My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF <br /> EVERETT <br /> Water Filter Plant — Phase 2 Capital Upgrades <br /> Progressive Design-Build Contract Between <br /> Owner and Design-Builder <br /> This CONTRACT is made and entered into as of N't i,- 9d 2022,by and between the following parties, for services <br /> in connection with the Project identified below. <br /> OWNER: <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett, Washington 98201 <br /> DESIGN-BUILDER: <br /> IMCO General Construction <br /> 2116 Buchanan Loop <br /> Ferndale, WA 98248 <br /> PROJECT: <br /> City of Everett Water Filter Plant—Phase 2 Capital Upgrades <br /> In consideration of the mutual covenants and obligations contained herein, Owner and Design-Builder agree as set <br /> forth herein. <br /> PROGRESSIVE DESIGN-BUILD CONTRACT,Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.