Laserfiche WebLink
GENERAL CONSTRUCTION NOTES: 22. PRIOR TO SUBMISSION OF BID,CONTRACTOR SHALL COORDINATE WITH T-MOBILE REP <br /> TO DETERMINE IF ANY PERMITS WILL BE OBTAINED BY CONTRACTOR.ALL REQUIRED PERMITS t. <br /> NOT OBTAINED BYT-MOBILE MUST BE OBTAINED,AND PAID FOR,BY THE CONTRACTOR. _` <br /> 1. OWNER FURNISHED MATERIALS,T-MOBILE'THE COMPANY"WILL PROVIDE AND THE • <br /> CONTRACTOR WILL INSTALL <br /> ,. 23. CONTRACTOR SHALL INSTALL ALL SITE SIGNAGE IN ACCORDANCE WITH T-MOBILE A. 8T5 EQUIPMENT FRAME(PLATFORM)AND ICEBRIDGE SHELTER(GROUND SPECIFICATIONS AND REQUIREMENTS. _.. <br /> BUILD/CO-LOCATE ONLY) AMeR�CAN T+OW!'.R® , <br /> B. ACITELCO INTERFACE BOX(PPC) 24. CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS TO T-MOBILE FOR REVIEW ANO <br /> C. ICE BRIDGE(CABLE TRAY WITH COVER)(GROUND BUILD/CO-LOCATE ONLY,GC APPROVAL PRIOR TO FABRICATION. <br /> TO FURNISH AND INSTALL FOR ROOFTOP INSTALLATION) <br /> D. TOWERS,MONOPOLES <br /> E. TOWER LIGHTING 25. ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S <br /> F. GENERATORS&LIQUID PROPANE TANK SPECIFICATIONS AND LOCATED ACCORDING TO T-MOBILE SPECIFICATIONS,AND AS SHOWN IN <br /> THESE PLANS. Ai <br /> _ <br /> G. ANTENNA STANDARD BRACKETS,FRAMES AND PIPES FOR MOUNTING <br /> H. ANTENNAS(INSTALLED BY OTHERS) 26. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED HEREIN. <br /> I. TRANSMISSION LINE <br /> J. TRANSMISSION LINE JUMPERS THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL THE CONSTRUCTION MEANS, <br /> METHODS,TECHNIQUES,SEQUENCES AND PROCEDURES AND FOR COORDINATING ALL <br /> K. TRANSMISSION LINE CONNECTORS WITH WEATHERPROOFING KITS PORTIONS OF THE WORK UNDER THE CONTRACT. <br /> L. TRANSMISSION LINE GROUND KITS <br /> M. HANGERS 10jiji." <br /> 27. CONTRACTOR SHALL NOTIFY T-MOBILE REP A MINIMUM OF 48 HOURS IN ADVANCE OF <br /> N. HOISTING GRIPS POURING CONCRETE OR BACKFILLING ANY UNDERGROUND UTILITIES,FOUNDATIONS OR <br /> O. BTS EQUIPMENT SEALING ANY WALL,FLOOR OR ROOF PENETRATIONS FOR ENGINEERING REVIEWAND IVIRA <br /> APPROVAL. <br /> 2. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL OTHER MATERIALS FOR THE326 <br /> COMPLETE INSTALLATION OF THE SITE INCLUDING,BUT NOT LIMITED TO,SUCH 28. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SAFETY INCLUDING COMPLIANCE WITH TRYON <br /> MATERIALS AS FENCING,STRUCTURAL STEEL SUPPORTING SUB-FRAME FOR PLATFORM, ALL APPLICABLE OS-IA STANDARDS AND RECOMMENDATIONS AND SHALL PROVIDE ALL RALEIGH,NC 27603-3530 <br /> ROOFING LABOR AND MATERIALS,GROUNDING RINGS,GROUNDING WIRES, NECESSARY SAFETY DEVICES INCLUDING PPE AND PPM AND CONSTRUCTION DEVICES SUCH <br /> COPPER-CLAD ORXIT CHEMICAL GROUND ROD(S),BUSS BARS,TRANSFORMERS AND AS WELDING AND FIRE PREVENTION,TEMPORARY SHORING,SCAFFOLDING,TRENCH OFFICE:(919)661-6351 <br /> DISCONNECT SWITCHES WHERE APPLICABLE,TEMPORARY ELECTRICAL POWER, BOXES/SLOPING,BARRIERS,ETC. <br /> V•�'P9roBP•ne1 <br /> CONDUIT',LANDSCAPING COMPOUND STONE,CRANES,CORE DRILLING,SLEEPERS AND <br /> RUBBER MATTING,REBAR,CONCRETE CAISSONS,PADS AND/OR AUGER MOUNTS, <br /> MISCELLANEOUS FASTENERS,CABLE TRAYS,NON-STANDARD ANTENNA FRAMES AND 29. THE CONTRACTOR SHALL PROTECT AT HIS OWN EXPENSE,ALL EXISTING FACILITIES AND • <br /> REV. DESCRIPTION BY DATE <br /> ALL OTHER MATERIAL AND LABOR REWIRED TO COMPLETE THE JOB ACCORDING TO SUCH OF HIS NEW WORK UABLE TO INJURY DURING THE CONSTRUCTION PERIOD.ANY /� <br /> THE DRAWINGS AND SPECIFICATIONS.IT IS THE POSITION OF T-MOBILE TO APPLY FOR DAMAGE CAUSED BY NEGLECT ON THE PART OF THIS CONTRACTOR OR HIS !A\ PRELIMINARY SRZ 06/30/21 <br /> PERMITTING AND CONTRACTOR RESPONSIBLE FOR PICKUP AND PAYMENT OF REQUIRED REPRESENTATIVES,OR BY THE ELEMENTS DUE TO NEGLECT ON THE PART OF THIS <br /> PERMITS. CONTRACTOR OR HIS REPRESENTATIVES,EITHER TO THE EXISTING WORK.OR TO HIS WORK 0 100%CONSTRUCTION SRZ 09/22/21 <br /> OR THE WORK OF ANY OTHER CONTRACTOR,SHALL BE REPAIRED AT HIS EXPENSE TO THE /� <br /> 3. ALL WORK SHALL CONFORM TO ALL CURRENT APPLICABLE FEDERAL,STATE.AND LOCAL OWNER'S SATISFACTION. /�/�\� - <br /> CODES,INCLUDING ANSIIEIAITIA-222,AND COMPLY WITH ATC CONSTRUCTION ' ` - <br /> SPECIFICATIONS. 30. ALL WORK SHALL BE INSTALLED IN A FIRST CI ASS,NEAT AND WORKMANLIKE MANNER /� <br /> BY MECHANICS SKILLED IN THE TRADE INVOLVED.THE QUALITY OF WORKMANSHIP SHALL BE / \ <br /> 4. CONTRACTOR SHALL CONTACT LOCAL 811 FOR IDENTIFICATION OF UNDERGROUND TOBJEOFT T INFERIOR THE QUALITYUOVAY AND/ORHE MOBILE REP. SHANALL BE REPLACED D <br /> THE T-MOBILE KED <br /> TO BE OF AND/OR WORKMANSHIP SHALL BE REPLACED AND/OR REWORKED ATC SITE NUMBER: <br /> UTILITIES PRIOR TO START OF CONSTRUCTION. AT CONTRACTOR EXPENSE UNTIL APPROVAL IS OBTAINED. <br /> 83177 <br /> 5. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED 31. IN ORDER TO ESTABLISH STANDARDS OF QUAUTY AND PERFORMANCE,ALL TYPES OF <br /> INSPECTIONS. MATERIALS USTED HEREINAFTER BY MANUFACTURER'S NAMES AND/OR MANUFACTURER'S ATC SITE NAME: <br /> CATALOG NUMBER SHALL BE PROVIDED BYTHESE MANUFACTURERS AS SPECIFIED. <br /> 6. ALL DIMENSIONS TO,OF,AND ON EXISTING BUILDINGS,DRAINAGE STRUCTURES,AND PORT GARDNER <br /> SITE IMPROVEMENTS SHALL BE VERIFIED IN FIELD BY CONTRACTOR WITH ALL 32. T-MOBILE FURNISHED EQUIPMENT SHALL BE PICKED-UP AT THE T-MOBILE WAREHOUSE, <br /> DISCREPANCIES REPORTED TO THE ENGINEER. NO LATER THAN 48HR AFTER BEING NOTIFIED INSURED,STORED,UNCRATE,PROTECTED AND T-MOBILE SITE NAME: <br /> INSTALLED BY THE CONTRACTOR WITH ALL APPURTENANCES REQUIRED TO PLACE THE <br /> 7. DO NOT CHANGE SIZE OR SPACING OF STRUCTURAL ELEMENTS. EQUIPMENT IN OPERATION,READY FOR USE.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MADISON/ATC/SUNRISE <br /> THE EQUIPMENT AFTER PICKING IT UP. <br /> SITE ADDRESS: <br /> 8. DETAILS SHOWN ARE TYPICAL:SIMILAR DETAILS APPLY TO SIMILAR CONDITIONS UNLESS 33. T-MOBILE OR HIS ARCHITECT/ENGINEER RESERVES THE RIGHT TO REJECT ANY <br /> OTHERWISE NOTED. EQUIPMENT OR MATERIALS WHICH,IN HIS OWIN OPINION ARE NOT IN COMPLIANCE WITH THE 2630 MADISON ST <br /> CONTRACT DOCUMENNTS,EITHER BEFORE OR AFTER INSTALLATION AND THE EQUIPMENT EVERETT,WA 98203-5476 <br /> 9. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SHALL BE REPLACED WITH EQUIPMENT CONFORMING TO THE REQUIREMENTS OF THE <br /> SAFETY WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. CONTRACT DOCUMENTS BY THE CONTRACTOR AT NO COST TO T-MOBILE OR THEIR SEAL: <br /> ARCHITECT/ENGINEER. <br /> 10. CONTRACTOR SHALL BRACE STRUCTURES UNTIL ALL STRUCTURAL ELEMENTS NEEDED / OpVI0 T/g <br /> FOR STABILITY ARE INSTALLED.THESE ELEMENTS ARE AS FOLLOWS:LATERAL BRACING, SPECIAL CONSTRUCTION <br /> ANCHOR BOLTS,ETC. Q N�OF WA$y�yep�• <br /> ANTENNA INSTALLATION NOTES: <br /> 11. CONTRACTOR SHALL DETERMINE EXACT LOCATION OF EXISTING UTILITIES,GROUNDS <br /> DRAINS,DRAIN PIPES,VENTS,ETC.BEFORE COMMENCING WORK. 1.� (• i'- • <br /> 1. WORK INCLUDED: <br /> 12. INCORRECTLY FABRICATED,DAMAGED,OR OTHERWISE MISFITTING OR j ' .1NONCONFORMING MATERIALS OR CONDITIONS SHALL BE REPORTED TO THE T-MOBILE A. ANTENNA AND COAXIAL CABLES ARE FURNISHED BYT-MOBILE UNDER A SEPARATE -a . /" <br /> REP PRIOR TO REMEDIAL OR CORRECTIVE ACTION.ANY SUCH REMEDIAL ACTION SHALL CONTRACT,THE CONTRACTOR SHALL ASSIST ANTENNA INSTALLATION CONTRACTOR IN 4 <br /> REQUIRE WRITTEN APPROVAL BY THE T-MOBILE REP PRIOR TO PROCEEDING. TERMS OD COORDINATION AND SITE ACCESS.ERECTION SUBCONTRACTOR SHALL BE <br /> RESPONSIBLE FOR THE PROTECTION OF PERSONNEL AND f30 47255 �� <br /> 13, EACH CONTRACTOR SHALL COOPERATE WITH THE T-MOBILE REP,AND COORDINATE HIS 0 <br /> WORK WITH THE WORK OF OTHERS. B. INSTALL ANTENNA AS INDICATE ON DRAWINGS AND T-MOBILE SPECIFICATIONS. FSS/QNAL ,NG` <br /> 14. CONTRACTOR SHALL REPAIR ANY DAMAGE CAUSED BY CONSTRUCTION OF THIS <br /> PROJECT TO MATCH EXISTING PRE-CONSTRUCTION CONDITIONS TO THE SATISFACTION C. INSTALL GALVANIZED STEEL ANTENNA MOUNTS AS INDICATED ON DRAWINGS 09/22/21 <br /> OF THE T-MOBILE CONSTRUCTION MANAGER. <br /> D. INSTALL FURNISHED GALVANIZED STEEL OR ALUMINUM WAVEGUIDE. <br /> 15. ALL CABLE/CONDUIT ENTRY/EXIT PORTS SHALL BE WEATHERPROOFED DURING <br /> INSTALLATION USING A SILICONE SEALANT. E. CONTRACTOR SHALL PROVIDE FOUR(4)SETS OF SWEEP TESTS USING <br /> ANRITZU-PACKARD 87138 IT <br /> i9 RF SCALAR NETWORK ANALYZER.SUBMIT FREQUENCY DOMAIN ® ilex <br /> 16. WHERE EXISTING CONDITIONS DO NOT MATCH THOSE SHOWN IN THIS PLAN SET, REFLECTOMETER(FDR)TESTS RESULTS TO THE PROJECT MANAGER.SWEEP TESTS SHALL BE <br /> CONTRACTOR SHALL NOTIFY THE T-MOBILE REP AND ENGINEER OF RECORD _ _ <br /> IMMEDIATELY. AS PER ATTACHED RFS"MINIMUM FIELD TESTING RECOMMENDED FOR ANTENNA AND HELWL <br /> COAXIAL CABLE SYSTEMS'DATED 10/5/93.TESTING SHALL BE PERFORMED BY AN H,.~ '¢(` <br /> 17. CONTRACTOR SHALL ENSURE ALL SUBCONTRACTORS ARE PROVIDED WITH A COMPLETE INDEPENDENT TESTING SERVICE AND BE BOUNDAND SUBMITTED WITHIN ONE WEEK OF � * DATE DRAWN: 09/22/21 <br /> AND CURRENT SET OF DRAWINGS AND SPECIFICATIONS FOR THIS PROJECT. WORK COMPLETION. ," 3 ^*, I "y C-,.,'. `'$ \J i1 ATC JOB NO: 13671473 <br /> it 1 k`L.' L ,�/ CUSTOMER NAME: MADISON(ATC(SUNRISE <br /> 18. CONTRACTOR SHALL REMOVE ALL RUBBISH AND DEBRIS FROM THE SITE AT THE END OF F. INSTALL COAXIAL CABLES AND TERMINATING BETWEEN ANTENNAS AND EQUIPMENT PER <br /> EACH DAY. MANUFACTURER'S RECOMMENDATIONS.WEATHERPROOF ALL CONNECTIONS BETWEEN THE <br /> CUSTOMER ID: SE01644A <br /> ANTENNA AND EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.TERMINATE ALL COAXIAL <br /> 19. CONTRACTOR SHALL COORDINATE WORK SCHEDULE WITH AMERICAN TOWER CABLE THREE(3)FEET IN EXCESS OF ENTRY PORT LOCATION UNLESS OTHERWISE STATED. <br /> CORPORATION(ATC)AND TAKE PRECAUTIONS TO MINIMIZE IMPACT AND DISRUPTION OF <br /> OTHER OCCUPANTS OF THE FACILITY. GENERAL <br /> NOTES <br /> G. ANTENNA AND COAXIAL CABLE GROUNDING: GENERAL NO I ES <br /> ALL DISCREPANCIES FROM WHAT IS SHOWN ON THESE <br /> 20. CONTRACTOR SHALL FURNISH T-MOBILE AND AMERICAN TOWER CORPORATION(ATC) CONSTRUCTION DRAWINGS SHALL BE COMMUNICATED TO ATC <br /> WITH A PDF MARKED UP AS-BUILT SET OF DRAWINGS UPON COMPLETION OF WORK. 2. ALL EXTERIOR 86 GREED GROUND WIRE"DAISY CHAIN"CONNECTIONS ARE TO BE ENGINEERING IMMEDIATELY FOR CORRECTION OR RE-DESIGN. <br /> WEATHER SEALED WITH RFS CONNECTORS/SPLICE WEATHERPROOFING KIT 8221213 OR FAILURE TO COMMUNICATE DIRECTLY WITH ATC ENGINEERING OR <br /> 21. PRIOR TO SUBMISSION OF BID,CONTRACTOR SHALL COORDINATE WITH T-MOBILE REP EQUAL. ANY CHANGES FROM THE DESIGN CONDUCTED WITHOUT PRIOR <br /> TO DETERMINE WHAT,IF ANY,ITEMS WILL BE PROVIDED.ALL ITEMS NOT PROVIDED APPROVAL FROM ATC ENGINEERING SHALL BETHE SOLE SHEET NUMBER: REVISION:REVISION: <br /> " SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR.CONTRACTOR WILL INSTALL 3. ALL COAXIAL CABLE GROUNDING KITS ARE TO BE INSTALLED ON STRAIGHT RUNS OF RESPONSIBILITY OF THE GENERAL CONTRACTOR. G O O2 0 <br /> ALL ITEMS PROVIDED. COAXIAL CABLE(NOT WITHIN BENDS) <br />