My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Water Filter Plant-Phase 2 Capital Upgrades PDB Project <br /> Request for Proposals (Attachment 1. Required Forms <br /> FORM 6A. PROGRESSIVE DESIGN-BUILDER PRICE PROPOSAL <br /> SUMMARY <br /> This Form 6a (Progressive Design-Builder Price Proposal Summary) will be <br /> incorporated into Exhibit E (Supporting Pricing Information) of the Design-Build <br /> Contract. <br /> Phase 1 Price <br /> Price for completing the Draft Phase 1 Scope of Work $ 2,723,318.68 <br /> The Proposer's not-to-exceed price for all services outlined in the as- <br /> written Draft Phase 1 Scope of Services, which is provided as Exhibit C <br /> (Phase 1 Scope of Services) to the PDB Contract(Attachment 2). The total <br /> not-to-exceed price is sum of items below: <br /> Task 1. Phase 1 Project Management $ 239,297.26 <br /> Task 2. Reference Document Review $ 29,690.00 <br /> Task 3. Field Investigations $ 260,537.92 <br /> Task 4. Design Development and Documents $ 194,669.00 <br /> Task 5. Design $ 1,761,514.50 <br /> Task 6. Cost Modeling and Scheduling $ 184,680.00 <br /> Task 7. Phase 2 Proposal $ 52,930 <br /> Task 8. Additional Phase 1 Services (to be subsequently determined) $ N/A <br /> Phase 2 Pricing Elements <br /> Phase 2 Pricing elements <br /> Provide the following Phase 2 pricing elements: <br /> 1. Design-Build Fee. A total Percent (%) markup for combined overhead 8% <br /> and profit on work to be applied to approved Phase 2 Construction Work <br /> which will be identified in the Guaranteed Price Amendment. This Fee <br /> will be incorporated into Section 7.4.1 of the Design-Build Contract. <br /> 2. Design-Build Fee to be applied to Approved Change Orders. A total 8% <br /> Percent (%) markup for combined overhead and profit to be applied to <br /> approved changes in the Work as set forth in a Change Order. This Fee <br /> will be incorporated into Section 7.4.2 of the Design-Build Contract. <br /> 3. Construction General Conditions Fee. A lump sum construction $1,750,000.00 <br /> general conditions fee for all construction general Conditions identified <br /> in Exhibit D to the Progressive Design-Build Contract. This Fee will be <br /> incorporated into Section 7.3 of the Design-Build Contract. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.