Laserfiche WebLink
SIMPSON SIDS 1/4x6 SCREWS I 0.148"x3" NAILS <br />AT 4" OC, STAGGER 1 /12" I AT 4" OC <br />I (N) FLOOR TOPPING, TYP, <br />REF ARCH <br />(E) FLOOR SHEATHING I ! RNE) FLOOR F PLANS SHEATHING, <br />(E) FLOOR DECKING <br />(N) FLOOR JOIST, REF <br />PLANS W/ SIMPSON <br />LUS HANGER <br />(N) 2x8 LEDGER W/ SIMPSON <br />SOWS 0.22x5 SCREWS AT 6" OC <br />STAGGERED TO BEAD <br />(N) FLOOR BEAM, —' <br />REF PLANS <br />DEFLECTION TOP <br />TRACK IS REQUIRED <br />NON -BEARING METAL <br />STUD WALL, TYP, <br />REF ARCH <br />INFILL FLOOR EDGE o JOIST PEP <br />SIMPSON SOS 114x6 SCREWS <br />AT 4" OC, STAGGER 1 /12' <br />NEW SHAFT <br />(N) FLOOR BEAM <br />REF PLANS <br />DEFLECTION TOP <br />TRACK IS REQUIRED <br />NON -BEARING METAL <br />STUD WALL, REF ARCH <br />WHERE OCCURS, TYB <br />NEW FLOOR BEAM AT SHAFT <br />lit = I i Oii <br />SIMPSON SIDS 1/4x6 SCREWS <br />AT 4" OC, STAGGERED 1 /12" <br />NEW SHAFT� <br />NON -BEARING METAL <br />STUD WALL, REF ARCH, <br />WHERE OCCURS, TYP <br />NEW FLOOR BEAM AT SHAFT <br />11 � ej 9m�94 <br />0.148"x3" NAILS <br />AT 4' OC <br />(N) FLOOR TOPPING, <br />REF ARCM <br />(N) FLOOR SHEATHING, <br />REF PLANS <br />(N) FLOOR MOIST, <br />REF PLANS <br />SIMPSON LUS HANGER <br />(N) 2x8 LEDGER WiTH (2) <br />SIMPSON SIDWS 0.224 <br />SCREWS AT 16" OC TO BEAM <br />DEFLF <br />TRACKI� <br />INFILL WALL EDGE ADJACENT TO SHAFT <br />.00R TOPPING, REF ARCH <br />FLOOR SHEATHING <br />FLOOR DECKING <br />FLOOR BEAM <br />®AM HANGER, <br />HF PLANS <br />(N) FLOOR TOPPING, <br />REF ARCH <br />FLOOR SHEATHING, <br />REF PLAN <br />(E) FLOOR DECKING <br />APSON SIDS 1/4x6 SCREWS <br />4" OC, STAGGER 1 112" <br />.OVIDE SHIM PLATE <br />(N) FLOOR BEAM, <br />REF PLANS <br />NON -BEARING METAL <br />STUD WALL, TYP, <br />REF ARCH <br />SIMPSON SIDS 1/4x6 SCREWS <br />AT 4" OC STAGGERED 1 /12" <br />0.148"x3" NAILS AT 4" OC <br />(N) FLOOR SHEATHING, <br />REF PLANS <br />(N) BRIDGE JOIST, —' <br />REF PLANS <br />SIMPSON HU28 SKEWED <br />HANGER EA JOiST <br />(N) 2x8 LEDGER W/ SIMPSON <br />SOWS 0.22x5 SCREWS AT 6" OC <br />STAGGERED TO BEAM <br />3RID E JOISTS TO FL <br />AB Ac <br />GUARD RAIL, <br />BY OTHERS <br />0.148"x3" NAILS AT 4" OC <br />(N) FLOOR BEAM, <br />REF PLAN <br />BRIDGE BEAM <br />(N) FLOOR TOPPING, <br />REF ARCH <br />FLOOR SHEATHING, <br />REF PLAN <br />(N) FLO( <br />I <br />DEFLE <br />TRACK IS <br />it] 11-011 <br />SIMPSON SOS 1/4x6 SCREWS <br />AT 4" OC, STAGGER 1 /12" <br />(E) FLOOR SHEATHING —1 <br />(N) FLOOR TOPPING, <br />REF ARCH <br />(E) FLOOR SHEATHING <br />(E) FLOOR DECKING <br />cv <br />(N) FLOOR BEAM, <br />REF PLANS <br />'— FLOOR JOIST, <br />REF PLAN <br />SIMPSON LUS <br />HANGER <br />6HAUINU, MiN <br />BASE PL 3/4x1 <br />SIDE PL 1/4x4 1/2x0' 7" <br />EA SIDE OF BLKG WITH <br />(2) 3/4" DIA THRU-BOLTS <br />SIDE PL 3/8x1/2x1'-2" EA <br />SIDE OF BEAM WITH (4) <br />3/4" DIA THRU-BOLTS <br />(N) <br />0.148"x3" NAILS <br />AT 4" OC <br />(N) FLOOR BEAM, <br />REF PLAN FLOOR DECKING, <br />REF PLANS <br />NEW SHAFT <br />NON -BEARING METAL <br />STUD WALL, TYP, SIDE PL 1/4x6 EA SIDE OF <br />REF ARCH BEAM WiTH (2) 3/4" DIA <br />THRU-BOLTS <br />(N) FLOOR TOPPING, <br />I 0.146"x3" NAILS REF ARCM <br />f I AT 4" OC FLOOR SHEATHING, <br />REF PLAN <br />(E) FLOOR DECKING <br />(N) FLOOR BEAM, j { <br />REF PLANS I I <br />DEFLECTION TOP I I <br />TRACK iS REQUIRED I I <br />I I 3/4 OF TYP JOIST <br />I SPACING, MIN <br />NON -BEARING METAL <br />STUD WALL, TYP, <br />REF ARCH <br />° INFILL FLOOR EDGE JOIST PARALLEL <br />(N) FLOOR JOIST, <br />REF PLAN <br />(N) 2x8 LEDGER WITH (2) <br />SIMPSON SDWS 0.22x5 <br />SCREWS AT 16" OC TO BEAM <br />(N) FLOOR E <br />REF F <br />FLOOR BEAM TO FLOOR BEAM <br />0 lit = 1 i0oIP <br />(N) STRAP, WHERE <br />OCCURS, REF PLANS <br />(N) FLOOR SHEATHING —1 <br />(N) BRIDGE BEAM, —' <br />REF PLANS <br />SIMPSON MGU5.62-SDS <br />SKEWED HANGER <br />BRIDGE BEAM -TO FLOOR BEAM <br />{AI\ �i1�fCi !"Cl9 <br />FLOOR SHT'G, <br />REF PLANS <br />\Ptil P::LOOR BEAM, <br />REF PLANS <br />(N) MECH UNIT, REF PLAN —� <br />CURB PER MANUF <br />(N) 4x6 BLOCKING W/ SIMPSON <br />LUS HANGER EA END <br />ROOF EDGE NAILING <br />ROOF SHEATHING <br />(E) ROOF JOIST, REF PLAN <br />w <br />NEW ROOF BEAM AND JOIST AT MECH UNIT <br />(N) MECH UNIT, REF PLAN <br />CURB PER MANUF <br />SIDE PL TO <br />BASE PL <br />ROOF EDGE NAILING <br />ROOF SHEATHING <br />IDE PL TO <br />IDE PL <br />- — — <br />(E) ROOF JOIST, <br />REF PLAN <br />SE <br />BLKG, <br />/ S6,05 <br />)NN <br />(N) FLOOR TOPPING, <br />REF ARCH <br />(E) FLOOR SHEATHING <br />NEW ROOF BEAM AND JOIST AT MECH UNIT <br />(N) ROOF JOISTS, REF PLAN <br />SIMPSON HUCQ412-SDS HANGER <br />(N) ROOF BEAM, REF PLAN <br />(N) ROOF JOISTS, FIEF PLAN <br />SIMPSON LUS HANGER <br />(N) ROOF BEAM, REF PLAN <br />(E) ROOF SHT'G <br />�— (E) ROOF JOIST, TYP <br />(N) 1-3/4" x 11-7/8"x[(E) BM LENGTH - V-0"] LVL EA SIDE OF <br />(E) BEAM W/ 0,220 DIA x 5" SIMPSON SOWS SCREWS AT <br />12" OC TOP AND BOTTOM, STAGGERED OFFSET <br />SCREWS EACH SIDE OF BEAM A MINIMUM OF 4" <br />(E) ROOF BEAM <br />EXISTING ROOF BEAM REINFORCEMENT <br />(E) FLOOR DECKING (N) SKYLIGHT BY OTHERS <br />ROOF CURB <br />(E) ROOF SHEATHING <br />(N) ROOF JOIST, <br />REF PLAN <br />(N) FLOOR BEAM, <br />REF PLANS <br />NEW ROOF BEAM AT SKYLIGHT <br />ROOF EDGE NAILING <br />(N) ROOF BEAM REF PLAN <br />,a <br />ICH <br />17700 SW Upper Beanes Ferry Rd, <br />Suite 9115 <br />Portland, Oregon 97224 <br />Office: (503) 624-7005 <br />Portland, OR. I Bend, OR. I Denver, CO. <br />Froelich-engineers.ccrn I FE9, 19-T172 <br />CONSULTANT <br />TITLE <br />#/: DATE DESCRI <br />6 5/20/2020 PERMIT F <br />C 5/20/2020 PLAN RE <br />'TION <br />;EVIEW 1 <br />/ISIONS <br />REVISIONS <br />Author Checker <br />DRAWN BY CHECK BY <br />100% ISSUE SET/BID SET <br />STATUS <br />04/17/2020 <br />DATE <br />328801 <br />PROJECT NUMBER <br />© 2020 OTAK, INC. <br />If this drawing is not 24"x 36", it has been <br />reduced/enlarged. Scale accordingly, <br />11 0 +i P�p�ll <br />1 iP ® 11-011 <br />