My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/13/2022 Change Order 1
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 5/13/2022 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:55:38 AM
Creation date
5/18/2022 11:55:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/13/2022
Department
Public Works
Department Project Manager
John Nottingham/Keith Alewine
Subject / Project Title
2021 WPCF Trickling Filter Media Replacement
Public Works WO Number
UP3742
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0002980
Total Compensation
$29,749.72
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 7/12/2021
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order No. 1 <br /> Change Order Effective Date: May 4, 2022 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax, the amount of the change order for the <br /> changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts. The contract price <br /> shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the Mayor or <br /> his designee is authorized to direct Contractor to perform additional work. In calculating such <br /> threshold amounts, Washington State sales tax, if applicable to the Work, has been <br /> considered. <br /> 4, The duration of the Contract shall be adjusted to the extent described in this Change Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this Change <br /> Order, the work described in Exhibit A, and all work and actual or constructive changes that <br /> occurred or began prior to the date of this Change Order, including, but not limited to, claims <br /> for equitable adjustment of time and compensation, delay, impact, overhead, or <br /> inefficiencies. This provision does not apply to requests for equitable adjustment of time or <br /> price for which the Contractor timely and properly provided notice of a differing site condition, <br /> protest, dispute, claim or Contract Claim as required by the Contract Documents. If the <br /> Contract Documents establish a time period for notice of a differing site condition, protest, <br /> dispute, claim, or Contract Claim that ends after the date of this Change Order, but relates to <br /> work performed prior to the date of this Change Order, then this provision does not apply if <br /> the Contractor timely and properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the extent <br /> explicitly provided herein. <br /> 7. Signature(s) on this Change Order may be by pdf, email, fax, or other electronic means, in <br /> which case such signature(s) will have the same effect as an original ink signature. This <br /> Change Order may be signed in counterparts, each of which shall be deemed an original, <br /> and all of which, taken together, shall be deemed one and the same document. <br />
The URL can be used to link to this page
Your browser does not support the video tag.