My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2312 W CASINO RD 2020 COMMUNITY TRANSIT Plans 2022-12-02
>
Address Records
>
W CASINO RD
>
2312
>
COMMUNITY TRANSIT
>
Plans
>
2312 W CASINO RD 2020 COMMUNITY TRANSIT Plans 2022-12-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2022 12:24:46 PM
Creation date
5/10/2022 4:28:38 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2312
Tenant Name
COMMUNITY TRANSIT
Permit
B2003-012
Year
2020
Notes
EXISTING BUILDING RENOVATED INTO NEW ADMINISTRATIVE OFFICE
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LL <br />LL <br />z <br />C <br />C <br />LL <br />F-- <br />C <br />V <br />V <br />LL <br />V-6" <br />_ PLANTER SETI <br />1 1 /2" = V-0" <br />WALL FINISH PER INTERIOR <br />ELEVATION WHERE OCCURS <br />PAINT INSIDE OF PLANTER CASE BLACK <br />LINER PROVIDED BY PLANT SUPPLIER <br />WD-2 APPLIED TO TOP OF CASE. NEW <br />CUT SIDE IN. <br />PLYWOOD STRETCHERS AT 3'-6" MAX. <br />SPACING. PAINT BLACK <br />WD-2 APPLIED TO CASE ON ALL EXPOSED <br />SIDES AND FACES <br />FINISH NON EXPOSED SIDE OF CASE <br />WITH CABINET GRADE PLYWOOD. <br />CASE BODY, CABINET GRADE PLYWOOD <br />(2) CONTINUOUS 2x4" BASE RAILS <br />WITH STRETCHERS AT 24" OC <br />FINISHED FLOOR <br />TILE FLOOR CARPET <br />CENTER OF DOOR, WHERE <br />APPLICABLE <br />METAL TRANSITION STRIP <br />CARPET TO BE 1/8" ABOVE <br />` FINISHED TILE FLOOR <br />f <br />� f <br />LEVELING COMPOUND AS REQ <br />I <br />I I III <br />,;J,;— CONCRETE SLAB <br />5 TILE TO CARPET TRANSITION <br />6" V-0" <br />LU <br />Tr7P PER ELEVATION, RETURNS TO <br />OOR <br />O <br />LU <br />LATER SUPPORT, P-LAM ON ALL <br />POSED SIDES <br />TAMING <br />IN E OF TOP ABOVE <br />t-V <br />EQ <br />EQ <br />CL <br />CL <br />RESILIENT <br />FLOOR <br />CONCRETE <br />FACE OF WALL <br />BACKSPLASH RETURNS PER <br />2'- 1 ELEVATIONS <br />BACKSPLASH AND COUNTERTOP <br />PER ELEVATION <br />CABINET BODY - 314" MDF WITH <br />r., <br />PLASTIC LAMINATE FINISHED END <br />PANELS, FACE, & EDGES <br />� - - 4" RAIL AT TOP AND BOTTOM <br />OF CABINET <br />4 0 1 /4" MDF BACK WITH <br />MATCHING PLASTIC LAMINATE <br />FACE, DADO INTO SHELVES AND <br />ENDS <br />ADJ SHELVES - 3/4" MDF WITH PLASTIC <br />LAMINATE ALL SIDES WITH MATCHING <br />PLASTIC LAMINATE FRONT EDGE. <br />° PROVIDE (4) MTL SUPPORT CLIPS PER <br />SHELF AND MOUNTING HOLES AT32 <br />° MM OC IN END PANELS <br />PLASTIC LAMINATE FIXED BOTTOM <br />SHELF <br />- BASE PER ELEVATION <br />(2) CONTINUOUS 4" H BASE RAILS <br />WITH STRETCHERS AT 24" OC <br />FINISHED FLOOR - SHIM AS REQ <br />TO LEVEL <br />3 LOWER CABINET IT II <br />1 1/2" V 0" <br />CENTER OF DOOR <br />(WHERE APPLICABLE) <br />RESILIENT FLOOR PER SCHEDULE <br />FLOOR FILL TAPER 1/8" PER FT <br />AS REQUIRED <br />METAL TRANSITION STRIP <br />CONCRETE <br />6 RESILIENT TO CONCRETE <br />6" 1'-01 <br />TOP PER ELEVATION, RETURNS TO <br />FLOOR <br />:ENTER SUPPORT, P-LAM ON ALL <br />EXPOSED SIDES <br />FRAMING <br />FINISHED FLOOR <br />10 KITCHEN ISLAND LEG <br />1 1 /2" = V-0` <br />c e <br />Uj <br />CENTER OF DOOR <br />(WHERE APPLICABLE) <br />RESILIENT FLOOR PER SCHEDULE <br />FLOOR FILL TAPER 1/8" PER FT <br />AS REQUIRED <br />CARPET <br />RUBBER TRANSITION STRIP <br />CONCRETE SLAB <br />RESILIENT FLOOR TO CARPET <br />6" V-0" <br />KITCHEN ISLAND TOP <br />1 1 /2" = 1 '-0" <br />TOP PER ELEVATION, <br />RETURNS TO FLOOR AT BASE <br />LEG END <br />\IE OF BASE LEG <br />I� BEYOND <br />CENTER SUPPORT, P-LAM <br />ON ALL EXPOSED SIDES <br />RESILIENT <br />FLOOR <br />r <br />CONCRETE <br />CENTER OF DOOR <br />(WHERE APPLICABLE) <br />CARPET TILE PER SCHEDULE <br />FLOOR FILL TAPER 1/8" PER FT <br />AS REQUIRED <br />METAL TRANSITION STRIP <br />CONCRETE SLAB <br />4 RESILIENT O CONCRETE <br />6„ _ 1;_0" <br />TILE RESILIENT FLOOR <br />I <br />6 <br />,f - CENTER OF DOOR, WHERE <br />i X <br />APPLICABLE <br />CERAMIC TILE PER SCHEDULE <br />j l <br />,r <br />4 r �✓ <br />i 1 I t <br />°G METAL TRANSITION STRIP <br />i <br />RESILIENT FLOOR <br />f ADHESIVE <br />r <br />— -- CONCRETE SLAB <br />THIN SET TILE ADHESIVE <br />__.. <br />1 UNCOUPELING MEMBRANE, <br />SCHLUTER DITRA OR APPROVED <br />ALTERNATE <br />FACE OF WALL <br />2'- 1' BACKSPLASH RETURNS PER <br />ELEVATIONS <br />C UNLESS OTHERWISE NOTED <br />BACKSPLASH AND COUNTERTOP <br />PER ELEVATION <br />4" RAIL AT TOP AND BOTTOM OF <br />CABINET <br />1/2" MDF DRAWER SIDES, BACK, <br />AND FRONT WITH WHITE RESIN TOP <br />— FULL EXTENSION HEAVY COAT AND PVC EDGE BANDING. 114" <br />MATCHING BOTTOM, TYP <br />LIDS, TYP DUTY DRAWER GE <br />_ CABINET BODY - 3/4" MDF WITH <br />PLASTIC LAMINATE FINISHED <br />END PANELS, FACE, & EDGES <br />'PULLS PER SPEC. SEE TYP. 1/4" MDF BACK WITH RESIN TOP <br />c PULL LAYOUT FOR COAT, DADO INTO SHELVES AND <br />PLACEMENT, SHEET ID2.08 ENDS <br />— DRAWER FACE - 3/4" MDF WITH <br />— — — — — — PLASTIC LAMINATE FACE AND <br />BACK WITH MATCHING PLASTIC <br />LAMINATE OR MATCHING PVC <br />EDGE BANDING <br />I I <br />— HINGE WITH MAGNETIC TOUCH <br />o I EQUIPMENT AREA I LATCH ON OPPOSITE SIDE <br />LU <br />I I AV CABINET QUIET COOLING BLOWER <br />- - - — - J SYSTEM FOR VENTILATION <br />(2) CONTINUOUS 4" H BASE RAILS <br />r WITH STRETCHERS AT 24" OC <br />f <br />3 <br />AllFINISHED FLOOR - SHIM AS REQ <br />TO LEVEL <br />BASE PER ELEVATION <br />LOWER CABINET W/DRAWERS AND VENT_ <br />12 <br />1 1/2" = 1' 0" <br />Otak Architects, Inc. <br />808 SW Third Avenue, Suite 300 <br />Portland, OR 97204 <br />main 503.287.6825 <br />www.otak.com <br />STAM P <br />LANKROM <br />THWEST DAVIS, <br />00 <br />N D, O R 97209 <br />45.7100 <br />MOISAN ARCHITEJINC. <br />CONSULTANT <br />Uj <br />op <br />cc, <br />0 <br />0�1 <br />0 <br />I <br />� <br />Cr <br />w <br />TITLE <br />DATE DESC <br />C 05,20,2020 PLAN <br />RIPTION <br />REVISIONS <br />REVISIONS <br />EL SW <br />DRAWN BY CHECK BY <br />100% ISSUE. SET/BID SET <br />STATUS <br />04.17.2020 <br />DATE <br />191040 <br />PROJECT NUMBER <br />ID2mlO <br />0 2017 OTAK, INC. <br />If this drawing is not 24" x 36", it has been <br />reduced/enlarged. Scale accordingly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.