My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
405 WETMORE AVE 2022-05-18
>
Address Records
>
WETMORE AVE
>
405
>
405 WETMORE AVE 2022-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 7:58:19 AM
Creation date
5/17/2022 10:39:50 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
405
Notes
BACKWATER VALVE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tkt <br /> At <br /> 7611 <br /> �.. PUBLIC WD R/KS <br /> iipor <br /> March 9, 2011 <br /> Dominic Soriano <br /> 405 Wetmore Avenue <br /> Everett, Washington 98201 <br /> Re: Plumbing Investigation at 405 Wetmore Avenue for Backwater Valve Program <br /> Dear Mr. Soriano: <br /> The City of Everett's contractor, Seattle Drain Services, inspected the plumbing and <br /> drainage at your property on December 15, 2010, to determine if a backwater valve is <br /> appropriate for your residence. Enclosed is a summary of their findings. <br /> The report recommends the installation of a backwater valve on the side sewer that <br /> connects your home to the City's sewer main to reduce the risk of basement flooding <br /> from sewer backups. Please review the report and contact us with any questions. <br /> The next step is for you to confirm that you want to proceed with the program. To do <br /> that, please call Grant Moen at (425) 257-8947 and confirm your desire to have the City <br /> coordinate and fund the installation of a backwater valve on your side sewer. After <br /> receiving your authorization, we will hire a contractor to install the backwater valve in <br /> accordance with the installation and maintenance agreement documents you previously <br /> signed. <br /> If you choose to proceed, the contractor will contact you to schedule the installation. <br /> However, this is still a few weeks away. At the conclusion of the work, the excavation will <br /> be refilled and hardened surfaces (driveways and/or sidewalks) will be restored. You will <br /> also be provided on-site training on the operation and maintenance of the valve. <br /> Restoration of grass, plants and landscaping are your responsibility. <br /> The report also identifies deficiencies in your plumbing, sewer and drainage system. This <br /> includes: <br /> • There is a floor drain at the back door that is connected to the below ground drain <br /> line that your downspouts are also connected to. Before the installation of a <br /> backwater valve, we recommend that all downspouts be disconnected from <br /> underground lines and capped, so that roof water does not flow out of the outside <br /> floor drain when the backwater valve closes. <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.