My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4957 VISTA PL 2022-05-24
>
Address Records
>
VISTA PL
>
4957
>
4957 VISTA PL 2022-05-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2022 1:31:27 PM
Creation date
5/24/2022 1:31:01 PM
Metadata
Fields
Template:
Address Document
Street Name
VISTA PL
Street Number
4957
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake & Approval Sheet • (FOR PERMIT STAFF ONLY) • PERMIT# 0_2C —CI <br /> BUILDING PLANNING <br /> Intake OK by: Date: Intake OK by: Assign To: Y ► 74 Date: q/7-6/20 <br /> Intake Comments: Intake Comments: IS - <br /> ❑ Route to Commercial Building ❑ Attach to Project No. <br /> ❑ Route to Residential Building ❑ Route to Historic Reviewer <br /> ❑ Make this a "W" Permit OK to Route to Other Departments <br /> Bldg/TI/Addy em S>i / Td ,r`F Hold in Planning File Drawer <br /> Garage/Accessory Struct. Size P/C-5 Zone f-- t <br /> Number of Stories / Overlay/Agreement <br /> pp�� <br /> Basement ICtNo ❑Yes , Fin/Unfin Nonresidential Use <br /> Type of Construction I/.!U Residential Use 5 rg. <br /> Occupancy Group /e`3 Proposed No. of Dwelling Units: <br /> Occupancy Load I <br /> Total No. of Dwelling Units: <br /> Fire Sprinklers: ❑Update Existing ❑New System chot Req'd Planning/Landscape Inspection Required before Final? ❑Yes liNo <br /> Reason Sprinklers Required: "I 'eu" Fee:Type: , A�etrrrt-$"' <br /> Fire Alarm: ❑Update Existing ❑New System iliNot Req'd School Impa e: Total $ <br /> Reason Fire Alarm Required: Calculated: Credit: <br /> RCW 64.55 MF worksheet req'd for permit? ❑ ��-,-��Yes 1 I No ❑Eyerett"5chool Dist Mu ' School Dist <br /> Add'I RCW 64.55 docs required prior to final? ❑Yes „GjNo Additional Notes: <br /> VALUATION CALCULATION: Total $ r. �'"0• 0,3 <br /> (i3 )( 0 ')x4,0;7, <br /> Approved By: (� Date:12—/3/ <br /> PUBLIC WORKS <br /> Intake OK by: Date: <br /> Additional Notes: Intake Comments: I PW Worksheet Needed if: <br /> ❑Sys Dev Eval OTraffic Mit Eval <br /> ❑Site Work or Drainage Proposed <br /> / / , ❑Backflow Prevention for high hazard: <br /> Approved By � Date: G� � (dental,medical,animals,mortuary,hospital, <br /> supportive housing) <br /> FIRE DEPARTMENT ❑Route this folder for PW Review at end --- PW Review Worksheet <br /> Separate/Deferred Submittals Required: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> Additional Notes: ❑ This Permit is Approved by Public Works <br /> 0 See PW Review Worksheet and associated attached items <br /> Fire Dept. Fees: ❑ A Separate PW Permit is Required (Permit#: PW ) <br /> ❑ Review of As-Built Plans-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> Approved By: Date: g Public Works has no scope--- PW Not Required <br /> Additional Notes: <br /> ELECTRICAL AtAN W HUANGt lo/tJzo <br /> Additional Notes: <br /> Approved By: Date: Approved By: Date: <br /> 2/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.