Laserfiche WebLink
NARRATIVE: (See attached sample narrative and site plan for guidance.) <br /> Project Description: <br /> Project will include construction of a single family home and a driveway. <br /> Please check "yes" or"no" for each criteria below. Answer "yes"if the statement <br /> accurately describes your project. (NOTE: If any answer below is "No"the project does <br /> not qualify as a "small"project and a full SWPPP will be required.) <br /> )30 Yes ❑ No This project disturbs less than 1 acre and is not part of a common <br /> plan of development. <br /> ❑ Yes ® No This project will create, add, or replace (in any combination) less <br /> than 2,000 sq. ft. of hard surface. <br /> ci Yes ❑ No This project will move less than 100 cu. yds. of material graded on <br /> site and less than 500 cu. yds. of material under the foundation of <br /> a building to be built pursuant to an approved building permit. <br /> �] Yes ❑ No This project will cause less than 7000 sq. ft. of land disturbing <br /> activity. <br /> ® Yes ❑ No This project site is located outside of a floodplain or shoreline <br /> designation. <br /> ® Yes ❑ No This project will not adversely impact a wetland, stream or water <br /> of the state, or change a natural drainage course. <br /> ❑ Yes ® No This project does not require engineering to comply. <br /> Small Project Stormwater Pollution Prevention Plan (SWPPP) Narrative and Plan Submittal Rev 3-18-16 2 <br />