Laserfiche WebLink
7.6.3 Savings. <br /> 7.6.3.1 If the sum of the actual Design-Build Fee (as defined in 7.4 hereof), the <br /> Construction General Conditions Fee (Section 7.3), Pass-Through Costs (Section 7.5.3) plus the Cost of <br /> the Phase 2 Work (Section 7.5.1) as provided in Article 7 hereof is less than the GMP, as such GMP may <br /> have been adjusted over the course of the Project,the difference("Savings")shall accrue 60%to the Owner <br /> and 40% to the Design-Builder. <br /> 7.7 Allowance Items and Allowance Values. <br /> 7.7.1 Any and all Allowance Items, as well as their corresponding Allowance Values, shall be set <br /> forth in the GMP Amendment. <br /> 7.7.2 Design-Builder and Owner will work together to review the Allowance Items and Allowance <br /> Values based on design information then-available to determine that the Allowance Values constitute <br /> reasonable estimates for the Allowance Items. Design-Builder and Owner will continue working closely <br /> together during the preparation of the design to develop Construction Documents consistent with the <br /> Allowance Values. Nothing herein is intended in any way to constitute a guarantee by Design-Builder that <br /> the Allowance Item in question can be performed for the Allowance Value. <br /> 7.7.3 No Work shall be performed on any Allowance Item without Design-Builder first obtaining <br /> in writing advanced authorization to proceed from Owner. Owner agrees that if Design-Builder is not <br /> provided written authorization to proceed by the date set forth in the Project Schedule approved with the <br /> GMP Amendment, due to no fault of Design-Builder, Design-Builder may be entitled to an adjustment of <br /> the Contract Time(s)and Contract Price. <br /> 7.7.4 The Allowance Value includes the direct cost of labor, materials,equipment,transportation, <br /> taxes, and insurance associated with the applicable Allowance Item. <br /> 7.7.5 Whenever the actual cost for an Allowance Item is more than or less than the stated <br /> Allowance Value, the Design-Builder shall report such difference to Owner and shall maintain a running <br /> tally of Allowance Item costs against Allowance Values. Prior to final payment, the Contract Price shall be <br /> adjusted accordingly by Change Order, subject to Section 7.7.4. The amount of the Change Order shall <br /> reflect the difference between actual costs incurred by Design-Builder for all Allowance Items and the total <br /> Allowance Value. <br /> Article 8 <br /> Procedure for Payment <br /> 8.1 Phase 1 Payments. Phase 1 Services shall be paid by Owner based on the not-to-exceed Phase <br /> 1 price and the all-inclusive billing rates and labor categories both set forth in Exhibit E(Supporting Pricing <br /> Information). No markups beyond those included in Exhibit E shall be added to billings from any <br /> subconsultants or subcontractors for Phase 1 services. All-inclusive billing rates and labor categories shall <br /> not be subject to any overtime pay obligations incurred by Design-Builder nor any rate increases during <br /> Phase 1. <br /> 8.2 Phase 2 Payments. <br /> 8.2.1 Progress payments will be made monthly for work duly certified, approved, and performed <br /> during the calendar month preceding the Application in accordance with the following procedure: <br /> 8.2.1.1 Draft Application. In accordance with the current City of Everett Construction <br /> Management Payment Schedule, Design-Builder shall submit to Owner a report on the <br /> PROGRESSIVE DESIGN-BUILD CONTRACT,Page 14 <br />