My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 7 <br /> Indemnification <br /> 7.1 Patent and Copyright Infringement. <br /> 7.1.1 Design-Builder shall defend, with counsel reasonably acceptable to Owner, any action or <br /> proceeding brought against Owner based on any claim that the Work, or any part thereof, or the <br /> operation or use of the Work or any part thereof, constitutes infringement of any United States <br /> patent or copyright, now or hereafter issued. Owner shall give prompt written notice to Design- <br /> Builder of any such action or proceeding and will reasonably provide authority, information and <br /> assistance in the defense of same. Design-Builder shall indemnify and hold harmless Owner from <br /> and against all damages and costs, including but not limited to attorneys' fees and expenses <br /> incurred by or awarded against Owner or Design-Builder in any such action or proceeding. Design- <br /> Builder agrees to keep Owner informed of all developments in the defense of such actions. <br /> 7.1.2 If Owner is enjoined from the operation or use of the Work,or any part thereof, as the result <br /> of any patent or copyright suit, claim, or proceeding, Design-Builder shall at its sole expense take <br /> reasonable steps to procure the right to operate or use the Work. If Design-Builder cannot so <br /> procure such right within a reasonable time, Design-Builder shall promptly, at Design-Builder's <br /> option and at Design-Builder's expense, (i)modify the Work so as to avoid infringement of any such <br /> patent or copyright or (ii) replace said Work with Work that does not infringe or violate any such <br /> patent or copyright. <br /> 7.1.3 Sections 7.1.1 and 7.1.2 above shall not be applicable to any suit, claim or proceeding <br /> based on infringement or violation of a patent or copyright(i) relating solely to a particular process <br /> or product of a particular manufacturer specified by Owner and not offered or recommended by <br /> Design-Builder to Owner or (ii) arising from modifications to the Work by Owner or its agents after <br /> Acceptance. If the suit, claim or proceeding is based upon events set forth in the preceding <br /> sentence, Owner shall defend, indemnify and hold harmless Design-Builder to the same extent <br /> Design-Builder is obligated to defend, indemnify and hold harmless Owner in Section 7.1.1 above. <br /> 7.1.4 The obligations set forth in this Section 7.1 shall constitute the sole agreement between <br /> the parties relating to liability for infringement of violation of any patent or copyright. <br /> 7.2 Tax Claim Indemnification. <br /> 7.2.1 If, in accordance with Owner's direction, an exemption for all or part of the Work is claimed <br /> for taxes, Owner shall indemnify, defend and hold harmless Design-Builder from and against any <br /> liability, penalty, interest,fine, tax assessment, attorneys'fees or other expenses or costs incurred <br /> by Design-Builder as a result of any action taken by Design-Builder in accordance with Owner's <br /> directive. Owner shall furnish Design-Builder with any applicable tax exemption certificates <br /> necessary to obtain such exemption, upon which Design-Builder may rely. <br /> 7.3 Payment Claim Indemnification. <br /> 7.3.1 Provided that Owner is not in breach of its contractual obligation to make payments to <br /> Design-Builder for the Work, Design-Builder shall indemnify,defend and hold harmless Owner from <br /> any claims or mechanic's liens brought against Owner or against the Project as a result of the <br /> failure of Design-Builder,or those for whose acts it is responsible,to pay for any services, materials, <br /> labor, equipment, taxes or other items or obligations furnished or incurred for or in connection with <br /> the Work. Within three (3) days of receiving written notice from Owner that such a claim or <br /> mechanic's lien has been filed, Design-Builder shall commence to take the steps necessary to <br /> GENERAL CONDITIONS OF PROGRESSIVE DESIGN-BUILD CONTRACT,Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.