Laserfiche WebLink
, <br />� ,�''J•'����� �f'l ��Pf'.Y4ya{,wf �i e ��C' ra <br />� ,� \ "�tlhy Gam61t? Call Campbell!" <br />r� � P.0 Box 5541, Everett, WA 98206 <br />� o � Phone:4i5-2s9-38�8-360-653-98�4 <br />� Pa�r.4Z5335•4370 <br />�v Email� service@campbells-plumbi�ig.com <br />Web: �vww.campbells-plumbing.com <br />P1ae�bL�g • HYAC •�etie: c• Ec5R7^IC • 41c4e�• Qarc�ge S3ecEoeatloc <br />TO lolene Holmes <br />1528 Walnut St. <br />Evcrett, WA 98201 <br />QTY <br />1 <br />t <br />t <br />10 <br />10 <br />1 <br />1 <br />2 <br />0.25 <br />� <br />� <br />Q <br />e <br />MATERIALS <br />�chrseal4' PVC dea�� check valve <br />PVC DWV FIP adap;er <br />PVC DWV tdPT p!ug <br />�e16' PVC 40 pipe <br />�et 4' PVC 40 pipe <br />)510' Round valve boz <br />)S 10' Round valve hox cover <br />Fcrnco caupling <br />3rd 5/8 minus crushed rock <br />JC cemenl <br />!C prim'• <br />loees - aa and sanilarv <br />ilneeded <br />PRICE AMOUNT <br />5139.31 <br />$16.8 <br />TOTAL MATER <br />JOB DETAILS AND REMARKS <br />g41. <br />511. <br />S9. <br />S7 <br />INVOICE: 1160y� <br />Generel Contractor License N: CAMPBP1917MS <br />3105 <br />DESGRIPTION OF WORK <br />InspectpropeAylorbackwalervalvequalifiwlion. Videoscope <br />sewer Iine. PeAorm eleclronic locale lo determine possib!e locations <br />to install backwater vaive. Mark loca6on, mark out fer uliliry locale <br />and c211 to hace uhlities Ixaled. Ez�avale as necessary to aaess <br />sewer line. Have sewer line grade inspecled by ciry of Everelt <br />Reinove andlar reroute lines tying inlo sewer as reauired by dty <br />andlor requested by customer, Cul into sewer line and bed with <br />318" minus crushed rock, inslall backwater v.Jve iuGuding a few <br />leel ol sewer pipe as needeJ. Have inspecl�:d by aty of EveretL <br />Backfill, install BWD cover, reslore sudar; o11he ground as needed. <br />Show ovmer how to operate BWD have papenvork fiiled oul. <br />OTMER CMARGES AMOUN' <br />Yideo sewer line 5350.( <br />Ezcavalor if needed Inctuded <br />Diamond saw if needed Included <br />�acowrt fo bunu fo nifowed em;e �5237. <br />,� TOTALOTHER <br />LABOR HRS. RATE <br />5377.35 Excavalion, installalion 8 filling 1G 595.D0 <br />7.5°6 INTEREST PER MONTN ON ANY 6ALANCE OVER 30 UAYS <br />:r irts rurnn o vucw n tw�. n�caui u� nilnwar mq <ou.qp� wnrnur iu�.um iu wia:neH wn n <br />rninvun. nAnuax �awrr nc�ts m vnr n wn•nna��. emwnir r¢ iox na-. u��r; m murniw nv <br />n¢ ncrrnmT. w uvi n�r, wn� vur to �smun: muic�nv cucn ine eucru ucntn �¢mtn'vvu,+s ro <br />OAY�M�Y.HCf ��00 �5lIV6TARUDnWFlS{➢PN.60fNILQW� <br />DATE COMPLCTED: Ja'.uary 20, 2015 <br />Work ordered by: ;olene Holmes <br />1 h±reEy a[knawledge tAe satlshcmry mmpietlon a1 Ne work desMAed above. <br />l <br />v <br />TOTAL LABOR 31,520 <br />TOTAL MATERIALS 5377 <br />TOTALOTHER 5392 <br />.%t74lii• �GiL;/ 9.2Yo TAX 5210 <br />s� �nn <br />