Laserfiche WebLink
CL <br />66 <br />77 <br />0 <br />a <br />�I <br />ANNEL HEADER, <br />PLANS <br />COLUMN CAP AS <br />OCCURS, REF <br />DETAIL 4 / S6.21 <br />L5x3-1/2x5/16 LLH, REF <br />10 / S6.21 SCHEDULE, <br />FOR BOLT REQUIREMENTS, <br />KNIFE -THROUGH COLUMN <br />11 N C-CHANNEL HEADER TO HSS COLUMN <br />�G1.21 1 91 e 1 9c0 <br />R9 <br />NOTE: <br />DETAIL APPLIES AT CONDITIONS <br />WHERE BEAM OCCURS ON ONLY ONE <br />SIDE OF COLUMN, REF PLAN <br />(3) SIDES (TYP <br />__<COL) <br />TOP ANGLE <br />HSS COLUMN, FIEF PLAN <br />5/16 <br />1/2" DIA ERECTION BOLT AS REO'D <br />3/8" CAP PL TYP —� <br />-- - -) <br />HSS BEAM, REF PLAN <br />SHEAR PL FOR WE BEAM, - <br />— — <br />REF DETAIL XXXXXX <br />I I <br />1/2" <br />II <br />II <br />GAP <br />II <br />II <br />L4xt" TOP <br />(3) SIDES (TYP <br />(TYP) <br />TOPANDBOT <br />5/16 <br />ANGLE TO <br />TYP BOBEAM) <br />ANGLE TO <br />COL <br />12 LISS BEAM TO USS COLUMN <br />(E) CONC WALL <br />1/4I� L PL3/8"x4"xAS SHOWN WITH <br />1/4� (2) SIMPSON TITEN HD <br />5/3"x4" SCREW ANCHORS <br />HSS STRONGBACK, - <br />REF PLAN & ELEVATIONS <br />HSS TRONGBACK TO CONCRETE WALL - PLAN VIE <br />11R 11op"Y <br />X64 <br />AT NORTH <br />WALL LINE <br />8 <br />AT EAST /WEST <br />(E) FLOOD LINE 56.01 WALL LINES <br />26 <br />m S5.0 <br />ev <br />C-CHANNEL HEADER WHERE. <br />OCCURS, REF PLAN & ELEVATIONS <br />FOR SIZE & CONNECTIONS <br />- (E) CONC WALL <br />NEW OPENING <br />(E) FLOOR LINE <br />HSS COLUMN, REF <br />PLAN & ELEVATIONS <br />(TYP EA SIDE) <br />CONNECTION TO (E) CONC <br />WALL REF DETAIL 13 / S6.21 <br />INSTALL HEADERS AND <br />STRONGIBACKS PRIOR <br />TO SAWCUT <br />q621 <br />TYP <br />1 /4 3" AT <br />12„ <br />1/4 3" AT <br />12" <br />1/4 <br />ME I AL DECK, REF PLAN <br />�I <br />600T 150-43 W/#8 SCREW <br />EA FLANGE EA STUD <br />600S 162-43 AT 16" OC <br />#12 SCREW EA STUD <br />TO ANGLE <br />600T150-54 W/ #0 SCREW <br />EA FLANGE EA STUD <br />L6x4x3/8 x CONT (LLH) <br />BEAM NOT AT SiM 1/4 3" AT <br />1 1 /2" 12" <br />CONDITION a 3" AT <br />1/. 12„ <br />HSS PER PLAN <br />- SIDE PL 1/4"x3 1/2"x6" EA SIDE <br />OF HSS WI (2,) 3/4" DIA BOLTS <br />PARAPET ROOF AT VESTIBULE - METAL PANEL WALL <br />111 e 11-011 <br />(3) 80OS162-43 JOISTS <br />r 5/8" PLYWOOD SHTG <br />DRAIN, REF ARCH -J I <br />i <br />HSS BEAM, REF PLAN <br />I ( <br />HSS COLUMN BEYOND I <br />IN WALL <br />HSS CANOPY BM, <br />REF PLAN <br />3/8 <br />CANOPY CONNECTION DETAIL <br />111 0 1/O01I <br />LIGHT GAUGE BOX BM W/ 600T150-54 <br />TRACKS AND 120OS162-54 SIDE STUDS <br />FASTEN TRACK FLANGES TO SIDE <br />STUDS W/ #10 AT 8" OC <br />_ CAP PL 3/8" <br />1/4 0'- 0 3/8" <br />TYP <br />© I II I <br />ID <br />OI II IO <br />� II <br />III <br />II <br />II <br />BEAM, REF PLAN FOR SIZE II REF DETAIL 1/S6.21 <br />AND CONNECTION, TYP FOR SHEAR TADS <br />WE COL, REF PLAN <br />WF COL <br />CAP PL 3/8" <br />1/4 0'- 0 3/8" <br />11, TYP <br />0I[ !I0° <br />01l 1Ip <br />01 1 0 <br />BEAM, REF FLAN FOR SIZE —� I I i- REF DETAIL 1/S6.21 <br />AND CONNECTION, TYP FOR SHEAR TABS <br />HSS COL, REF PLAN <br />HSS COL <br />3/8l / <br />V 1/2" MAX POLYCARBONATE <br />AND ATTACHMENT BY <br />5/16 OTHERS <br />VVT8x18 TAPERED <br />AS SHOWN <br />PL 5/8"x8"x8" <br />191 11-d99 <br />FULL HT SHEAR PL CONNECT PURLIN TO <br />ABOVE COLUMN EACH BEAM, REF 1 / S6.21 <br />SIDE, REF 1 / S6.21 <br />1/2" <br />CONT BEAM, - <br />REF PLAN <br />1/4 <br />(4) SIDES <br />114 <br />1/4 <br />aim "mmam <br />°- PURLIN, REF PLAN <br />PL 3/4"x8"x AS REQUIRED <br />W/ (2) 3/4" DIA A325 BOLTS <br />EACH SIDE OF COLUMN <br />HSS COLUMN, REF PLAN <br />PL 3/8" x 6" x 6" (TYP) <br />1-1/2" RET <br />TOP AN BOT 1/4 <br />1/4 <br />I/ //: <br />3/16 1 /4 N <br />j HSS COLUMN <br />BELOW, REF PLAN <br />L3x3x1/4 x 0'-4" 3/8" CAP PL <br />2" RET TOP <br />AND BOT 1/4 <br />PL318"x3"x7" <br />HSS BEAMS TO HSS COLUMN <br />1 99 1 1-011 <br />C-CHANNEL BEAM BOLTEDCONNECTION SCHEDULE <br />APPLICABLE C- <br />(NO) OF <br />PLATE <br />PLATE <br />WELD SIZE <br />HOLE ���� <br />CHANNEL SIZES <br />ANCHORS <br />THICKNESS, @6t66 <br />LE`NG H, "U" <br />1/4' BOTH <br />HORIZONTAL SHORT <br />C 8 x 11.5 <br />B C (2) <br />5016" <br />6„ <br />SIDES <br />SLOTTED HOLES IN PLATE <br />6+" <br />1/4" BOTH <br />HORIZONTAL SHORT <br />C 10 x 25 <br />(2) <br />5/161, <br />SIDES <br />SLOTTED HOLE. IN PLATE <br />MC 18 x, 45.8 <br />(5) <br />5/16" <br />15" <br />1/4" BOTH <br />HORIZONTAL SHORT <br />SIDES <br />SLOTTED HOLES IN PLATE <br />NOTE: <br />ANCHORS ARE TO BE SIMPSON T ITEN HD 5/8"x4" SCREW ANCHORS. <br />C-GU NNEL BEAM BOLTED CONNECTION SCHEDULE <br />11R o 1 f-d91 <br />a <br />F BEAM BOLTED CONNECTION SCHEDULE <br />APPLICABLE WF <br />BEAM SIZES <br />(NO) OF 3/4" DIA' <br />A325 BOLTS <br />PLATE <br />THICKNESS 66t66 <br />PLATE <br />LENGTH, IV- <br />HOLE SIZE <br />W8, W10 <br />(2) <br />5/16" <br />6" <br />STANDARD HOLE <br />W12, W14 <br />(3) <br />5/16" <br />9" <br />STANDARD HOLE <br />- <br />_ <br />W18 <br />(4) <br />FW15, 5/16" <br />------ 12" <br />STANDARD HOLE <br />W21 <br />(5) <br />3/81, <br />161 <br />STANDARD HOLE <br />V/V24 <br />(6) <br />3/8" <br />181, <br />HORIZONTAL SHORT <br />SLOTTED HOLES IN PLATE <br />COPE FLANGE <br />AS READ <br />NO WELD IN KWE BEAM, <br />JOINT 1/4 REF PLAN <br />I� <br />0 - <br />I0 <br />0 <br />CLR <br />L <br />FULL HT STIFF PL, 1 1/2" FULL HEIGHTSHEAR PL "t"x4 1/4"x"L", REF <br />MATCH SHEAF PL SCHEDULE FOR BOLT REQUIREMENTS <br />THICKNESS <br />WE BEAM, <br />REF PLAN <br />SINGLE SIDE <br />KfiF./'iP <br />I[pd <br />K c 1 1/2" <br />1 1/2 <br />1 1/2" < K < 2" <br />2 <br />2„ < K < 31, <br />3 <br />K > 3" <br />K <br />COPE FLANGE <br />AS READ <br />n WF BEAM, <br />REF PLAN <br />III <br />� � J <br />3/4( I <br />\-1 1/2" <br />SHEAF PL "t"x4 1/4"x"L" <br />1/4 REF SCHEDULE FOR <br />WE BEAM, BOLT REQUIREMENTS <br />REF PLAN <br />IN.DOUBL SIDED <br />1 TYPICAL BEAM TO BEAM BOLTED CONNECTION <br />�a ,21 lit <br />c J I-011 <br />NOTE: <br />DETAIL APPLIES TO GIRDER BEAMS <br />(GIRDER BEAMS ARE MEMBERS <br />SUPPORTING ONE OR MORE OTHER <br />BEAMS) <br />3/4" TOP OF COLUMN WHERE <br />4 1/4`' TYP OCCURS, REF DETAIL 4/S6.21 <br />1YP <br />WE BEAM, WE BEAM, <br />REF PLAN REF PLAN <br />I <br />CL <br />II II <br />L1 L -1 <br />I I <br />2" RET TOP I I <br />AND BOT SHEAR PL"t"x"L" REF SCHED 1 1/2" <br />1/S6.21 FOR BOLT REQUIREMENTS, TYP I I 1/2" PROTRUSION <br />KNIFE PL THROUGH COLUMN I I <br />I <br />REF\ HSS COLUMN REF PLAN, SLOT AS <br />SCHEDULE REQD FOR PLATE. SLOT SHALL BE <br />1/S6.21 1/16" WIDER THAN PLATE <br />L4x3x1/4 x CONT (LLV) WITH <br />SIMPSON T ITEN HD 1/2"x4" SCREW <br />ANCHORS AT 24" OC AND WITHIN <br />8" OF ANGLE ENDS IN A 1-1/2" <br />VERTICALLY SLOTTED HOLE <br />STEEL DECKING, <br />REF PLAN <br />WF BEAM, <br />n REF PLAN <br />(E) CONC WALL <br />STEEL DECKING TO EXISTING CONCRETE WALL <br />1 1/2" 0 1 96011 <br />TYPICAL BEAM TO HSS COLUMN BOLTED CONNECTI <br />119 0 19m011 <br />KNIFE PL "t°x"L" REF (5/8T) <br />SCHEDULE ON DETAIL 2/S6.21 <br />CL OF BEAM AND COLUMN - !0 REF DETAIL <br />-1 , 1/56,21 <br />r. > <br />SHEAR PL"Vx4 1/4"x"L" <br />REF DETAIL 1/S6.21 <br />„B,' - <br />PL "t`x(B+1)x°L" <br />V111 �� <br />— HSS COLUMN, REF PLAN <br />KNIFE PL "Cx"L"", REF <br />DETAIL 1 /56.21 <br />1/4 <br />CL OF BEAM AND COLUMN REF DETAIL <br />1/S6.21 <br />SHEAR PL 'T'x4 1/4"x"L" <br />REF DETAIL 1/S6.21 <br />FOR T<318: <br />PL-"t"x(B-1)x"L" <br />FOR T> 3/8: <br />"rr PL 'T'x(B-1 1/2)x"L" <br />HSS COLUMN, REF PLAN <br />CITY 01F EVE ETT' <br />J r RVi°t r C I, i ure PCG`y <br />j)(PI kL MULTI -SIDED BEAM TO HSS COLUMN CONNECTIONS — <br />111 = 1'®019 <br />FROUICH <br />ENGINEERS-. <br />17700 SW Upper Bccnes Ferry Rd. <br />Suite #115 <br />Portland, Oregon 97224 <br />Office: f503) 624-7005 <br />Portland, OR. I Bend, OR. I Denver, CO. <br />Froelich-engineers.carrr�FE# 19- T 172 <br />CONSULTANT <br />0 <br />0 <br />LU <br />C) <br />Cq <br />00 <br />0 <br />z < <br />Ly <br />TITLE <br /># DATE <br />DESCRI <br />A 4/17/2020 <br />PLAN RED <br />B 5/20/2020 <br />PERMIT k <br />C 5/20/2020 <br />PLAN RE` <br />�T1ON <br />IISIONS <br />EVIEW 1 <br />/ISIONS <br />REVISIONS <br />Luther Checker <br />DRAWN BY CHECKBY <br />100% ISSUE SET/BID SET <br />OIATUS <br />)4/17/2020 <br />DATE <br />)28801 <br />PROJECT NUMBER <br />S6m2l <br />2020 OTAK, (NC <br />If this drawing is not 24"x 36" it has been <br />educedlenlarged. Scale accordingly. <br />