Laserfiche WebLink
0 0 <br /> CITY OF EVERETT <br /> flieirr <br /> Public Works Department <br /> July 27, 2021 <br /> Patrick Harkins <br /> Harkins Construction LLC <br /> 7909 60th ST SE <br /> Snohomish, WA 98292 <br /> harkinsconstruction9Pgmail.com <br /> Owner: Everett Eagles Aeire #13 <br /> Job Address: 2818 & 2822 Hoyt Avenue <br /> Plan Check No: B2103-046 <br /> RE: Building Permit Review Letter <br /> Dear Patrick, <br /> In response to the application for a building permit, the plans have been examined and you are <br /> advised that revisions may be necessary before a permit can be issued. Please review and <br /> respond to the comments below. <br /> NON-STRUCTURAL <br /> General <br /> 1. The plans are required to be prepared and sealed by an architect licensed by the State of <br /> Washington. RCW 18.08.410 <br /> 2. The project constitutes the joining of two separate structures into one structure (allowable <br /> area calculations should be provided, even if passing) as well as an addition. The property <br /> line will therefore be dissolved, and the address will be consolidated (Public Works to <br /> determine official address during their review). IBC Section 506.1 <br /> 3. The project proposes an A-2 Occupancy on the upper floor and two A-3 occupancies on <br /> the lower floor—all non-separated uses. This is a change of occupancy for the (combined) <br /> building to an A-2 Occupancy. The compliance path followed from the International <br /> Existing Building Code for this change should be stated on the plans. IEBC Section 106.2.1 <br /> 4. A grease interceptor will be required for this project. The location should be shown on <br /> the plans. EMC 14.42 <br /> 5. The building will require an automatic sprinkler system to be installed throughout. <br /> Additional permits are required. IBC Section 903.2.1.2 <br /> 1i3 <br /> O 3200 Cedar Street © 425.257.8810 © tlee@everettwa.gov <br /> Everett, WA 98201 425.257.8857 fax everettwa.gov <br />