My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/05/25 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/05/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 4:52:54 PM
Creation date
5/25/2022 2:01:35 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/25/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2022 Sorticulture TPA Contract PDF.pdf <br />(4) Authorize the Mayor to sign the contract with Brink Electric, Inc. for the Everett <br />Transit Operations Base Inductive Charging Infrastructure Project. <br />Documents: <br />ET Inductive Charging Infrastructure Project PDF.pdf <br />(5) Authorize the Mayor to sign an energy services agreement with the Washington <br />State Department of Enterprise Services and McKinstry Essention, LLC. for the Main <br />Library HVAC Replacement Project in the Amount of $88,000.00. <br />Documents: <br />Main Library HVAC Dept of Enterprise Services PDF.pdf <br />(6) Authorize the Mayor to sign a Professional Services Agreement with Parametrix, <br />Inc. for GC/CM advisory and consulting services for the Everett Municipal Building - <br />Public Works Tenant Improvements Project in the amount not to exceed $90,758.00. <br />Documents: <br />Professional Services Agreement Parametrix PDF.pdf <br />(7) Award the construction contract for the Shore Avenue Forcemain Project to Redtail, LLC <br />of Snohomish, WA in the amount of $855,032.99, and authorize the Mayor to sign the <br />contract in substantially the form provided. <br />Documents: <br />Redtail LLC Share Ave Forcemain Award PDF.pdf <br />ACTION ITEMS: <br />(8) CB 2205-15- 3rd and final Reading - Adopt an Ordinance creating a Special <br />Improvement Project entitled "Everett Main Library HVAC Replacement Project", Fund <br />342, Program 034, to accumulate project costs in the amount of $88,000 <br />Documents: <br />CB2205-15.pdf <br />(9) CB 2205-16 - 3rd and final Reading - Adopt an Ordinance creating a Special <br />Improvement Project entitled "3rd Avenue Water Quality Treatment" Fund 336, Program <br />029. <br />Documents: <br />CB2205-16.pdf <br />(10) CB 2205-17 - 3rd and final Reading - Adopt an Ordinance amending Ordinance No. <br />3811-21 entitled "South Police Precinct Locker Room Renovation Project", Fund 342, <br />Program 032, to accumulate the construction funds for the project in the amount of <br />$400,000. <br />Documents: <br />
The URL can be used to link to this page
Your browser does not support the video tag.