br />CS <br />CURRENT SENSOR <br />CT <br />CURRENT TRANSMITTER <br />DDC <br />DIRECT DIGITAL CONTROL <br />DI <br />DIGITAL INPUT <br />DO <br />DIGITAL OUTPUT <br />DP <br />DIFFERENTIAL PRESSURE SWITCH <br />DPH <br />DIFFERENTIAL PRESSURE SWITCH - <br />HIGH LIMIT <br />DPL <br />DIFFERENTIAL PRESSURE SWITCH - <br />LOW LIMIT <br />DPS <br />DIFFERENTIAL PRESSURE SENSOR/ <br />TRANSMITTER <br />ES <br />DAMPER POSITION <br />FS <br />FLOW SWITCH <br />H <br />HUMIDITY SENSOR <br />LS <br />LEVEL SWITCH <br />MOD <br />MOTOR OPERATED DAMPER <br />NC <br />NORMALLY CLOSED <br />NO <br />NORMALLY OPEN <br />OS <br />OCCUPANCY SENSOR <br />PM <br />PRESSURE MONITOR <br />RH <br />RELATIVE HUMIDITY <br />SD <br />SMOKE DETECTOR (DUCT) <br />SS <br />START/STOP <br />T <br />SPACE TEMPERATURE SENSOR/ <br />TRANSMITTER <br />TEMP <br />TEMPERATURE <br />1. SEISMIC RESTRAINT REQUIREMENTS; ALL SEISMIC RESTRAINT CALCULATIONS AND <br />DETAILS, IF REQUIRED, SHALL BE BY A QUALIFIED STRUCTURAL ENGINEER HIRED BY <br />CONTRACTOR. <br />2. COORDINATE THE LOCATION OF AIR OUTLETS AND AIR INLETS WITH ELECTRICAL <br />LIGHT FIXTURES, LIGHT FIXTURE SUPPORT RODS AND FIRE SPRINKLER HEADS <br />FOR INTERFERENCE. COORDINATE WITH ARCHITECTURAL SECURITY LEVEL <br />DRAWINGS FOR RISK LEVEL, <br />3. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATIONS <br />OF DIFFUSERS AND GRILLES. <br />4. ZONE SENSOR PANEL SHALL BE INSTALLED AT 5-0" ABOVE FINISHED FLOOR. <br />COORDINATE PANEL LOCATION WITH ARCHITECTURAL ELEVATIONS. REFER TO <br />ARCHITECTURAL DRAWINGS FOR DEVICE MOUNTING REQUIREMENTS. LOCATE <br />PRESSURE ROOM SENSOR ABOVE DOOR TO ROOM. <br />5. ALL DUCT SIZES ARE INSIDE CLEAR DIMENSIONS. <br />6. PROVIDE MANUAL BALANCING DAMPERS AT THE RUN OUT DUCTS TO DIFFUSERS <br />AND EXHAUST GRILLES. INSTALL DAMPER AS CLOSE TO MAIN DUCTS TO POSSIBLE. <br />WHERE CEILING ACCESS IS NOT AVAILABLE, PROVIDE REMOTE DAMPER ACTUATORS <br />AS REQUIRED TO BALANCE DUCT REGISTERS AND GRILLES. COORDINATE LOCATION <br />OF DAMPER ACTUATORS WITH ARCHITECT. <br />7. FINAL DIFFUSER CONNECTIONS; PROVIDE ACOUSTICAL FLEX DUCT FOR FINAL <br />CONNECTION TO SUPPLY DIFFUSERS AND GRILLES LOCATED IN ACCESSIBLE <br />CEILINGS. LIMIT FLEX DUCT LENGTH TO MAXIMUM 5-0", PROVIDE RIGID DUCT <br />FOR FINAL DIFFUSER CONNECTIONS TO ALL DIFFUSERS AND GRILLES LOCATED <br />IN NON -ACCESSIBLE CEILINGS. <br />8. MAINTAIN A MINIMUM 1.599R CONNECTION AT ALL SA DIFFUSERS. FOR LOCATIONS <br />WHERE CRITERIA CANNOT BE MET DUE TO DUCT. PIPING AND/OR CONDUIT <br />UTILITIES OVERHEAD. PROVIDE DIFFUSER PLENUM PER DETAIL DRAWINGS. <br />PROVIDE PLENUM FOR ALL EA AND RA CONNECTIONS, EXPECT OR'S. <br />9. ALL CEILING MOUNTED DIFFUSERS SHALL BE 4-WAY THROW UNLESS NOTED <br />OTHERWISE. <br />10. INLET SIZE TO AIR TERMINAL DEVICES SHALL BE SAME AS INLET UNLESS NOTED <br />OTHERWISE. PROVIDE MINIMUM 30" INLET DIAMETER STRAIGHT RUN UPSTREAM <br />OF ALL AIR TERMINAL UNITS. <br />11. AIR TERMINAL DISCHARGE DUCT SHALL MATCH REHEAT COIL SIZE UNLESS NOTED <br />OTHERWISE. MAINTAIN S-0" CLEAR OF ALL TAPS, TRANSITIONS OR ELBOW <br />DOWNSTREAM OF REHEAT COIL. <br />12. CONTRACTOR SHALL COORDINATE WITH CONTROLS AND PROVIDE ALL WELLS AND <br />TAPS IN PIPING AND DUCTWORK FOR CENTRAL DEVICES - ADJACENT TO EACH <br />CONTROL DEVICE PROVIDE "PETES PLUGD9 FOR SYSTEM TROUBLESHOOTING. <br />13. CONTRACTOR SHALL COORDINATE INSTALLATION TO MAINTAIN LEGAL WORKING <br />CLEARANCES AROUND ALL LINE AND LOW VOLTAGE EQUIPMENT. <br />14. ALL WORK WITHIN FINISHED SPACES SHALL BE PERFORMED IN STRICT <br />ACCORDANCE WITH THE HOSPITAL'S INFECTION CONTROL GUIDELINES. NO WORK <br />IS ALLOWED IN THE BUILDING PRIOR TO IMPLEMENTATION OF APPROVED <br />CONTRACTOR INFECTION CONTROL WORK-PLAN(S). <br />15. CONTRACTOR SHALL COORDINATED WITH OWNER, SHUTDOWN OF ALL UTILITIES <br />SERVING EXISTING BUILDING. CONTRACTOR SHALL PROVIDE MINIMUM 7 DAYS <br />NOTICE AND LIMIT UTILITY SHUTDOWN TO LESS THAN 4 HOURS. ALL SHUTDOWN <br />WORK SHALL BE PERFORMED DURING OFF HOURS TIME. <br />16. DEMOLITION DRAWINGS ARE BASED ON AVAILABLE RECORD DRAWINGS AND <br />VISIBLE FIELD CONDITIONS. ALL DEMOLITION WORK MAY NOT BE INDICATED. <br />CONTRACTOR SHALL VISIT AND REVIEW SITE PRIOR TO BID TO DETERMINE FULL <br />SCOPE OF DEMOLITION WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR <br />REMOVING ALL WORK REQUIRED TO ACCOMPLISH PROJECT SCOPE EVEN IF NOT <br />EXPLICITLY INDICATED ON DRAWINGS. COORDINATED EXTENT OF DEMOLITION WITH <br />NEW WORK DRAWINGS. <br />17. REMOVE SYSTEMS AND/OR COMPONENTS LOCATED WITHIN THE DEMOLITION LIMITS <br />OR TO THE EXTENT INDICATED. UNLESS INDICATED OTHERWISE, REMOVE SERVICES <br />AND COMPONENTS CROSSING DEMOLITION LIMITS BACK TO LIMIT AND CAP. <br />18. UNLESS INDICATED OTHERWISE, DEMOLITION WORK SHALL INCLUDE REMOVAL OF ALL <br />APPURTENANCES. <br />19. CONTRACTOR SHALL FIELD VERIFY AREAS SERVED BY EACH SYSTEM AND/OR <br />COMPONENT SCHEDULED FOR REMOVAL PRIOR TO DISCONNECTION AND REMOVAL. <br />AREAS OR FUNCTIONS OUTSIDE THE DEMOLITION LIMITS SHALL NOT BE TAKEN OUT <br />OF SERVICE WITH OUT NOTIFYING OWNER IN ADVANCE. COORDINATE SERVICE <br />INTERRUPTION WITH OWNER AND APPLICABLE UTILITY COMPANIES. <br />20. DRAWINGS SHOW FINAL STATE OF DEMOLITION. CONTRACTOR SHALL PHASE <br />DEMOLITION TO AVOID AND/OR MINIMIZE INTERRUPTION OF EXISTING TO REMAIN <br />AREAS OR SERVICES. <br />21. COORDINATE CUTTING AND PATCHING OF WALL/FLOORS/CEILINGS WITH GENERAL <br />CONTRACTOR. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION. <br />z <br />-rJ <br />0 <br />-'72 % ;a <es Ave. <br />S life 100 <br />Everett, VdA 9 S 2 0 1 <br />REa'VIS10NS <br />S , "t ''e <br />tec <br />tan' <br />4100 194th Street SW Suite 400 <br />Lynnwood Washington 98036-4613 <br />(206) 667-0555 <br />Copyright Reserved <br />The Contractor shall verify and be responsible for all dimensions. DO <br />NOT scale the drawing - any errors or omissions shall be reported to <br />Stantec without delay. <br />The Copyrights to all designs and drawings are the property of <br />Stantec. Reproduction or use for any purpose other than that <br />authorized by Stantec is forbidden. <br />®y WAS�dio <br />�iONA% <br />LLI®� <br />I� <br />I�0. <br />0 <br />4- <br />I <br />Boa ra- <br />19-101 <br />DRAWING <br />INDEX <br />DRAVN BY <br />RN11 <br />MO.1 <br />SYMBOLS, ABBREVIATIONS, WSEC <br />COMPLIANCE, GENERAL NOTES AND <br />Clr-L-KCD BY <br />FJ <br />DRAWING INDEX <br />MO.2 <br />MECHANICAL SCHEDULES, <br />DDC CONTROLS DIAGRAM AND POINTS LIST <br />MO.3 <br />SPECIFICATIONS <br />MO.4 <br />SPECIFICATIONS <br />110 19 <br />MO.5 <br />SPECIFICATIONS <br />M2.0 <br />LEVEL B FLOOR <br />PLAN - <br />SECTOR <br />F <br />- PLUMBING <br />I-E GE ND��'{"'°�l�B1�,;'"RE�R� <br />M2.1 <br />LEVEL G FLOOR <br />PLAN - <br />SECTOR <br />F <br />- PLUMBING <br />11�R11����I <br />� h ail "E"i <br />M3.1 <br />LEVEL G FLOOR <br />PLAN - <br />SECTOR <br />F <br />- MEDICAL GAS PIPING <br />o;I .�1� <br />M 4.1 <br />LEVEL G FLOOR <br />PLAN - <br />SECTOR <br />F <br />- HVAC <br />P a , o <br />��� ���"�" E."I" ��m�� ��°�� 1���� <br />�� <br />11 <br />M5.1 <br />LEVEL G FLOOR <br />PLAN - <br />SECTOR <br />F <br />- HVAC PIPING <br />11maa)Ri!1i`M N1(3i <br />INDEX <br />M6.1 <br />LEVEL G FLOOR <br />PLAN - <br />SECTOR <br />F <br />- FIRE PROTECTION <br />M7.1 <br />DETAILS1��i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.