IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2.48 Safety Representative is defined and described in Section 2.8.1 of these General <br /> Conditions of Contract. <br /> 1.2.49 Contract Final Completion Date is the date set forth in the Contract at Section 6.2.4 and is <br /> subject to adjustment in accordance with these General Conditions of Contract. <br /> 1.2.50 Contract Substantial Completion Date is the date set forth in the Contract at Section 6.2.3 <br /> and is subject to adjustment in accordance with these General Conditions of Contract. <br /> 1.2.51 Site is the land or premises on which the Project is located. <br /> 1.2.52 Subcontractor is any person or entity retained by Design-Builder as an independent <br /> contractor to perform a portion of the Work and shall include materialmen and suppliers. <br /> 1.2.53 Sub-Subcontractor is any person or entity retained by a Subcontractor as an independent <br /> contractor to perform any portion of a Subcontractor's Work and shall include materialmen and <br /> suppliers. <br /> 1.2.54 Substantial Completion or Substantially Complete means the Work, except for agreed-to- <br /> punch list items, is sufficiently complete in accordance with the Contract Documents such that <br /> Owner can occupy and use the Project or a portion thereof for its intended purposes, and Design- <br /> Builder has provided all documentation and other information as is required by Section 6.6 of these <br /> General Conditions. <br /> 1.2.55 Work is comprised of all Design-Builder's design, construction and other services required <br /> by the Contract Documents, including procuring and furnishing all materials, equipment, services <br /> and labor reasonably inferable from the Contract Documents. <br /> 1.2.56 Work Change Directive is defined and described in Section 9.2 of these General Conditions <br /> of Contract. <br /> 1.2.57 Work Product is defined and described in Section 5.1 of the Contract. <br /> Article 2 <br /> Design-Builder's Services and Responsibilities <br /> 2.1 General Services. <br /> 2.1.1 Design-Builder's Representative shall be reasonably available to Owner and Owner's <br /> Representative and shall have the necessary expertise and experience required to supervise the <br /> Work. Design-Builder's Representative shall communicate regularly with Owner and shall be <br /> vested with the authority to act on behalf of Design-Builder. Design-Builder's Representative may <br /> be replaced only with the mutual agreement of Owner and Design-Builder. <br /> 2.1.2 Design-Builder shall provide Owner and Owner's Representative with a monthly status <br /> report detailing the progress of the Work, including (i)whether the Work is proceeding according to <br /> schedule, (ii)whether discrepancies, conflicts, or ambiguities exist in the Contract Documents that <br /> require resolution, (iii)whether health and safety issues exist in connection with the Work; (iv)status <br /> of the contingency account to the extent provided for in the Contract;and(v)other items that require <br /> resolution so as not to jeopardize Design-Builder's ability to complete the Work for the Contract <br /> Price, within the GMP, and within the Contract Time(s). <br /> GENERAL CONDITIONS OF PROGRESSIVE DESIGN-BUILD CONTRACT,Page 5 <br />