Laserfiche WebLink
FOUNDATION WALL <br />TRIM PORTION <br />OF FOOTING TO <br />FIT BRACKET <br />UNDER WALL <br />WORKING TRENCH <br />CRAWL SPACE n <br />\/A <br />/ X, <br />F \ \\ \ <br />a <br />\.. , <br />FOUNDATION <br />BRACKET <br />PIER SHAFT: <br />SEE <br />NOTES <br />SCALE.- 314" = 1 '-0" <br />FOUNDATION WALL <br />TRIM PORTION <br />OF FOOTING TO <br />CRAWL SPACE FIT BRACKET <br />UNDER WALL <br />WORKING TRENCH <br />Q <br />v r,. <br /><rX �f � \ <br />FOUNDATION <br />BRACKET <br />PIER SHAFT: <br />SEE NOTES <br />SCALE.- J/4" = 1 '-0" <br />2215 fN:d 3T3W <br />NCE <br />a AREA OF WORK <br />--WII HIN EXISTING .W <br />FOOTPRINT <br />i <br />G <br />0 <br />a <br />2 i s <br />a <br />" <br />i <br />NOT TO SCALE -- <br />- STREET SIN. Scale: 'I <br />NORTH <br />PILE INFORMAMN STRUCTURAL NOTES GENERAL NOTES <br />PIER NUMBER DESIGN PIER NUMBER DESIGN PIER NUMBER DESIGN 1. OESIGN CODES: IBC " 18, ➢RC '18 1. PIERS TO BE INSTALLED ACCORDING TO THE PUSH PIER INSTALLATION NOTES. <br />LOAD (LBS) LOAD (LBS) LOAD (LBS) ASCE 7-10/NDS-05 2. THE LOCATIONS AND DIMENSIONS ON THIS DRAWING ARE BASED ON MEASUREMENTS TAKEN WITH A <br />2. FLOOR LOADS: DL= 20 PSF, LL= 40 PSF TAPE MEASURE AND ARE RELIABLE FOR THE PURPOSE OF REPAIRING THE FOUNDATION FOR THE <br />1 6220 14 27 3. ROOF LOADS: DL= 10 PSF, LL= 25 PSF (SNOW) RESIDENCE. THIS DOCUMENT IS NOT A LEGAL SURVEY OF THE PROPERTY. � <br />2 6220 15 28 1 4, PIER CAPACITY: 16,500 LBS ALLOWABLE 3. THE CONTRACTOR IS RESPONSIBLE FOR: Ld <br />3 4 6220 16 29 5. MATERIALS (IF USED): 3.1. VERIFICATION OF SITE CONDITIONS, INCLUDING DIMENSIONS AND EXISTING CONDITIONS OF THE <br />4 5600 17 30 5.1. STEEL TUBE: 3°'O ASTM A513 (FY, MIN=70 KS➢). STRUCTURE. ED <br />5.2. STEEL ANGLE SECTIONS-. ASTM A36 (FY, MIN = 36 KSI) 3.2. SITE SAFETY AND WORKER PROTECTION. <br />5 6840 18 31 5.3, STEEL PLATE: ASTM A36 (FY, MIN 36 KSI). 3.3. FOLLOWING ALL LAWS AND REGULAT@ONS RELATED TO THE PROJECT. <br />6 r],, <br />60 19 32 5.4. CONCRETE: FC=3000 PSI (28 DAY). 3.4. LOCATING UNDERGROUND AND OVERHEAD UTILITIES. <br />7 5600 20 33 5.5. QUICK SET MORTAR=5000 PSI (28 DAY). 4. THE CONTRACTOR & OWNER SHALL REFERENCE THE ORIGINAL SIGNED PROPOSAL FOR THE SCOPE D <br />8 4980 21 34 6. THE CONTRACTOR IIS RESPONSIBLE FOR: OF ALL ITEMS IN THE PROJECT THAT MAY OR MAY NOT BE SHOWN IN THIS PIER LAYOUT DRAWING. <br />9 5600 22 35 6.1. VERIFICATION OF SITE CONDITIONS, DIMENSIONS, AND THESE ITEMS MAY INCLUDE (BUT IS NOT LIMITED TO)- z <br />EXISTING CONDITIONS OF THE STRUCTURE. 4.1. TEMPORARY RELOCATION OF ITEMS (DECK BOARDS, LANDSCAPING, ETC) FOR ACCESS TO THE <br />10 23 36 6.2. SITE SAFETY AND WORKER CONDITIONS FOUNDATION. <br />1 °I 24 37 6.3. FOLLOWING ALL LAWS AND REGULATION RELATED TO 4.2. WORK ITEMS THAT DO NOT REQUIRE A PERMIT (CONCRETE PATCHING, CRACK FILLING, ETC). z z <br />12 25 38 THE PROJECT. �" <br />13 26 39 7. THE PI LOCATION <br />OR AXIALAND RLOADING ONLYHEAD q �!�,- �/ C i <br />& GRIP-TITE FOUNDATION PIER SYSTEM SHALL BE INSTALLED IN <br />ACCORDANCE WITH ICC-ES EVALUATION DEPORT ESR-4891° <br />AND THE MANUFACTURER'S PUBLISHED INSTALLATION <br />IIv1STRUCT➢ON BY INSTALLERS CERTIFIED BY THE GRIP-TITE <br />MANUFACTURING COMPANY. THE INSTALLATION SHALL <br />COMPLY WITH THE APPROVED CONSTRUCTION DOCUMENTS <br />AND THIS REPORT <br />9. THE LIFTING BRACKET TO FOUNDATION CONNECTION IS NOT PUSH PIER INSTALLATION INSTRUCTIONS (BASED ON INSTRUCTIONS PROVIDED BY THE GRIP-TITE COMPANY) <br />REQUIRED AND COMPLIES WITH THE GRIP-TITE INSTALLATION (•` <br />DESIGN STANDARDS. 1. LOCATE ALL EXISTING UNDERGROUND AND OVERHEAD UTILITIES AT THE LOCATIONS OF THE PROPOSED PIERS <br />TO DETERMINE WHETHER THERE IS CONFLICT. <br />2. EXPOSE THE FOUNDATION AND FOOTING AT THE PROPOSED PIER LOCATIONS, TO A DEPTH OF 6 INCHES BELOW <br />THE BOTTOM OF FOOTING. <br />3. PLACE FIRST PIER NO FURTHER THAN 2 FEET FROM THE CORNER, AND DEPENDING ON THE CONDITION OF THE . ,. <br />FOOTING AND/OR THE WEIGHT OF THE STRUCTURE, PLACE PIERS EVERY 2 FEET TO 6 FEET ON -CENTER. THE 1923 North Broadway Ave. <br />PIERS, HOWEVER, SHOULD NOT BE PLACED MORE THAN 6 FEET APART. IF THERE ARE CRACKS IN THE FOOTING, SPRINGF➢ELLS, MISSOURI 65803 <br />PLACE A PIER UNDER EACH CRACK. 417-831-5550 ph <br />4. AFTER EXPOSING THE FOOTING, CLEAN OFF ALL FOREIGN MATERIAL FROM THE TOP OF THE FOOTING IN THE 417-831-5551 fax <br />AREAS WHERE THE PIERS ARE TO BE INSTALLED. DRILL 3/8-INCH HOLES THROUGH THE FOOTING FLANGE ABOUT Kevin Todd Moore, Registered <br />Professional Engineer, Lic. No. 54108 <br />3/4-INCH AWAY FROM THE STEM WALL USING A ROTARY HAMMER DRILL. DRILL THE HOLES EVERY TWO INCHES hfeorders@haymanengineering.com <br />ALONG THE FOOTING FLANGE FOR A TOTAL LENGTH OF 18 INCHES. AT THE END OF THE SECTION OF CONCRETE <br />TO BE REMOVED, DRILL 3/8-INCH DIAMETER HOLES EVERY TWO INCHES ALONG A LINE PERPENDICULAR TO THE +. w <br />STEM WALL TO THE OUTSIDE EDGE OF THE FOOTING FLANGE. COLD 'r <br />5. AFTER COMPLETION OF THE DRILLING, BREAK OFF THE 18-INCH LONG SECTION OF CONCRETE THAT WAS P <br />ISOLATED BY THE DRILLED HOLES. <br />6. SMOOTH THE JUST -BROKEN VERTICAL FACES OF THE CONCRETE USING APPROPRIATE TOOLS SO THAT TH44, <br />`'K£Vifl I�IC30S <br />BRACKET FITS FLUSH AGAINST THE FOOTING. ENSURE THAT THE FRONT OF THE FOOTING IS FLAT AND NOT <br />TAPERED IN EITHER DIRECTION.$2102 ®7 <br />�a t <br />T REMOVE THE SOIL FROM BENEATH THE FOOTING TO A DEPTH OF ABOUT SIX INCHES. THOROUGHLY CLEAN 1 `` �g 12 <br />FOOTING WHERE THE BRACKET IS TO BE INSTALLED. VERIFY THAT THE BOTTOM OF THE FOOTING IS LEVEL SIDE <br />TO SIDE AND FRONT TO BACK. MAKE THE BOTTOM OF THE FOOTING LEVEL IF IT IS NOT LEVEL UTILIZING HIGH Z, <br />STRENGTH GROUT OR SIMILAR MATERIAL. <br />8. POSITION THE PIER BRACKET INTO THE RAM CYLINDER ASSEMBLY NOTCH AND SECURE IT IN PLACE WITH <br />CRIBBING BENEATH THE PIER BRACKET. CONNECT THE HYDRAULIC RAM TO THE HYDRAULIC PUMP. CONNECT A <br />CALIBRATED HYDRAULIC PRESSURE GAUGE BETWEEN THE RAM AND THE PUMP. ENGAGE THE HYDRAULIC RAM C <br />UNTIL THE DRIVE CYLINDER HEAD IS TIGHT AGAINST THE STARTER TUBE. <br />9, BEGIN MONITORING THE FOUNDATION MOVEMENT AS THE PIERS ARE ADVANCED TO THE LOAD BEARING CO CO C:) Q <br />STRATUM. DO NOT EXCEED 4200 PSI (40,000 LBS) ON THE HYDRAULIC RAM (OR EQUIVALENT PRESSURE EQUAL TO < - <br />40,000 LBS DEPENDING ON THE GAGE CALIBRATION). ADDITIONAL TUBES ARE ADDED BY SLIDING THE ADDED < 0 E <br />TUBE INTO THE COUPLING ON THE JUST -INSTALLED TUBE. ADVANCE THE ADDITIONAL TUBES IN THE SAME <br />MANNER AS THE STARTER TUBE. THE CRIBBING UNDER THE BRACKET MUST BE KEPT TIGHT WHILE ADVANCING <br />THE PIERS (TUBES). "' IF MORE THAN ONE HYDRAULIC PUMP IS BEING USED, DO NOT PUSH TWO ADJACENT Lu <br />PIERS AT THE SAME TIME. THIS MAY RESULT IN A FALSE LIFT WHILE PUSHING THE PIERS TO THE LOAD BEARING mj CO <br />STRATA. <br />10. RAISE THE FOUNDATION UNTIL IT TOUCHES THE SILL PLATE AND THEN CONTINUE TO ADVANCE THE DRIVE TUBES Z <br />X <br />UNTIL THE SUITABLE BEARING STRATUM IS REACHED. LJ <br />11. SUITABLE BEARING STRATUM IS DEFINED BY A FORCE EQUAL TO 40,000 LBS OR UNTIL AN APPROXIMATE LIFT OF � <br />1/4 INCH OF THE STRUCTURE IS ACHIEVED. THE LOAD MUST BE HELD FOR 5 MINUTES WITHOUT 1/4 INCH OF <br />VERTICAL MOVEMENT OR ANY HYDRAULIC PRESSURE DROP. IF THE PIER SETTLES 1/4 INCH OR THE PRESSURE CN <br />DROPS, ADD ADDITIONAL PRESSURE TO THE PIER UNTIL THE 5 MINUTE HOLD TEST IS ACHIEVED. AT COMPLETION <br />OF A THE SUCCESSFUL 5 MINUTE HOLD, RECORD THE GAGE PRESSURE ON THE PIER LOG AND THE PIER WILL BE <br />CONSIDERED INSTALLED. rn <br />1'-018Z CN 5 <br />5°-0°' 5'-0" 5°-0" 4'-0"" 7'_0" 12. A MINIMUM OF 10% OF THE PIERS SHALL BE TESTED AS FOLLOWS. FOR EACH GROUP OF 10 PIERS, THE FIRST <br />PIER INSTALLED SHALL BE CONSIDERED THE TEST PIER. THE PIER SHALL. BE INSTALLED IN 18" INCREMENTS, M co <br />RECORDING THE HYDRAULIC GAGE PRESSURES ON THE GRIP-TITE PUSH PIER PRESSURE LOG AT EACH <br />04 <br />INCREMENT. CONTINUE THE INSTALLATION UNTIL THE PIER MEETS THE REQUIREMENTS OF INSTRUCTION #11 ev, 00 1' ' <br />13. THE ALLOWABLE PIER CAPACITY IS CALCULATED AS 50% OF THE MEASURED FORCE AS LOGGED OR 16,500 LBS <br />(MAXIMUM PER MANUFACTURER). <br />14. ONCE THE PIER IS INSTALLED, PREPARE THE TUBE SO A GRIP-TITE CAP CAN BE PLACED ON THE TUBE TO <br />PREPARE FOR LIFTING. THERE MUST BE A MINIMUM OF 6-1/2 INCHES OF TUBE PRESENT ABOVE THE TOP OF THE <br />BRACKET. <br />15. INSTALL THE GRIP-TITE REINFORCEMENT INSERT -TUBE INTO THE LAST PIER TUBE. CUT THE REINFORCEMENT <br />INSERT -TUBE 3 INCHES SHORTER THAN THE DISTANCE FROM THE TOP OF THE PIER TO THE COUPLER TO ALLOW <br />AN ADDITIONAL TUBE TO BE INSTALLED LATER. <br />16. REMOVE THE HYDRAULIC RAM AND REPEAT THE ABOVE STEPS FOR THE REMAINING PIERS, DOCUMENTING THE uj <br />FINAL DEPTHS AND GAGE PRESSURES FOR EACH PIER. <br />17. INSTALL THE GRIP-TITE PIER CAP AND BOLTS TO THE TUBE AND BRACKET. PLACE THE CAP ON TOP IF THE TUBE. <br />IF A GRIP-TITE LIFT CYLINDER IS BEING USED TO LIFT, THEN 1-1/2 TO 2 INCHES OF THE BOLT MUST BE EXPOSED <br />ABOVE THE NUT ON TOP OF THE CAP SO THAT THE LIFT CYLINDER CAN BE ATTACHED. IF A GRIP-TITE HYDRAULIC <br />RAM IS BEING USED TO LIFT, ABOUT 1/4 -INCH OF THE BOLT MUST BE EXPOSED ABOVE THE NUT ON TOP OF THE En 04 <br />CAP. ONCE THE CORRECT AMOUNT OF BOLT ABOVE THE NUT IS EXPOSED, RUN THE BOTTOM OF THE NUT UP 00 <br />HAND -TIGHT AGAINST THE BOTTOM OF THE BRACKET. TIGHTEN THE BOLTS EVENLY SO THAT THE CAP STAYS <br />LEVEL. <br />18. WITH THE CAP IN -PLACE AND THE BOLTS TIGHTENED, THE LIFT CYLINDER MAY BE INSTALLED. TO INSTALL THE <br />LIFT CYLINDER, SET IT ON THE CAP WITH THE CENTER OF LIFT -CYLINDER IN CENTER OF THE RAISED WELDED <br />CIRCLE ON THE CAP. SCREW THE COUPLER ON THE BOLT THAT IS ATTACHED TO THE LIFT CYLINDER TO THE <br />BRACKET BOLT THAT IS STICKING UP THROUGH THE CAP. SCREW THE COUPLER ON THE LIFT CYLINDER BOLT <br />UNTIL IT BOTTOMS OUT ON THE BRACKET BOLT. THE NUT ON THE TOP OF THE CAP MAY NEED TO BE ADJUSTED <br />TO MAKE SURE THAT THERE IS ENOUGH THREAD FOR THE COUPLER TO BE COMPLETELY SCREWED ONTO THE <br />BRACKET BOLT. THE COUPLER ON THE LIFT -CYLINDER -BOLT SHALL BE SCREWED ONTO THE LIFT CYLINDER BOLT <br />SO THAT THE TOP NUT ON THE BRACKET BOLT IS RESTING ON THE CAP. ADJUST THE NUT ON THE BOTTOM OF <br />THE BRACKET BOLT SO IT IS TIGHT AGAINST THE BOTTOM OF THE BRACKET. FINALLY, TIGHTEN THE NUT ON TOP <br />OF THE LIFT CYLINDER. IF A HYDRAULIC RAM IS BEING USED TO LIFT, THE HYDRAULIC RAM ONLY NEEDS TO BE CN <br />REATTACHED TO THE BRACKET. <br />19. ONCE A LIFT CYLINDER OR HYDRAULIC RAM HAS BEEN PLACED ON EACH PIER, CONNECT THE HYDRAULIC HOSES <br />TO EACH OF THE LIFTING DEVICES IN SERIES. <br />20. OPEN THE CONTROL VALVE ON THE LIFTING DEVICE CLOSEST TO THE PUMP. WITH THE PUMP CONTROL VALVE IN : <br />THE DRIVE POSITION, USE THE PENDANT CONTROL TO PRESSURIZE THE DEVICE TO 1,000 PSI. CLOSE THE VALVE u F <br />ON THE FIRST LIFTING DEVICE AND OPEN THE CONTROL VALVE ON THE SECOND LIFTING DEVICE. USE THE <br />PENDANT CONTROL TO PRESSURIZE THE SECOND LIFTING DEVICE TO 1,000 PSI. CONTINUE THIS PROCEDURE <br />UNTIL ALL OF THE LIFTING DEVICES HAVE BEEN PRESSURIZED TO 1,000 PSI MAKING SURE TO CLOSE ONE <br />CONTROL VALVE BEFORE OPENING THE NEXT ONE. 1 <br />21. ONCE THE HYDRAULIC PRESSURE TO EACH LIFTING DEVICE IS SET AT 1,000 PSI, THE STRUCTURE MAY BE LIFTED. ° ' ' T <br />OPEN ALL THE VALVES AT EACH LIFTING DEVICE AND APPLY PRESSURE. AFTER THE STRUCTURE HAS BEEN _ K <br />LIFTED TO THE DESIRED LEVEL, CLOSE THE CONTROL VALVES ON ALL OF THE LIFTING DEVICES. NEXT, TIGHTEN Q COPYRIVFI nFEIC2( 21 <br />ALL OF THE NUTS ON THE TOP AND BOTTOM OF THE BRACKET, WHICH WILL HOLD THE FOUNDATION IN PLACE. THESE PLANS ARE COPYRIGHTED <br />DISCONNECT THE LIFTING DEVICES AND REMOVE THE EQUIPMENT FROM THE EXCAVATIONS. AND ARE SUBJECT TO COPYRIGHT <br />PROTECTION UNDER SECTION 102 OF <br />22. BACKFILL THE EXCAVATIONS WITH THE EXCAVATED MATERIAL IF THE MATERIALS ARE SUITABLE. IN LANDSCAPED THE COPYRIGHT ACT OF 1990. THE <br />AREAS, PLACE THE SOIL IN LOOSE LIFTS NO GREATER THAN 12 INCHES IN THICKNESS. COMPACT EACH LIFT TO A PROTECTION INCLUDES BUT IS NOT <br />LIMITED TO THE OVERALL FORM AS <br />FIRM AND UNYIELDING CONDITION BEFORE PLACING SUBSEQUENT LIFTS. COMPACTION SHOULD BE PERFORMED WELL AS THE ARRANGEMENT AND <br />BY A MANUALLY OPERATED, UPRIGHT COMPACTOR GENERALLY REFERRED TO AS A JUMPING JACK. COMPOSITION OF THE SPACES AND <br />ELEMENTS OF THE DESIGN. <br />UNAUTHORIZED USE OF THESE <br />PLANS CAN LEGALLY RESULT IN THE <br />CESSATION OF CONSTRUCTION OF <br />THE PROJECT BEING SEIZED AND/OR <br />MONETARY COMPENSATION TO <br />HAYMAN ENGINEERING. <br />HAYMAN ENGINEERING DOES NOT RECOMMEND LIFTING. CONTRACTOR AND HOMEOWNER ASSUME ALL LIABILITY <br />FOR LIFTING. IF A LIFT IS DESIRED, TO PREVENT STRUCTURAL DAMAGE, LIFT CAREFULLY AND SLOWLY WHILE PROD. NO. HE21120001 <br />MONITORING THE FOUNDATION'S AND BUILDING'S CONDITIONS. CEASE THE LIFT IF THE BUILDING SHOWS EVIDENCE DRAWN <br />OF DISTRESS, KLR <br />Permit#: 62201E-020 DATE 1210712021 <br />' Site Address: 2225 103RD ST SW REVISION <br />*• e 0 <br />a Owner: WIGDAHLSONDA <br />a Tenant: [TenNa e] <br />App. Date: 1/111/2022 DWG. No. <br />Proposed Use: SFR ALTERATIONS <br />= s 3 Description: REPAIR EXTG FOUNDATION BY INSTALLING <br />IO I 1 3" PUSH PIERS nS1 <br />S l SCALE. 1 f4 = 1 -0 _ -� <br />99 T 9) <br />�Reviev�red 8y: � Date: � <br />*' FOUNDATION PLAN AND <br />Office Set Job Site Set Fire/Planning Set DETAILS <br />