My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1430 112TH ST SE 2022-05-11
>
Address Records
>
112TH ST SE
>
1430
>
1430 112TH ST SE 2022-05-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2022 9:54:47 AM
Creation date
5/11/2022 9:54:05 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
1430
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/211/2021, Page 1 <br /> City of Everett <br /> 6:59:46AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2107-060 Site Address 1430 112TH ST SE <br /> Applied 7/11/2021 Applicant PWR CONSULTANTS&CONTRG INC Lot <br /> Approved 7/12/2021 Owner GEBREYES ELSABET N&YELEMWOSSEN DESTJ Block <br /> Issued 7/14/2021 Contractor PWR CONSULTANTS&CONTRG INC Tract <br /> Parent Permit No. B2010-011 Description Electrical installation for remodel <br /> Notes Power and lighting for remodel <br /> Scheduled Completed Type Inspector Result Remarks Insnector's Comments <br /> 7/15/2021 7/15/2021 ELEC 06-ROUGH MCB CORRECTION eTRAKiT Inspection 7/14/2021 9:22 PM PWR CONSULTANTS <br /> IN Request &CONTRG INC <br /> Contact Name:PWR CONSULTANTS& <br /> CONTRG INC <br /> Site Address:1430 112TH ST SE <br /> Phone:2068980585 <br /> e-Mail: <br /> P WRCONSULTANTS@GMAIL.COM <br /> (7/16/2021 8:24 AM MCB) <br /> Demo needs to be completed per plans <br /> 7/29/2021 7/29/2021 ELEC 06-ROUGH MCB CORRECTION eTRAKiT Inspection 7/28/2021 1:27 PM PWR CONSULTANTS <br /> IN Request &CONTRG INC <br /> Demo on breezeway complete <br /> Contact Name:PWR CONSULTANTS& <br /> CONTRG INC <br /> Site Address: 1430 112TH ST SE <br /> Phone:2068980585 <br /> • e-Mail: <br /> PWRCONSULTANTS@GMAIL.COM <br /> (7/29/2021 12:12 PM MCB) <br /> Framing work not complete per drawing <br /> 8/27/2021 8/27/2021 ELEC 06-ROUGH MCB APPROVAL eTRAKiT Inspection 8/26/2021 9:50 PM PWR CONSULTANTS <br /> IN Request &CONTRG INC <br /> Contact Name:PWR CONSULTANTS& <br /> CONTRG INC <br /> Site Address:1430 112TH ST SE <br /> Phone:2068980585 <br /> e-Mail: <br /> PWRCONSULTANTS@GMAIL.COM <br /> 10/27/2021 10/27/2021 ELEC 09-FINAL MCB CORRECTION eTRAKiT Inspection 10/26/2021 5:01 PM PWR <br /> Request CONSULTANTS&CONTRG INC <br /> Contact Name:PWR CONSULTANTS& <br /> CONTRG INC <br /> Site Address: 1430 112TH ST SE <br /> Phone:2068980585 <br /> e-Mail: <br /> P WRCONSULTANTS@GMAIL.COM <br /> (10/27/2021 2:52 PM MCB) <br /> Arc fault protection for bedroom lights <br /> INSP12 <br /> SYS7EMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.