Laserfiche WebLink
Element 10 - Control De-watering <br /> This element does no(apply to my project because: <br /> ® No dewatering of the site is anticipated. <br /> If it does apply, describe the steps you will take and "best management practices"(BMPs)you will use <br /> to separate contaminated de-watering water from stormwater: <br /> ❑ Additional comments: <br /> Check the BMPs you will use: <br /> ❑ C220 Storm Drain Inlet Protection <br /> Element 11 — Maintain Best Management Practices <br /> Describe the steps you will take to ensure that BMPs are in place and properly functioning as needed <br /> throughout construction: <br /> II Best Management Practices or BMP's shall be inspected and maintained during construction and removed <br /> within 30 days after the County Inspector or Engineer determines that the site is stabilized, provided that <br /> they may be removed when they are no longer needed. <br /> Element 12 — Manage the Project <br /> Describe the BMP sequencing you will use to ensure that the full SWPPP is properly coordinated and that <br /> all BMPs are deployed at the proper time to achieve full compliance with county regulations throughout <br /> the project: <br /> Ll The SWPPP will be implemented at all times. The applicable erosion control BMP's will be implemented in <br /> the following sequence: <br /> In Mark clearing limits <br /> ❑ Install stabilized construction entrance <br /> ❑ Install protection for existing drainage systems and permanent drain inlets <br /> ® Establish staging areas for storage and handling polluted material and BMP's <br /> LI Install sediment control BMP's <br /> In Grade and install stabilization measures for disturbed areas <br /> IX] Maintain BMP's until site stabilization, at which time they may be removed. <br /> Small Project Stormwater Pollution Prevention Plan (SWPPP) Narrative and Plan Submittal Rev 3-18-16 9 <br />