My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
717 WETMORE AVE 2022-05-31
>
Address Records
>
WETMORE AVE
>
717
>
717 WETMORE AVE 2022-05-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 2:19:11 PM
Creation date
5/31/2022 2:18:34 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
717
Notes
BACKWATER VALVE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS @gp;11/7 <br /> o ' ► . * <br /> October 1, 2012 <br /> Pat Abby <br /> 717 Wetmore Avenue <br /> Everett, Washington 98201 <br /> Re: Plumbing Investigation at 717 Wetmore Avenue for Backwater Valve Program <br /> Dear Mr. Abby: <br /> The City of Everett's contractor, Steve's Plumbing, inspected the plumbing and drainage <br /> at your property on September 4, 2012, to determine if a backwater valve is appropriate <br /> for your residence. Enclosed is a summary of their findings. <br /> The report recommends the installation of a backwater valve on the private side sewer <br /> that connects your home to the City's sewer main to reduce the risk of basement flooding <br /> from sewer backups. Please review the report and contact us with any questions. <br /> From previous conversations you have indicated your desire to move forward with the <br /> installation of the backwater valve. If you have changed your decision or have any <br /> questions or concerns please call Grant Moen at (425) 257-8947 or Brian Doolan at (425) <br /> 257-8828 and inform us of your change. The City will hire a contractor to install the <br /> backwater valve in accordance with the installation and maintenance agreement <br /> documents you previously signed. <br /> After the contractor has been selected they will contact you to schedule the installation. <br /> However, this is still a few weeks away. At the conclusion of the work, the excavation will <br /> be refilled and hardened surfaces (driveways and/or sidewalks) will be restored. You will <br /> also be provided on-site training on the operation and maintenance of the valve. <br /> Restoration of grass, plants and landscaping are your responsibility. <br /> The report also identifies deficiencies in your plumbing, sewer and drainage system. This <br /> includes: <br /> • Your downspouts will need to be disconnected in order to have the backwater <br /> valve function correctly. However, the area around your house may then become <br /> wetter. See solution to problem No. 2 in the attached inspection report. <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.