My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5415 S 3RD AVE 2022-05-24
>
Address Records
>
S 3RD AVE
>
5415
>
5415 S 3RD AVE 2022-05-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2022 2:12:52 PM
Creation date
5/24/2022 2:11:37 PM
Metadata
Fields
Template:
Address Document
Street Name
S 3RD AVE
Street Number
5415
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> Drew Martin <br /> From: Drew Martin . <br /> Sent: Wednesday,August 25, 2021 3:30 PM <br /> To: 'mwesener@soseattle.com' <br /> Subject: City of Everett Permit Services: 5415 S 3rd Avenue (B2108-061) - First Building Intake <br /> Review <br /> Attachments: 2018 IRC_Typical Code References_04-12-2021.docx; City of Everett - Residential <br /> Drawing Preparation.pdf <br /> Hello, Mr. Wesener. <br /> Your application has been received and a permit set up. However, the submitted documents are not sufficient <br /> for us to perform a review at this time. Construction-level documents need to be submitted for <br /> review. Information is attached to provide guidance. Preliminary comments are provided below to assist in <br /> preparing the drawings, but these are not intended to provide a comprehensive review. Depending on your <br /> experience with the model codes and preparing documents, we recommend consulting with a design <br /> professional to assist you. <br /> 1. The application includes sketch-level drawings. Construction level drawings should be submitted <br /> showing the proposed work. See IRC Section R106.1.1. <br /> 2. Continuing with the previous comment, the plans should demonstrate that the existing building will <br /> maintain its egress paths after the deck is demolished. See IRC Section R311.1. <br /> 3. Details for the infill of the existing doors should be included in the drawings. <br /> 4. The project appears to include new windows. The required thermal ratings should be specified per the <br /> 2018 WSEC Table R402.1.1. <br /> Review of your project will be performed in the order received once the required documentation has been <br /> submitted. Please let me know if you have questions. <br /> Drew Martin, P.E., S.E. <br /> imAssociate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/T: 8 am -12 pm & 1 pm—3 pm;Tu: 1:0Opm-3:00pm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.