Laserfiche WebLink
l e erty� , <br /> ` t <br /> Permitee: I <br /> PerttlitteeI <br /> District; <br /> • <br /> companies rated A- or bettor by Beet's Key Rating Guide. Nothing contained in thQpa <br /> with its operations under this contract, <br /> 20. In consideration of the grant of this permit,the Permittee shall be responsible <br /> for,pay in full, and indemnify and hold harmless,the District from and against any and all <br /> assessments,real property taxes, leasehold excise taxes assessed pursuant to ROW 82.29A, <br /> or payment of any and all other taxes of whatsoever nature which may be assessed as a result <br /> of the use of the land under this permit or installation or use of the permitted facilities upon <br /> such land by Permittee,except for taxes levied on income to the District. <br /> 21.This permit is not transferrable. <br /> 22.There shall be no storage of equipment,materials,vehicles,fuels,paints,solvents, <br /> oils, pesticides, or other sources of contamination upon.District property, except for fuel in <br /> non-leaking vehicles and equipment •parked upon the Permit Area during Permittee's <br /> business hours,for Permittees'employees,contractors, and business invites. There shall be <br /> no dumping or disposal of any kind on the District's property. No fill shall be imported to <br /> District property except fill known to be clean, contaminant-free, and capable of supporting <br /> vehicles and structures to be placed thereon. <br /> 23. Spills and leaks of gasoline, oil, hydraulic fluid, or other dangerous or hazardous <br /> substances, pollutants or contaminants upon the Permit Area, shall be contained by <br /> Permittee and/or its contractor within one(1)hour of discovery,and shall be reported to the <br /> State of Washington, Department of' Ecology, and to the District, cleanup initiated by <br /> Permittee and/or its contractor within 12 hours of discovery. Such spills and leaks shall be <br /> cleaned up to not less than the levels required by applicable law; no residual contaminants <br /> shall remain, requiring use of"institutional controls". <br /> 24. Permittee shall be responsible to maintain adequate support around utility poles <br /> for any excavation within the Permit Area, and to maintain adequate and lawful clearances <br /> at all times from District power lines and facilities. Changes to the District facilities deemed <br /> necessary by the District as a result of any site alterations constructed by Permittee shall be <br /> at Permittee's sole expense. <br /> Form Rev.6/13/97;8/18/09 <br /> COE 8.26.20 Page 5 of 6 <br />