Laserfiche WebLink
Stormwater Infiltration Letter NGA Project No. 1035918 <br /> Aikins Residence Development Stormwater Infiltration May 16,2018 <br /> Everett,Washington Page 5 <br /> We recommend that NGA be retained to review the design and provide monitoring and consultation services <br /> during construction to confirm that the conditions encountered are consistent with those indicated by the <br /> explorations,to provide recommendations for design changes should the conditions revealed during the work <br /> differ from those anticipated, and to evaluate whether or not earthwork activities comply with contract plans <br /> and specifications. We should be contacted a minimum of one week prior to construction activities and could <br /> attend pre-construction meetings if requested. <br /> Within the limitations of scope, schedule, and budget, our services have been performed in accordance with <br /> generally accepted geotechnical engineering practices in effect in this area at the time this letter was <br /> prepared. No other warranty, expressed or implied, is made. Our observations, findings, and opinions are a <br /> means to identify and reduce the inherent risks to the owner. <br /> o-o-o <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />