Proposal is accepted and the GMP Amendment is executed, unless the parties mutually agree otherwise <br /> in writing. <br /> 6.2.3 Agreed Plant Shutdown Period. Design-Builder shall endeavor to design and perform <br /> all Work on the project without requiring shut down of the plant(in whole or in part). To the extent Design- <br /> Builder's performance of Work causes or necessitates shut down of the plant (in whole or in part), Owner <br /> and Design-Builder shall agree in advance on the period of time required for each such plant shut down <br /> (the "Agreed Plant Shutdown Period"). In no event shall any Agreed Plant Shutdown Period exceed 8 <br /> hours. <br /> 6.2.4 Substantial Completion. Substantial Completion of the entire Work shall be achieved no <br /> later than September 30, 2024 ("Contract Substantial Completion Date"), or as amended by addendum or <br /> change order. <br /> 6.2.5 Final Completion. Final Completion of the Work, including all punch list items, shall be <br /> achieved no later than sixty(60)days following Substantial Completion ("Contract Final Completion Date"). <br /> Final Completion is the date when all Work is complete pursuant to the definition of Final Completion set <br /> forth in the General Conditions. <br /> 6.2.6 All of the dates set forth in this Article 6 shall be subject to adjustment in accordance with <br /> the General Conditions. <br /> 6.3 Time is of the Essence. Owner and Design-Builder mutually agree that time is of the essence <br /> with respect to the dates and times set forth in the Contract Documents. <br /> 6.4 Liquidated Damages. <br /> 6.4.1 Design-Builder understands that if Substantial Completion is not attained by the Contract <br /> Substantial Completion Date, Owner will suffer damages which are difficult to determine and accurately <br /> specify. Design-Builder agrees that if Substantial Completion is not attained by the Contract Substantial <br /> Completion Date, Design-Builder shall pay Owner five thousand three-hundred Dollars ($5,300) as <br /> liquidated damages for each calendar day that Substantial Completion extends beyond the Contract <br /> Substantial Completion Date. <br /> 6.4.2 Design-Builder understands that if Final Completion is not achieved by the Contract Final <br /> Completion Date, Owner will suffer damages which are difficult to determine and accurately <br /> specify. Design-Builder agrees that if Final Completion is not achieved by the Contract Final Completion <br /> Date, Design-Builder shall pay to Owner five hundred Dollars ($500), as liquidated damages for each <br /> calendar day that Final Completion extends beyond the Contract Final Completion Date. <br /> 6.4.3 Design-Builder understands that if the plant is shut down(in whole or in part)for any amount <br /> of time in excess of any individual Agreed Plant Shutdown Period, Owner will suffer damages which are <br /> difficult to determine and accurately specify. Design-Builder agrees that if the plant is shut down (in whole <br /> or in part)for any amount of time in excess of any individual Agreed Plant Shutdown Period, Design-Builder <br /> shall pay to Owner Five thousand Dollars ($5,000), as liquidated damages for each hour that the plant <br /> is shut down in excess of any individual Agreed Plant Shutdown Period. <br /> 6.4.4 The categories of liquidated damages set forth above are cumulative and may accrue <br /> simultaneously. <br /> 6.4.5 Any liquidated damages assessed pursuant to this Contract shall be in lieu of all monetary <br /> liability for any and all extra costs, losses, expenses, claims, penalties and any other damages, whether <br /> special or consequential, and of whatsoever nature incurred by Owner which are caused by any delay in <br /> achieving Substantial Completion or Final Completion, provided this limitation shall not apply to Design- <br /> Builder's duty to indemnify the Owner or to warrant Design-Builder's Work as provided in this Contract and <br /> PROGRESSIVE DESIGN-BUILD CONTRACT,Page 9 <br />