• 8of21 <br /> • <br /> Monday, June 21, 2021 s. . <br /> FOUNDATION <br /> I <br /> Crew will install 3" Helical Piles and lift home to maximum practical recovery. Crew will drive piles to a maximum 25'after there <br /> will be a$20 a foot charge per pile. Dingo accessible. <br /> L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked and piles are installed <br /> with a maximum pile spacing of 8'-0"o.c. per the attached SSK-01. <br /> NOTES: <br /> 1. It is acceptable to install piles at the spacing shown with±0'-6"tolerance to allow for unexpected obstructions encountered during pile <br /> installation provided that no two adjacent spans exceed the spacing limitation of 8'-0"o.c. UNO. <br /> 2. End piles are to be placed within 3'-0"from corner as specified below UNO.\ <br /> (4)PILES @�'=0"OC MAX " LOCATE P)LE <br /> ___ r - WITHIN 1'0" <br /> FROM CORNER <br /> LOCATE PILE 2 22' 4 % <br /> WITHIN 1 0" ' a l° <br /> FROM OPENING r <br /> -2_1/4' 3 1/2. <br /> Q 0 LOCATE PILE, <br /> Q WITHIN 3'-0" <br /> A <br /> FROM CORNER <br /> ...ter <br /> 3` <br /> -t =3" Helical Pile <br /> w <br /> coo • °' <br /> NOTE:L120's scope is limited to the perimeter support systems/continuous footings of the primary structure.All stabilization and replacement efforts of <br /> interior elements,exterior decks,and deck supporting elements are outside of L120's contract and scope and are not addressed in this package.-L120 <br />