My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
600 54TH ST SW 2022-05-11
>
Address Records
>
54TH ST SW
>
600
>
600 54TH ST SW 2022-05-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2022 8:55:50 AM
Creation date
5/11/2022 8:55:38 AM
Metadata
Fields
Template:
Address Document
Street Name
54TH ST SW
Street Number
600
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/14/2022 Page 1 <br /> City of Everett <br /> 8:47:22AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. PW2001-017 Site Address 600 54TH ST SW <br /> Applied 1/16/2020 Applicant LEAVITT PAUL Lot <br /> Approved 10/13/2020 Owner KEYSTONE LAND LLC Block <br /> Issued 10/17/2020 Contractor OMNI CONTRACTING SOLUTIONS LLC Tract <br /> Parent Permit No. Description SEWER EXTENSION ALONG 54TH ST SW <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 10/13/2020 10/13/2020 PW EASEMENTS SEG RECEIVED Sewer main (10/13/2020 11:39 AM SEF) <br /> RECORDED easement Attached to record. <br /> 4/21/2021 4/21/2021 PERMIT KLC EXTENSION A COVID <br /> EXTENSION EXTENSION <br /> 5/19/2021 5/19/2021 PW 02-ONSITE JHK NOT READY eTRAKiT Inspection 5/18/2021 2:49 PM OMNI <br /> PRECON Request CONTRACTING SOLUTIONS LLC <br /> Contact Name:Don Williams <br /> Site Address:600 54TH ST SW <br /> Phone:4252822859 <br /> e-Mail:spencer@omnics.com <br /> 5/20/2021 5/20/2021 PW 02-ONSITE JHK APPROVAL <br /> PRECON <br /> 5/26/2021 5/26/2021 PW 05-SEWER JHK PARTIAL APPR (5/26/2021 3:17 PM JHK) <br /> MAIN INSTALL start sewer main install. <br /> 5/27/2021 5/27/2021 PW 05-SEWER JHK APPROVAL (5/27/2021 1:40 PM JHK) <br /> MAIN INSTALL Installing sewer main. <br /> 5/28/2021 5/28/2021 PW 14-ASPHALT JHK PARTIAL APPR (5/28/2021 2:02 PM JHK) <br /> SUBGRADE Preparing for asphalt restoration <br /> 5/28/2021 5/28/2021 PW 05-SEWER JHK PARTIAL APPR (5/28/2021 10:32 AM JHK) <br /> MAIN INSTALL Finishing sewer line <br /> 6/1/2021 6/1/2021 PW 15-ASPHALT JHK APPROVAL (6/1/2021 3:15 PM JHK) <br /> PAVING FINAL Paved sewer trench. <br /> 6/1/2021 6/1/2021 PW 05-SEWER JHK APPROVAL (6/1/2021 1:01 PM JHK) <br /> MAIN INSTALL Sewer complete <br /> 7/8/2021 7/8/2021 PW IYR PUBLIC SEG RECEIVED (7/19/2021 10:24 AM SEG) <br /> IMP WARRANTY Attached to permit record. <br /> 7/9/2021 7/15/2021 PW ASBUILTS JHK APPROVAL <br /> SUBMITTED <br /> 2/11/2022 2/11/2022 PW 25-SITE JHK APPRVD-PERN <br /> FINAL/PERMIT <br /> INSP12 C S'ISTE.MS <br />
The URL can be used to link to this page
Your browser does not support the video tag.