My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4122 COLBY AVE 2020 Plans 2022-12-01
>
Address Records
>
COLBY AVE
>
4122
>
Plans
>
4122 COLBY AVE 2020 Plans 2022-12-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 11:19:22 AM
Creation date
6/14/2022 3:57:27 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4122
Permit
B2004-029
Year
2020
Notes
NEW 3-STORY WOOD-FRAMED TOWNHOUSE / DUPLEX
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOUNDATION PLA TES: <br />1. EXTERIOR FOOTINGS SHALL BEAR A I 1'-6" BELOW ADJACENT A . <br />4. REFER TO SKEET S3.1 FOR FOUNDATION DETAILS. <br />S® PLACE ALL REINFORCEMENT PER THE STRUCTURAL NOTES AND FOUNDATION DETAILS. REFER TO SHEET S1.1 <br />FOR ADDITIONAL CONCRETE DETAILING REQUIREMENTS. <br />LOCATIONS,8. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, WALL R _ <br />ARCHITECTURAL DRAWINGS AND NOTIFY ALL PARTIES OF ANY DISCREPANCIES. <br />2. COLUMNS : BEARING WALLS SHOWN ON PLANSz f D DOWN TO THE FOUNDATION <br />UNLESS CARRIED BY A BEAM BELOW. <br />3. REFER TO SHEET S4.1 TH U S4.3 FOR TYPICAL FLOOR FRAMINGDETAILS. <br />4. CONTRACTOR SHALL HAVE THE OPTION TO DRILL A 11/2"0 HOLE CENTERED IN THE DEPTH AND AT THE THIRD <br />POINT OF THE SPAN R ALL WOOD FLUSH BEAMS <br />k ., `► - s.Is_ ON INN I <br />9, UNLESS NOTED OTHERWISE, ALL BEAM -TO -BEAM CONNECTIONS SHALL BE SIMPSON HU SERIES FACE MOUNT <br />HANGERS / MAX NAILING. <br />Y. <br />x <br />„y <br />
The URL can be used to link to this page
Your browser does not support the video tag.