Laserfiche WebLink
❑ Additional comments: <br /> If it does apply, describe the steps you will take and select the "best management practices"(BMPs)you <br /> will use to minimize sediment transport onto roads: <br /> IA A stabilized construction entrance will be installed prior to any vehicles entering the site, at the location <br /> shown on the SWPPP plan. <br /> Additional comments: <br /> Check the BMPs you will use: <br /> ® C105 Stabilized Construction Entrance <br /> ❑ C107 Construction Road/Parking Area Stabilization <br /> Element 3 — Control Flow Rates <br /> This element does no(apply to my project because: <br /> ❑ Additional comments: <br /> If it does apply, describe the steps you will take and "best management practices"(BMPs)you will use <br /> to control runoff flow rates from the site, referring to Element 4 BMPs below: <br /> IX] Flow rates will be controlled by using SWPPP Element 4 sediment controls and BMP T.5.13 Amended <br /> Soils if necessary. <br /> Small Project Stormwater Pollution Prevention Plan (SWPPP) Narrative and Plan Submittal Rev 3-18-16 4 <br />