My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
721 WETMORE AVE 2022-05-17
>
Address Records
>
WETMORE AVE
>
721
>
721 WETMORE AVE 2022-05-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2022 12:04:48 PM
Creation date
5/17/2022 11:59:27 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
721
Notes
BACKWATER VALVE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS <br /> 4-7-? <br /> • 3 f ' <br /> Lam/ <br /> March 9, 2011 <br /> Beatrice Enfield <br /> 721 Wetmore Avenue <br /> Everett, Washington 98201 <br /> Re: Plumbing Investigation at 721 Wetmore Avenue for Backwater Valve Program <br /> Dear Mrs. Enfield: <br /> The City of Everett's contractor, Seattle Drain Services, inspected the plumbing and <br /> drainage at your property on November 11, 2010, to determine if a backwater valve is <br /> appropriate for your residence. Enclosed is a summary of their findings. <br /> The report recommends the installation of a backwater valve on the private side sewer <br /> that connects your home to the City's sewer main to reduce the risk of basement flooding <br /> from sewer backups. Please review the report and contact us with any questions. <br /> The next step is for you to confirm that you want to proceed with the program. To do <br /> that, please call Grant Moen at (425) 257-8947 and confirm your desire to have the City <br /> coordinate and fund the installation of a backwater valve on your side sewer. After <br /> receiving your authorization, we will hire a contractor to install the backwater valve in <br /> accordance with the installation and maintenance agreement documents you previously <br /> signed. <br /> If you choose to proceed, the contractor will contact you to schedule the installation. <br /> However, this is still a few weeks away. At the conclusion of the work, the excavation will <br /> be refilled and hardened surfaces (driveways and/or sidewalks) will be restored. You will <br /> also be provided on-site training on the operation and maintenance of the valve. <br /> Restoration of grass, plants and landscaping are your responsibility. <br /> The report also identifies deficiencies in your plumbing, sewer and drainage system. This <br /> includes: <br /> • All down spouts connected to the side sewer need to be disconnected so that <br /> during a surcharge event the roof water will not enter the house through the floor <br /> drain at the back door. <br /> • Your side sewer line has an eight foot flat area that will hold debris and potentially <br /> cause a blockage. <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.