Laserfiche WebLink
3) Side Sewer Improvements: Both side sewer lines are 70' in length, depth of sewer on south side is <br /> 5'6", line is concrete. North side sewer is existing clay and has an obstruction at 25'. Root intrusion was <br /> also noted in the north side sewer. <br /> Suggested Solution: Recommend jetting North side sewer line to remove obstruction. Relining South side <br /> sewer to extend the useful life of the pipe. <br /> As-built Plumbing and Sewer Sketch <br /> .,....... 11 <br /> ' <br /> CNI 14 <br /> 1 t- <br /> (.9 , , <br /> fir t, <br /> C\IPR f <br /> CO ` > <br /> "" �'" PROPOSED OPOSE <br /> S BACKWATER BACKWATER. <br /> VALVE 2' DEEP VALVE 5.5' DEEP <br /> al <br /> 9 <br /> I t'V 1 <br /> r4 I <br /> a _ <br /> ih. ..., <br /> 1 ' - �`;. <br />