Laserfiche WebLink
08-29-13 <br /> Storm drain flooding <br /> scat/ Kathleen Pool Page 1 <br /> 4711 Elm Street <br /> Costs Estimated Amount <br /> Service Master <br /> Water Mitigation / Removal $ 5,419.81 <br /> )HB LTD <br /> Reconstruction / Installation $14,080.25 <br /> Contents Loss Estimated $ 6,996.00 <br /> PODS <br /> Rental for upto 3 months $ 614.97 <br /> Labor for Removal / Documentation <br /> 115.5 hrs@17.56 / hour $ 2080.18 <br /> Snohomish County Solid Waste <br /> Dump Fees $ 1 32.00 <br /> Sandbags to Go <br /> 30 sandbags at$3.00/ea $ 90.00 <br /> Elevated electricity costs <br /> From fans and Humidifiers 10 days $ 400.00 <br /> Vacation Time from Work <br /> 23.5 hours @ $33.52 / hr. $ 787.72 <br /> Total Overall Estimated Loss <br /> $ 30,600.93 <br /> � a� <br />