IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
this Article 4. If Design-Builder has complied with this Article 4 and Section 9.1.3 of these General <br /> Conditions and Owner and Design-Builder cannot agree as to entitlement to or on the amount or <br /> extent, if any, of any adjustment in GMP or Contract Time, or both, as a result of such Work <br /> stoppage or such special conditions under which Work is agreed to be resumed by Design-Builder, <br /> the Design-Builder may make a Claim therefor as provided in Article 10. <br /> 4.1.5 Owner is not responsible for Hazardous Conditions introduced to the Site by Design- <br /> Builder, Subcontractors or anyone for whose acts they may be liable or responsible. To the fullest <br /> extent permitted by law, Design-Builder shall indemnify, defend and hold harmless Owner and <br /> Owner's officers, directors, employees and agents from and against all claims, losses, damages, <br /> liabilities and expenses, including attorneys' fees and expenses, arising out of or resulting from <br /> those Hazardous Conditions introduced to the Site by Design-Builder, Subcontractors or anyone <br /> for whose acts they may be liable. <br /> 4.1.6 Training and Reporting <br /> 4.1.6.1 All workers onsite who are involved in demolition, construction, installation or <br /> excavation activities must have current Asbestos Awareness Training, as required by WAC <br /> 296-62-07722(6). <br /> 4.1.6.2 Prior to bringing onsite any chemicals listed in 6 CFR part 27, Appendix A, the <br /> Design-Builder shall submit for itself and for all Subcontractors a completed "Contractor <br /> Declaration and Reporting Form for Department of Homeland Security — Chemicals of <br /> Interest." <br /> 4.1.7 General Requirements When Design-Builder Performs Hazardous Conditions <br /> Abatement <br /> 4.1.7.1 SUPERVISORY AUTHORITY: Design-Builder assumes all responsibilities <br /> and shall perform all required work under applicable regulations related to their supervisory <br /> authority over Subcontractors and personnel performing work related to hazardous <br /> materials. <br /> 4.1.7.2 ACCESS RESTRICTIONS: Work described in the Contract Documents <br /> includes restriction of access to work areas during hazardous materials activities. Access <br /> to various work areas by the general public, Subcontractors, and other individuals will not <br /> be possible during certain hazardous materials work sequences, as specified in the <br /> Contract Documents. Design-Builder shall coordinate the Work to facilitate access by <br /> Subcontractors while enforcing work area restrictions, and shall minimize disruption to <br /> building occupants and services. <br /> 4.1.7.3 WORKING HOURS: No hazardous materials work shall occur when building <br /> users have access to work areas. Schedule all hazardous materials work to occur in <br /> accordance with schedule requirements outlined elsewhere in the Contract Documents, <br /> and when work areas have been vacated by building users. <br /> 4.1.7.4 EMERGENCY CONTACTS: Designated qualified representatives of the <br /> Design-Builder and specific hazardous materials Subcontractors are to be available on a <br /> 24-hour emergency basis for the duration of the Work. Provide contact information to the <br /> Owner's Representative for inclusion in the Project emergency contact list. <br /> 4.1.7.5 GENERAL HAZARDOUS MATERIALS SUBMITTALS: Design-Builder shall <br /> review the scope of work and submittal requirements outlined in the Contract Documents. <br /> Design-Builder shall submit, and require all subcontractors performing the work of handling <br /> or disposing of any hazardous materials to submit, pertinent information required by the <br /> Contract Documents. Examples of work and impact may include abatement, demolition, <br /> GENERAL CONDITIONS OF PROGRESSIVE DESIGN-BUILD CONTRACT,Page 13 <br />