My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2225 103RD ST SW 2022 Plans 2022-12-01
>
Address Records
>
103RD ST SW
>
2225
>
Plans
>
2225 103RD ST SW 2022 Plans 2022-12-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 9:16:49 AM
Creation date
5/11/2022 9:15:18 AM
Metadata
Fields
Template:
Address Document
Street Name
103RD ST SW
Street Number
2225
Permit
B2201-020
Year
2022
Notes
REPAIR EXTG FOUNDATION BY INSTALLING 3" PUSH PIERS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design Notes <br />Owner: <br />Sonja Wigdahl <br />Address: <br />2225103rd St. SW <br />City, State, ZIP: <br />Everett, WA 98204 <br />PN: <br />HE21120001 <br />These calculations provided in support of a contract between the contractor and the owner. <br />The calculations are to provide engineering design and review of the proposed scope of <br />work provided in the terms of the contract. This design represents a proposed solution <br />agreed upon in the contract used to address the areas of concern identified to the engineer. <br />The owner should be alert to possible changes to the condition of the structure and <br />continue to monitor the building's condition. <br />2 Hayman Engineering warrants that this design is based on sound engineering principles <br />but makes no warranty or guarantee regarding the work performed by the Contractor. <br />3 This design is based on information supplied by the Contractor. Field verify that <br />no system's placing violates the notes in this drawing set. <br />4 Install the system shown in accordance with the manufacturer's recommendations. <br />5 The building weight assumptions used to calculate pier load are estimates. <br />6 Drive each pier until a slight lifting of the building occurs to indicate that the structure's <br />load has transferred from the soil to the pier. Do not lift or drive past the load transfer <br />point as damage may occurto the foundation orto interior and exterior finishes. <br />(,. Page 2 of 6 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.