My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 124TH ST SE 2022-05-11
>
Address Records
>
124TH ST SE
>
2201
>
2201 124TH ST SE 2022-05-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2022 10:20:31 AM
Creation date
5/11/2022 10:19:14 AM
Metadata
Fields
Template:
Address Document
Street Name
124TH ST SE
Street Number
2201
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 10 - Control De-watering <br /> This element does no(apply to my project because: <br /> ® No dewatering of the site is anticipated. <br /> If it does apply, describe the steps you will take and "best management practices"(BMPs)you will use <br /> to separate contaminated de-watering water from stormwater: <br /> ❑ Additional comments: <br /> Check the BMPs you will use: <br /> ❑ C220 Storm Drain Inlet Protection <br /> Element 11 — Maintain Best Management Practices <br /> Describe the steps you will take to ensure that BMPs are in place and properly functioning as needed <br /> throughout construction: <br /> II Best Management Practices or BMP's shall be inspected and maintained during construction and removed <br /> within 30 days after the County Inspector or Engineer determines that the site is stabilized, provided that <br /> they may be removed when they are no longer needed. <br /> Element 12 — Manage the Project <br /> Describe the BMP sequencing you will use to ensure that the full SWPPP is properly coordinated and that <br /> all BMPs are deployed at the proper time to achieve full compliance with county regulations throughout <br /> the project: <br /> Ll The SWPPP will be implemented at all times. The applicable erosion control BMP's will be implemented in <br /> the following sequence: <br /> In Mark clearing limits <br /> ❑ Install stabilized construction entrance <br /> ❑ Install protection for existing drainage systems and permanent drain inlets <br /> ® Establish staging areas for storage and handling polluted material and BMP's <br /> LI Install sediment control BMP's <br /> In Grade and install stabilization measures for disturbed areas <br /> IX] Maintain BMP's until site stabilization, at which time they may be removed. <br /> Small Project Stormwater Pollution Prevention Plan (SWPPP) Narrative and Plan Submittal Rev 3-18-16 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.