Laserfiche WebLink
F <br />q"AF <br />(D2C22 THE BLUELINE GROUP <br />30 20 <br />NOT TO SCA;LE <br />ICJE SEC % TWP 29N, RGLam' SEp W.M. <br />(BUBBLE- UP S7RUC7uE <br />WIBIRLICAGE cA F2 <br />PER COE S7D DWG 434) <br />UNDERGROUND UTILITY N13TE <br />UNDERGROUND U7 LI77ES ARE�SHOWN IN THE APPROXIMATE LQCA770N. THERE IS <br />NO GUARANTEE INAT ALL U77LITY LINES ARE SHOW, OR THAT THE LOCA770N, <br />SIZE AND MATERIAL IS ACCURATE; 77•IE CON I ACTOR SHALL UNCOVER ALL <br />INCICA7EL1 PIPING WHERE CROSSING, IWERFERENCES� OR CONNEC77ONS OCCUR <br />PRIOR TO TRENCHING OR EXCA VA 77ON FOR ANY PIPE OR S7RUC7URES, TO <br />DETERMINE ACTUAL LOCATFONS, SIZE AND MATERIAL. 77-IE CONTRACTOR SHALL <br />MAKE THE APPROPRIATE" PROWSION FOR PRU7E'CTFON OF SAID FACILITIES, THE <br />CON7RACTOR SHALL NCB 77FY ME CALL A T 8 1--1 (ASHINGTON811. COM) AND <br />ARRANGE FOR FIELD LOCA 77CN OF EXIS77NG FACIL 177ES BEFORE CONSTRUCTPON.. <br />ww <br />4D <br />B <br />L U " L N E <br />25 CENTRAL WAY SUITE 400, <br />KIRKLAND, WA 99033 <br />P:425.2164051 F; 425,216,4052 <br />WWW,TH LUELlNEGR0UP,C0 <br />SCALE <br />AS NOW <br />PROJECT MANAGER: <br />CHRIS MILLER, PE <br />PROJECT ENGINEER: <br />JON KOEPFCEN, PE <br />SI'IAWN COOPER <br />412612022 <br />3 <br />1 <br />[4 <br />4.i <br />Ell <br />q <br />{i <br />i <br />5 <br />y� <br />M7 <br />rh <br />i <br />q <br />i <br />ul <br />En <br />Ej <br />Ej <br />it <br />41 <br />LQ <br />W As <br />r s i <br />` <br />/ONAL <br />'JOB NUMBER: <br />I '- 137 <br />SHEET NAME; <br />R P-02 <br />5HT <br />19 CIF 2 <br />