Laserfiche WebLink
IVY: SEC 71 T �/P 29 10 RGE SEp 'W. . <br />NOTES <br />WATER <br />7 R MAIN SHALL BE DUCTILE <br />IRON <br />f PIPE <br />M'iM • ► 11 M' <br />PIPE RA 7ED FOR 2 P <br />I <br />j. DIAMETER <br />OF THE • P <br />ALL FIRE HYDRANT RUNS TO BE DUC77LE IRON PIPE PER COE <br />y2022 THE BLUELINE GROUP <br />UNDERGROUND UT11 ITY NOTE <br />UNDERGROUND U 77LI 77ES ARE SHOW IN 7HE APPROXIMATE L OCA 770N. THERE IS <br />NO GUARAN TEE THAT ALL U 77LI TY LINES ARE SHOW, OR THAT THE LOCA 77ON, <br />SIZE AND MATERIAL IS ACCURATE. THE CON7RACTOR SMALL UNCOVER ALL <br />INDICATED PIPING WERE CROSSING, IWE'RFERENCES, OR COIVNEC71ONS OCCUR <br />PRIOR TO 7RENCHING OR EXCAVA77ON FOR ANY PIPE OR S7RUC7UREE Z, TO <br />DEIEiRMINE ACTUAL LOCA 77ONS, SIZE AND MA 7ERIAL. THE CON7RACTOR SMALL, <br />MAKE THE APPROPRIA7F PROWSION FOR PROTEC77ON OF SAID FACILI7YES, THE <br />CONTRACTOR SMALL N077FY QK� ALL AT 8-1-1 (WASHINGTON811. Com) AND <br />ARRANGE FOR FIELD LGCA 770N OF EXI 77NO FAC'IU77ES BEFORE C0NS7RUC770N <br />BLUELE <br />25 CENTRAL WAY, SUITE 400, <br />KIRKLAND, WA 98033 <br />R:425,216.4051 F.425-216,4052 <br />WWW.THEBLUELINEGROUP,COM <br />SCALE, - <br />AS NCTEV <br />PROJFC T MANAGE"R: <br />CHRIS MILLER, PE <br />PROJECT ENGINEER: <br />, ;r KOEPFOM PE <br />DESIGNER: <br />SHAM COOPER <br />ISSUES DATE." <br />412512022 <br />{ <br />3 <br />S <br />1 <br />i <br />i <br />I <br />p��yj3 <br />I <br />1 <br />$ <br />j <br />I <br />£ <br />I <br />I <br />i <br />I <br />i <br />rz <br />I <br />ul <br />ul <br />E <br />Q. <br />ff <br />41 <br />Ej <br />W <br />ri <br />El <br />�A ER <br />^7 <br />a� <br />f <br />JOB NLtMBER: <br />-13 <br />SHE"Er NAME: <br />s W02 <br />HT <br />15 cr <br />20 <br />