My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2818 HOYT AVE FRATERNAL ORDER OF EAGLES 2022-05-23
>
Address Records
>
HOYT AVE
>
2818
>
FRATERNAL ORDER OF EAGLES
>
2818 HOYT AVE FRATERNAL ORDER OF EAGLES 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 2:47:04 PM
Creation date
5/23/2022 2:46:08 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
2818
Tenant Name
FRATERNAL ORDER OF EAGLES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/19/2022 Page 3 <br /> City of Everett 11.1 <br /> 3:18:01PM <br /> INSPECTION ACTIVITY REPORT <br /> 3/4/2022 3/4/2022 BLDG KMK PARTIAL APPR see notes 3/3/2022 8:35 AM HARKINS <br /> 08-FRAMING CONSTRUCTION LLC <br /> Contact Name:HARKINS <br /> CONSTRUCTION LLC <br /> Site Address:2818 HOYT AVE <br /> Phone:3609263125 <br /> e-Mail: <br /> HARKINSCONSTRUCTION9@GMAIL.0 <br /> OM <br /> (3/4/2022 3:25 PM KMK) <br /> 1.Kitchen ceiling OK to insulate.(There is <br /> no electrical in this space) <br /> 2.Obtain mechanical permit and <br /> inspections for gas fire place. <br /> 4/11/2022 4/11/2022 BLDG 15-OTHER KMK OTHER see notes 4/6/2022 11:16 AM HARKINS <br /> CONSTRUCTION LLC <br /> Contact Name:HARKINS <br /> CONSTRUCTION LLC <br /> Site Address:2818 HOYT AVE <br /> Phone:3609263125 <br /> e-Mail: <br /> HARKINSCONSTRUCTION9@GMAIL.0 <br /> OM <br /> (4/11/2022 10:29 AM KMK) <br /> Discussed handrails and general inspection <br /> progress. <br /> 4/29/2022 4/29/2022 BLDG 16-FINAL KMK NOT READY eTRAKiT Inspection 4/26/2022 2:37 PM HARKINS <br /> Request CONSTRUCTION LLC <br /> Contact Name:HARKINS <br /> CONSTRUCTION LLC <br /> Site Address:2818 HOYT AVE <br /> Phone:3609263125 <br /> e-Mail: <br /> HARKINSCONSTRUCTION9@GMAIL.0 <br /> OM <br /> (4/29/2022 10:33 AM KMK) <br /> Obtain finals for mechanical and electrical <br /> permits. <br /> Note:The electrical sub permit of the fire <br /> alarm needs to be final as well as the gas on <br /> mechanical permit. <br /> 5/3/2022 5/4/2022 BLDG 16-FINAL KMK CORRECTION See notes 4/29/2022 9:21 AM HARKINS <br /> CONSTRUCTION LLC <br /> Contact Name:HARKINS <br /> CONSTRUCTION LLC <br /> Site Address:2818 HOYT AVE <br /> Phone:3609263125 <br /> e-Mail: <br /> HARKINSCONSTRUCTION9@GMAIL.0 <br /> OM <br /> (5/4/2022 8:24 AM KMK) <br /> 1.Finish basement egress per plan <br /> 2.Add hand rails to both sides of all stairs <br /> 3.Ramp in basement needs protection at <br /> edges per code <br /> INSP12 C SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.