My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1023 100TH ST SW Geotech Report 2022-10-25
>
Address Records
>
100TH ST SW
>
1023
>
Geotech Report
>
1023 100TH ST SW Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 2:06:18 PM
Creation date
5/11/2022 9:42:57 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1023
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> COBALT <br /> GEOTECHNICAL INVESTIGATION s"�.-.► GE SCIENCES <br /> EVERETT, WASHINGTON <br /> December 3,2019 <br /> 1.0 Introduction <br /> In accordance with your authorization, Cobalt Geosciences, LLC (Cobalt) has completed a geotechnical <br /> investigation for the proposed residential development located at 1023 — booth Street SW in Everett, <br /> Washington(Figure b). <br /> The purpose of the geotechnical investigation was to identify subsurface conditions and to provide <br /> geotechnical recommendations for foundation design, stormwater management, earthwork, soil <br /> compaction,and suitability of the on-site soils for use as fill. <br /> The scope of work for the geotechnical evaluation consisted of a site investigation followed by engineering <br /> analyses to prepare this report. Recommendations presented herein pertain to various geotechnical <br /> aspects of the proposed development, including foundation support of the new buildings and new <br /> pavements. <br /> 2.o Project Description <br /> The project includes construction of five new single-family residences with an access driveway and <br /> hammerhead. <br /> Anticipated building loads are expected to be light to moderate and site grading will include cuts and fills <br /> on the order of 4 feet or less. Stormwater management will include infiltration devices, if feasible. We <br /> should be provided with the final plans when they become available. <br /> 3.0 Site Description <br /> The site is located at bo23 — booth Street SW in Everett,Washington(Figure 1). The property consists of <br /> one rectangular parcel with a total area of about o.57 acres. <br /> The southern portion of the property is developed with a residence and driveway. There is an accessory <br /> building in the northwest corner of the property. The remainder of the property is undeveloped and <br /> vegetated with grasses,bushes,and sparse trees. <br /> The site slopes downward from north to south at magnitudes of 5 to io percent and relief of about 7 feet. <br /> There is an approximate 2 feet tall rockery wall along the north property line. <br /> The site is bordered to the north,west, and east by residential properties and to the south by booth Street <br /> SW. <br /> 4.0 Field Investigation <br /> 4.1.1 Site Investigation Program <br /> The geotechnical field investigation program was completed on November 12, 2019 and included <br /> excavating and sampling two test pits within the property for subsurface analysis. <br /> PO Box 82243 <br /> Kenmore,WA 98028 <br /> cabaltgeola grnail.eom <br /> 2o6-331-io97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.