Laserfiche WebLink
7 <br /> �uecic wv�xs <br /> 3 <br /> February 12, 2014 <br /> DeWayne Johnson <br /> 2209 23`d Street <br /> Everett, WA 98201 <br /> Re: Backwater Valve Installation at 2209 23rd Street <br /> Dear Mr.Johnson: <br /> � <br /> The City's contractor, Steve's Plumbing, inspected your plumbing and drainage on October 1, <br /> 2013 to determine if a backwater valve is appropriate for your property.Their findings I <br /> indicate that installing a backwater valve on your property would be beneficial. Please review � <br /> the enclosed report. i <br /> Previously, you signed the Backwater Valve Authorization Form authorizing the City to instail ! <br /> a ba�kwater valve at your property. Based on the inspection report, we are proceeding with � <br /> the installation. The City's contractor, Welwest ConsVuction, will be contacting you in <br /> February to schedule the work.This will require some excavation on your property. <br /> The Ciry will provide you on-site training on the operation and maintenance of the backwater <br /> i <br /> valve, Maintenance of the vaive and the plumbing, sewer, and drainage on your proper[y are � <br /> your responsibility. 9 <br /> � <br /> If you have any questions about this process, please contact Grart Moen at 425-257-8947 or � <br /> gmoen@everettwa.gov, or Brian Doolan at 425-257-8828 or bdoolan@everettwa.qov. Thank <br /> you for your interest in our backwater valve program. <br /> Sincerely, <br /> �� <br /> Mark Sadl ! <br /> Maintenance Superintendent <br /> Everett Public Works <br /> 1 <br /> � <br /> � <br /> CITY OF EVERETT• 3200 Cedar Street• Everett,WA 98201 • (425)257-8800 • Fax (425)257-8882 r ' ,� i <br /> i� � � <br />