My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
such submissions may have been modified in a design review meeting and recorded in the <br /> meetings minutes. The parties shall have a design review meeting to discuss, and Owner shall <br /> review and approve, the Construction Documents in accordance with the procedures set forth in <br /> Section 2.4.1 above. Design-Builder shall proceed with construction in accordance with the <br /> approved Construction Documents and shall submit one set of approved Construction Documents <br /> to Owner prior to commencement of construction. <br /> 2.4.3 Owner's review and approval of interim design submissions, meeting minutes, and the <br /> Construction Documents is for the purpose of mutually establishing a conformed set of Construction <br /> Documents compatible with the requirements of the Work. Neither Owner's review nor approval of <br /> any interim design submissions, meeting minutes, and Construction Documents shall be deemed <br /> to transfer any design liability from Design-Builder to Owner. <br /> 2.4.4 To the extent not prohibited by the Contract Documents or Legal Requirements, Design- <br /> Builder may prepare interim design submissions and Construction Documents for a portion of the <br /> Work to permit construction to proceed on that portion of the Work prior to completion of the <br /> Construction Documents for the entire Work. <br /> 2.5 Legal Requirements. <br /> 2.5.1 Design-Builder shall perform the Work in accordance with all Legal Requirements and shall <br /> provide all notices applicable to the Work as required by the Legal Requirements. <br /> 2.6 Government Approvals and Permits. <br /> 2.6.1 Except as may be modified during Phase 1, Design-Builder shall obtain and pay for all <br /> necessary permits, approvals, licenses, government charges and inspection fees required for the <br /> execution of the Work by any government or quasi-government entity having jurisdiction over the <br /> Project. <br /> 2.6.2 Design-Builder shall provide reasonable assistance to Owner in obtaining those permits, <br /> approvals and licenses that are Owner's responsibility. <br /> 2.7 Design-Builder's Construction Phase Services. <br /> 2.7.1 Unless otherwise provided in the Contract Documents to be the responsibility of Owner or <br /> a separate contractor, Design-Builder shall provide through itself or Subcontractors the necessary <br /> supervision, labor, inspection, testing, startup, material, equipment, machinery, temporary utilities <br /> and other temporary facilities to permit Design-Builder to complete construction of the Project <br /> consistent with the Contract Documents. <br /> 2.7.2 Design-Builder shall perform all construction activities efficiently and with the requisite <br /> expertise, skill and competence to satisfy the requirements of the Contract Documents. Design- <br /> Builder shall at all times exercise complete and exclusive control over the means, methods, <br /> sequences and techniques of construction. <br /> 2.7.3 Design-Builder shall employ only Subcontractors who are duly licensed and qualified to <br /> perform the Work consistent with the Contract Documents. Owner approves Subcontractors <br /> identified in Section 10.3 of the Contract as Key Firms and Key Personnel. Owner may reasonably <br /> object to Design-Builder's selection of any Subcontractor, provided that the Contract Price and/or <br /> Contract Time(s) shall be adjusted to the extent that Owner's decision impacts Design-Builder's <br /> cost and/or time of performance. <br /> 2.7.3.1 The Design-Builder shall include the language of this sub-paragraph in each of its <br /> first tier subcontracts, and shall require each of its Subcontractors to include the <br /> GENERAL CONDITIONS OF PROGRESSIVE DESIGN-BUILD CONTRACT,Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.