Laserfiche WebLink
10 of 21 <br /> PROJECT NO. SHEET NO. <br /> S210421-2XR SSK-01 <br /> PROJECT 1918 Lombard Ave Everett WA 98201 <br /> LONGITUDE SUBJECT Installation Detail - Ideal Helical Pile <br /> ONE TWENTY° <br /> ENGINEERING&DESIGN BY JT DATE 06/28/2021 <br /> (E)WOOD FRAMED <br /> FLOOR SYSTEM, <br /> FIELD VERIFY <br /> (E)CONC STEM WALL <br /> T/STEM WALL=k_ <br /> ° FIELD VERIFY <br /> 8" MIN THICKNESS, • <br /> /° • <br /> / T/FIN GRADE_e <br /> CONTRACTOR TO VERIFY • ° _rui—nlf—nnn' VARIES <br /> 11=1111=1111_IIII_, <br /> • 1111=1111=1111E1111= <br /> • 1' till=_1111EII11_ (E) FTG TO BE CUT FLUSH <br /> 0 o >- • <br /> 1111=1111=IIIIEIIIi <br /> nEIinEIillElillEl. WITH FACE OF STEM WALL <br /> _ nnEllu=lulE11,� = WITH A 12" MAX WIDTH FOR <br /> ° • II-11n=till=lilt lil <br /> o • 1111E1ii1=1i11 IUIE INSTALLATION POCKET <br /> • 11=1111=1i11= IfEIl <br /> 8 1111=1111-11 =1111= <br /> CV ° ° 11= 111=IIII_ III=1111 <br /> nn=u11 1111E1111_1i T/CONC FTG= <br /> IIf_1111_IIn= • • " • • In, 11-ini=nll= FIELD VERIFY sr <br /> —"li=1111=1111=1111=IIII=1111=III • ° • ° I =1111EIIII=III <br /> — il=nll=1111=IIIIIIII=. ° J 11=11111111= <br /> 'EMIE1111E111 =IIIIEIIII=III <br /> 'IEIIIIEil11 11=1111=1111= <br /> 1111E11n_111 • ° • ° =1111_1111_1' <br /> 1111=1111 ° °- IIE1111=111' <br /> ."=1111= IIE1111=1III=II11 E1III II11=1111.. <br /> 11=1111E1111E1111E1111\ iII1E1111 <br /> (E)CONTINUOUS 1111E1111E11`f <br /> CONC FOOTING IDEAL HELICAL PILE& REPAIR <br /> BRACKET ASSEMBLY PER <br /> NOTES: R&R FOUNDATION SPECIALIST <br /> 1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION TO CONFORM TO ESR-3750 <br /> DIMENSIONS PRIOR TO INSTALLATION.ENGINEER-OF-RECORD TO BE <br /> NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET. <br /> 2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A <br /> CORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUT <br /> ENDS AND DRILLED HOLES.CORROSION PREVENTION COATING <br /> SYSTEM BY OTHERS.PRIME AND PAINT PER MFR OR GALVANIZATION <br /> PER ASTM 153/A123. <br /> 3. AT CUT INSTALLATION POCKET ALL EXPOSED STEEL <br /> REINFORCEMENT SHALL BE SEALED OR COATED TO PREVENT <br /> CORROSION. <br /> L120 GNGINGGPING&DGSIGN <br />