My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 124TH ST SE 2022-05-11
>
Address Records
>
124TH ST SE
>
2201
>
2201 124TH ST SE 2022-05-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2022 10:20:31 AM
Creation date
5/11/2022 10:19:14 AM
Metadata
Fields
Template:
Address Document
Street Name
124TH ST SE
Street Number
2201
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Check the BMPs you will use: <br /> ❑ C120 Temporary and Permanent Seeding <br /> ❑ C208 Triangular Silt Dike (Geotextile-Encased Check Dam) <br /> Element 7 — Protect Permanent Drain Inlets <br /> This element does not apply to my project because: <br /> ❑ The site is in a rural area with an open ditch in the county right-of-way or private road right-of-way. <br /> ❑ There are no catch basins on or near the site. <br /> If it does apply, describe the steps you will take and "best management practices"(BMPs)you will use <br /> to keep runoff sediment out of storm drains: <br /> IX] Catch basins on the site or immediately off site in the right-of-way are shown on the Storm Water Pollution <br /> Prevention Site Plan. Storm drain inlet protection shall be installed. <br /> Additional comments: <br /> Check the BMPs you will use: <br /> C220 Storm Drain Inlet Protection <br /> Element 8 — Stabilize Channels and Outlets <br /> This element does not apply to my project because: <br /> ❑ Construction will occur during the dry weather. No storm drainage channels or ditches shall be <br /> constructed either temporary or permanent. A small swale shall be graded to convey yard drainage <br /> around the structure using a shallow slope; it shall be seeded after grading and stabilized. <br /> IX Additional comments: <br /> The use of channels and outlets is not anticipated. <br /> Small Project Stormwater Pollution Prevention Plan (SWPPP) Narrative and Plan Submittal Rev 3-18-16 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.