Laserfiche WebLink
FEEDER SCHEDULE <br />TAG CONDUIT + CONDUCTORS <br />303 /499G, 3 10, #10G <br />603 1 99C, 34, #10G <br />04 101 /` "C, 4 3, #1OG <br />703 1 "C, 4, #8G <br />1503 101 /2"C, 3 1 /O, #6G <br />1600 (4 SETS) 499C, 4 OGKcmiL, 4/OG <br />2000 (5 SETS) 498C, 4 00kmiL, #250kmil G <br />2000a (5 SETS) 3-1/2 91 C, 4 6OOKcmil <br />2254 399G, 4 3OOKcmil, ` 4G <br />3503 399G, 50OKcmil, #3G <br />6004 (2 SETS) 3-1 /289G, 4 50OKcmil, #1G <br />8004 (3 SETS) 329C, 4 400 cmll, 1 /GG <br />2V2 2P8 2P6 2F'+ 2P2 <br />A[2�C AIC ] 22K 22K <br />AIC FlIC A5C <br />EXISTING UTILITY <br />TRANSFORMER <br />ROOF <br />ANU-2 ANU-1 <br />@:0 D-3 I3503 <br />NEW UTILITY <br />TRANSFORMER <br />BY SNOPUD <br />SWITCHBOARD 4a1 <br />480/277V 30 4W 50KAIC <br />I I I <br />I I <br />I I I <br />M I <br />j 1 30/3 l 2000/3 <br />I I I <br />I I I <br />VSS 2d00 <br />50KAIC 1 160U 16Q0,-�� <br />600/3Y °^�� GENERATOR <br />Gi"I <br />I INVERTER 41 <br />I I 00/ e I .....�_ _._ - 50K <br />I AIC <br />PANEL 2D1 <br />20 /12 V <br />30 4' <br />KAIG <br />2V1 I 2P7 I 2P5I 2P3 I 2P1 1 0 3#1/0_ SSG IN 2"C <br />DATA CENTER <br />EQUIPMENT PER <br />SHEET E. 10 <br />DATA CENTER <br />UPS, PANEL <br />0 <br />0 <br />04 <br />1 <br />Cq <br />0 <br />9 <br />0 <br />0 <br />1 <br />L0 <br />LO <br />4L1 4P 1 <br />__ t <br />T) @�4 <br />50K 50K I mil" <br />AIC AIC INTERCEPT EXISTING <br />S-3 FEEDER -_-� <br />TRANSFORMER <br />3112.KVA I <br />I 480— 08/120V <br />30 4 <br />EXISTING SWITCHBOARD S-3 4 0/277V 30 4W 600A <br />1. PROVIDE ALL EQUIPMENT SHOWN UNLESS <br />NOTED OTHERWISE. <br />NOTESKEYED <br />1 2000A 3—POLE AUTOMATIC TRANSFER SNITCH, <br />OPTIONAL STANDBY. <br />1OKW LEGALLY REQUIRED STANDBY POWER <br />INVERTER, CAPABLE OF FULL OUTPUT ON <br />BATTERY FOR AT LEAST 90 MINUTES, OUTPUT <br />TO BE FULLY COMPATIBLE <br />DRIVERS CONNECTED TO THIS SYSTEM. <br />SUBMETER ALL 4 0V HVAG LOADS PER <br />ASHINGTON STATE ENERGY GODS G400g <br />COORDINATE WITH MECHANICAL FOR ANY <br />METERING OF WATER HEATERS. <br />4 SUBMLTER ALL DATA CENTER LOADS WITH <br />DISPLAY PANEL LOCATED IN ROOM 117. <br />(� SUBMEiER S-3 FEEDER. <br />�6 PROVIDE SHUNT TRIP BREAKER 7O ALLOW FOR <br />FUTURE LOAD SHEDDING OF PANEL. <br />ESTIMATED ELEVATOR SIZE, CONFIRM SUBMITTED <br />ELEVATOR ELECTRICAL REQUIREMENTS PRIOR TO <br />i 600A <br />SSA � 150A � 20OA ( 150A ( 110A � <br />I I <br />-- <br />Otak Architects, Inc <br />808 SW Third Avenue, Suite 800 <br />Portland, OR 97204 <br />main 503.287.6825 <br />www.Qtak.com <br />CONSULTANT <br />0 <br />00 <br />W <br />I TITLE <br /># DATE DESCRIPTION <br />I REVISIONS <br />CATS SAB <br />DRAWN BY CHECKBY <br />100% ISSUE SET/BID SET <br />STATUS <br />41l7/2020 <br />DATE <br />328801 <br />PROJECT NUMBER <br />O 2020 OTAK, INC, <br />If this drawing is not 24"x 36`, it has been <br />reduced/enlarged. Scale accordingly. <br />A <br />