My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.4 GMP Adjustments. <br /> 9.4.1 The increase or decrease in GMP resulting from a change in the Work shall be determined <br /> by one or more of the following methods: <br /> 9.4.1.1 Unit prices set forth in the Contract or as subsequently agreed to between the <br /> parties; <br /> 9.4.1.2 A mutually accepted lump sum, properly itemized and supported by sufficient <br /> substantiating data to permit evaluation by Owner; <br /> 9.4.1.3 Costs, fees and any other markups set forth in the Contract; or <br /> 9.4.1.4 If an increase or decrease cannot be agreed to as set forth in items 9.4.1.1 through <br /> 9.4.1.3 above and Owner issues a Work Change Directive, the cost of the change of the <br /> Work shall be determined by the reasonable expense and savings in the performance of <br /> the Work resulting from the change, including a reasonable overhead and profit, as may <br /> be set forth in the Contract. <br /> 9.4.2 If unit prices are set forth in the Contract Documents or are subsequently agreed to by the <br /> parties, but application of such unit prices will cause substantial inequity to Owner or Design-Builder <br /> because of differences in the character or quantity of such unit items as originally contemplated, <br /> such unit prices shall be equitably adjusted. <br /> 9.5 Emergencies. <br /> 9.5.1 In any emergency affecting the safety of persons and/or property, Design-Builder shall act, <br /> at its discretion, to prevent threatened damage, injury or loss. Any change in the GMP and/or <br /> Contract Time(s)on account of emergency work shall be determined as provided in this Article 9. <br /> Article 10 <br /> Claims and Disputes <br /> 10.1 Condition Precedent to Filing a Claim. The following actions are a mandatory condition <br /> precedent to filing a Claim: (a) a Request for Change Order is denied or deemed denied by the <br /> Owner or(b)a Unilateral Change Order is issued by the Owner. <br /> 10.2 Claim Deadline. Unless otherwise agreed to in writing by the Owner, a fully documented Claim <br /> shall be received by the Owner within 30 days after the denial or deemed denial of a Request for <br /> Change Order, or, in the case of a Unilateral Change Order, Design-Builder's receipt of Owner's <br /> decision regarding Contract Time or GMP adjustments pursuant to the Unilateral Change Order. <br /> Failure to comply with the time requirements set for filing a Claim shall constitute acceptance by <br /> the Design-Builder,on behalf of itself and its Subcontractors and suppliers, of the Unilateral Change <br /> Order or the Owner's denial or deemed denial of a Request for Change Order. Such acceptance <br /> shall be considered complete, full, and final settlement of all costs, damages, and Claims related <br /> to or arising from the Request for Change Order or Unilateral Change Order. <br /> 10.3 Design-Builder's Obligation to Continue Work. Pending final decision of a Claim hereunder, <br /> the Design-Builder shall proceed diligently with the performance of the Work, including that work <br /> associated with the Claim, and maintain its progress with the Work. Failure to proceed as required <br /> herein shall constitute grounds for termination for cause under Article 11. <br /> GENERAL CONDITIONS OF PROGRESSIVE DESIGN-BUILD CONTRACT,Page 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.