Laserfiche WebLink
M <br />,n <br />00 <br />0 <br />N <br />O <br />N <br />W <br />e-1 <br />LLJ <br />0 <br />0 <br />0 <br />0 <br />N <br />O <br />N <br />() <br />SINE ., <br />RIGNT,OF,WAY <br />v <br />P. � <br />< 1 <br />2 <br />PROPOSED COALESCING <br />PLATE SEPARATOR <br />\ 3 <br />o LS <br />M N SN. GA <br />W.) <br />dOoo <br />N/0 R <br />0W� <br />P\ZN�O ROWS <br />W.M. <br />2 <br />3 <br />0 SOIL AND SEDIMENTATION CONTROL KEYNOTES: <br />1. INSTALL CONSTRUCTION FENCE WITH COMPOST SOCK. CONTRACTOR TO FIELD VERIFY AND <br />COORDINATE LOCATION(S) OF CONSTRUCTION ACCESS GATE(S) WITH OWNER'S REPRESENTATIVE. <br />SEE DETAIL 1/C5.01. INCLUDES CITY OF EVERETT BMP'S #C103 AND #C233. <br />2. PROVIDE AND INSTALL CONCRETE WASHOUT AREA. SEE DETAIL 9/C5.01. INCLUDES CITY OF <br />EVERETT BMP'S #C151, #C152, AND #C153. <br />3. PROVIDE AND INSTALL INLET PROTECTION. SEE STANDARD DETAIL ON SHEET C5.00. INCLUDES CITY <br />OF EVERETT BMP #C220. <br />4. PROVIDE AND INSTALL STABILIZED CONSTRUCTION ACCESS. SEE STANDARD DETAIL ON SHEET <br />8.5W(0.2'W/0 R.O.W.) <br />C5.00. LOCATION MAY VARY THROUGHOUT THE DURATION OF CONSTRUCTION. GC RESPONSIBLE <br />TO DOCUMENT DEVIATION FROM THE PREPARED PLANS. INCLUDES CITY OF EVERETT BMP #C105. <br />SN. (2.9'W/0 R. 0. W ) <br />MON. SN. (5.8'W/0 R. 0. W.) <br />30. DO' <br />CITY OF EVERETT STANDARD ESC NOTES <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN <br />APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, <br />PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, <br />REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE <br />APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND <br />VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN <br />THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE <br />BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE <br />MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL <br />CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENTAND <br />SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE <br />APPLICABLE WATER QUALITY STANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED <br />SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE <br />UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND <br />W <br />SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />z <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE <br />APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM <br />EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF <br />ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. <br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A <br />TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO <br />PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE <br />DOWNSTREAM SYSTEM. <br />c� <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED ATTHE BEGINNING OF <br />CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES <br />MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF <br />THE PROJECT. <br />0 <br />\ <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND <br />SEDIMENT TRACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER <br />M.H.(1.5E/0 R.O.W.) <br />BODIES IF THE PROPOSED BMPS FAIL. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE <br />8.SW.(0.2'E/0 R. 0. W. <br />THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY <br />1 THROUGH SEPTEMBER 30. <br />SN. (I.6'W/0 R. 0. W ) <br />` <br />vJ <br />CONSTRUCTION SITE DEWATERING NOTES <br />TAKE CARE WHEN DEWATERING CONSTRUCTION SITES. DO NOT PUMP SEDIMENT -LADEN WATER <br />DIRECTLY TO LAKES, STREAMS, COUNTY DRAINS, STORM DRAINS, WETLANDS OR OTHER <br />ENVIRONMENTALLY SENSITIVE AREAS. THE PROPER WAY TO DEWATER A CONSTRUCTION SITE IS AS <br />FOLLOWS: <br />• PLACE A GEOTEXTILE FILTER BAG OR GEOTUBE ON THE END OF THE DISCHARGE HOSE <br />• DISCHARGE INTO A CONSTRUCTED CONTAINMENT AREA AND HAUL OFF SITE. GC TO <br />SUBMIT DEWATERING PLAN PRIOR TO CONSTRUCTION FOR APPROVAL. <br />DISSIPATE ENERGY TO PREVENT SCOURING, AND INSPECT DEWATERING OPERATIONS SEVERALTIMES <br />DAILY. <br />^� <br />1 <br />I <br />INSTALL/MAINTAIN INLET <br />CONTROL UNTIL REMOVED <br />PED. X(J. 7'E/0 R. 0. W ) <br />M. H. <br />T.S.P.(22E/0 R.0.W) <br />MGN' R;ONT,GF WPY) <br />o EOIOATED PGB�" 0 <br />o_ (1 00' G <br />M• <br />ERE <br />E� <br />�E <br />4041=40M <br />B. D. <br />BRASS DISK <br />P.S. <br />PARKING SPACE <br />B. SW <br />BACK OF SIDEWALK <br />PED.X <br />PEDESTRIAN CROSSING <br />(C) <br />CALCULATED DATA <br />R.O.W. <br />RIGHT OF WAY <br />C.L. <br />CENTER LINE <br />(R 1) <br />INST. NO. 9206230250 <br />C.L.F. <br />CHAIN LINK FENCE <br />(R2) <br />INST NO. 9901215009 <br />C. 0. <br />CLEAN OUT <br />(R3) <br />INST. NO. 200704035002 <br />D.l. <br />DRAIN INLET <br />(R4) <br />INST. NO. 200906185002 <br />G.A. <br />GUY ANCHOR <br />RSR. <br />RISER <br />G.M. <br />GAS METER <br />S.C.O. <br />SEWER CLEAN OUT <br />I.P. <br />IRON PIPE <br />SN. <br />SIGN <br />LS <br />LANDSCAPING <br />T.PED. <br />TELEPHONE PEDESTAL <br />M. C. <br />MONUMENT CASE <br />T. S P. <br />TRAFFIC SIGNAL POLE <br />M.H. <br />MAN HOLE <br />T.S.P.B. <br />TRAFFIC SIGNAL PULL BOX <br />MON. SN. <br />MONUMENT SIGN <br />W. M. <br />WATER METER <br />OH. <br />OVERHANG <br />W V. <br />WATER VALVE <br />P.P. <br />POWER POLE <br />BLOCK/CONCRETE WALL <br />CONCRETE <br />ASPHALTIC CONCRETE <br />BUILDING LINE <br />HANDICAP PARKING <br />-��- <br />CHAIN LINK FENCE <br />LIGHT POLE <br />,- - <br />OVERHEAD WIRE <br />STORM DRAIN LINE <br />SOIL EROSION AND SEDIMENTATION CONTROL NOTES AND MAINTENANCE NOTES <br />1. LANDOWNER OR LANDOWNER'S REPRESENTATIVE SHALL SUBMIT A TEMPORARY SOIL EROSION <br />CONTROL (TESC) PLAN AND OBTAIN A TEMPORARY SOIL EROSION CONTROL PERMIT PRIOR TO ANY <br />EARTH CHANGES. APPROVAL OF PLAN DOES NOT CONSTITUTE APPROVAL OF CONSTRUCTION <br />ACTIVITIES. <br />2. THIS PROJECT SHALL BE CONSTRUCTED IN COMPLIANCE WITH THE CITY OF EVERETT SOIL EROSION <br />AND SEDIMENTATION CONTROL REQUIREMENTS. <br />3. EROSION AND ANY SEDIMENTATION FROM WORK ON THIS SITE SHALL BE CONTAINED ON THE SITE <br />AND NOT ALLOWED TO COLLECT ON ANY OFF SITE AREAS OR IN WATERWAYS. WATERWAYS <br />INCLUDE BOTH NATURAL AND MAN MADE OPEN DITCHES, STREAMS, STORM DRAINS, LAKES AND <br />PONDS. <br />4. STAGING THE WORK WILL BE DONE BY THE GENERAL CONTRACTOR OR LANDOWNER'S <br />REPRESENTATIVE AS DIRECTED IN THESE PLANS AND AS REQUIRED TO ENSURE PROGRESSIVE <br />STABILIZATION OF DISTURBED EARTH CHANGE. <br />5. THE GENERAL CONTRACTOR OR LANDOWNER'S REPRESENTATIVE SHALL BE RESPONSIBLE FOR <br />INSTALLATION AND MAINTENANCE OF TESC DEVICES. <br />6. THE GENERAL CONTRACTOR SHALL IMPLEMENT AND MAINTAIN THE TESC MEASURES AS SHOWN <br />ON THE PLANS BEFORE, AND AT ALL TIMES DURING, THE CONSTRUCTION ON THIS PROJECT. ANY <br />MODIFICATIONS OR ADDITIONS TO TESC MEASURES DUE TO CONSTRUCTION OR CHANGED <br />CONDITIONS SHALL BE COMPLIED, RECORDED, AND REPORTED TO THE CITY OF EVERETT AS <br />REQUIRED. <br />7. IF ANY OF THE TESC MEASURES ON THE SITE ARE DEEMED INADEQUATE OR INEFFECTIVE, THE <br />JURISDICTIONAL AUTHORITY HAS THE RIGHT TO REQUIRE ADDITIONAL TESC MEASURES ATTHE <br />EXPENSE OF THE GENERAL CONTRACTOR. <br />8. THE GENERAL CONTRACTOR SHALL INSPECT THE SESC DEVICES ONCE A WEEK, WITHIN 24 HOURS <br />OF RAINFALL, AND DAILY DURING A PROLONGED RAIN EVENT. A LOG OF INSPECTION REPORTS <br />SHALL BE MAINTAINED AND ACCESSIBLE IN ACCORDANCE WITH NATIONAL POLLUTION DISCHARGE <br />ELIMINATION SYSTEM (NPDES) REQUIREMENTS. REQUIRED MAINTENANCE SHALL BE PROVIDED <br />PROMPTLY. <br />9. INSTALL SILT FENCE AS INDICATED ON THE PLAN, PER DETAIL, AND AT ADDITIONAL AREAS AS <br />NECESSARY. <br />A. SILT FENCE SHALL BE INSPECTED WEEKLY UNDER NORMAL CONDITIONS, WITHIN 24 HOURS <br />OF RAINFALL, AND DAILY DURING A PROLONGED RAIN EVENT. REQUIRED MAINTENANCE <br />SHALL BE PROVIDED PROMPTLY. <br />B. BUILD-UP OF SEDIMENT SHALL BE REMOVED WHEN SEDIMENT ACCUMULATES TO 1/3 TO <br />1/2 OF THE HEIGHT OF THE SILT FENCE. <br />C. IF SILT FENCE DECOMPOSES OR BECOMES INEFFECTIVE PRIOR TO THE END OF EXPECTED <br />USABLE LIFE AND THE BARRIER IS STILL REQUIRED, THE SILT FENCE SHALL BE REPLACED <br />PROMPTLY. <br />11. INSTALL INLET FILTER ON ALL PAVEMENT CATCH BASINS PER DETAIL. <br />A. INLET FILTERS SHALL BE INSPECTED WEEKLY UNDER NORMAL CONDITIONS, WITHIN 24 <br />HOURS OF A RAINFALL AND DAILY DURING A PROLONGED RAIN EVENT. REQUIRED <br />MAINTENANCE SHALL BE PROVIDED PROMPTLY. <br />B. BUILD-UP OF SEDIMENT AND DEBRIS SHALL BE REMOVED PROMPTLY. <br />C. IF FILTER FABRIC DECOMPOSES OR BECOMES INEFFECTIVE PRIOR TO THE END OF EXPECTED <br />USABLE LIFE AND THE BARRIER IS STILL REQUIRED, THE FILTER FABRIC SHALL BE REPLACED <br />PROMPTLY. <br />12. INSTALL DRAIN GUARD ON ALL CATCH BASINS PER DETAIL, SEED OR SOD THE AREA BETWEEN THE <br />SILT FENCE AND THE INLET. <br />A. DRAIN GUARDS SHALL BE INSPECTED WEEKLY UNDER NORMAL CONDITIONS, WITHIN 24 <br />HOURS OF RAINFALL AND DURING A PROLONGED RAIN EVENT. REQUIRED MAINTENANCE <br />SHALL BE PROVIDED PROMPTLY. <br />B. BUILD-UP OF SEDIMENT SHALL BE REMOVED WHEN SEDIMENT ACCUMULATES TO 1/3 TO <br />1/2 OF THE HEIGHT OF THE SILT FENCE. <br />C. IF FILTER FABRIC DECOMPOSES OR BECOME INEFFECTIVE PRIOR TO THE END OF EXPECTED <br />USABLE LIFE AND THE BARRIER IS STILL REQUIRED, THE FILTER FENCE SHALL BE REPLACED <br />PROMPTLY. <br />13. ALL STOCKPILED SOILS SHALL BE MAINTAINED IN SUCH AWAY AS TO PREVENT EROSION FROM <br />LEAVING THE SITE. SILT FENCE MUST BE INSTALLED AROUND THE PERIMETER OF THE STOCKPILE. <br />IF THE STOCKPILE WILL BE ON SITE FOR MORE THAN 30 DAYS, THEN THE STOCKPILE MUST BE <br />SEEDED. <br />A. IMMEDIATELY AFTER SEEDING, MULCH ALL SEEDED AREAS WITH UNWEATHERED SMALL <br />GRAIN STRAW, SPREAD UNIFORMLY AT THE RATE OF 1 TO 2 TONS PER ACRE OR 100 <br />POUNDS (2-3 BALES) PER 1000 SQUARE FEET. <br />B. THE MULCH SHOULD BE ANCHORED WITH DISC TYPE MULCH ANCHORING TOOL OR OTHER <br />MEANS AS APPROVED BY THE JURISDICTIONAL AUTHORITY. MULCH MATTING MAYBE USED <br />IN LIEU OF LOOSE MULCH. <br />14. IF ANY DEWATERING IS NEEDED, IT SHALL BE DISCHARGED THROUGH A FILTER BAG OVER A <br />WELL -VEGETATED AREA. THE PUMP MUST DISCHARGE AT NON -EROSIVE VELOCITY. IF <br />NECESSARY, AN APPROVED ENERGY DISSIPATER MAY BE USED. <br />15. CONSTRUCTION ACCESS TO BE FROM THE PUBLIC RIGHT OF WAY. <br />16. ALL MUD, DIRT, AND DEBRIS TRACKED ONTO THE PARKING LOT OR ANY ROADWAY SHALL BE <br />REMOVED IMMEDIATELY. <br />17. STREETS AND/OR PARKING AREAS WILL BE SCRAPED AND SWEPT ON A DAILY BASIS BY THE <br />GENERAL CONTRACTOR. <br />18. ALL DISTURBED AREAS SHALL BE MAINTAINED FOR DUST CONTROL. SPRINKLING TANK TRUCKS <br />SHALL BE AVAILABLE AT ALL TIMES AND USED ON HAUL ROADS, ON -SITE DISTURBED AREAS, AND <br />OTHER AREAS WHERE DUST BECOMES A PROBLEM AS A RESULT OF CONSTRUCTION ACTIVITY. <br />19. FINAL GRADE, ESTABLISH VEGETATION, AND/OR LANDSCAPE ALL DISTURBED AREAS NOT BUILT OR <br />PAVED UPON. <br />20. REMOVE ALL TESC DEVICES AFTER PERMANENT STABILIZATION IS ESTABLISHED. <br />21. SOIL TYPE(S): ALDERWOOD-URBAN LAND COMPLEX, 2 TO 8 PERCENT SLOPES <br />22. TOTAL SITE AREA = 5.05± AC <br />23. TOTAL ACRES DISTURBED = 0.20± AC <br />CONSTRUCTION OPERATION TIME SCHEDULE <br />(CITY OF EVERETT BMP #C162) <br />CONSTRUCTION SEQUENCE 1 2 3 4 5 <br />1 INSTALL SESC MEASURES <br />2 DEMOLITION <br />3 EXCAVATION <br />4 BACKFILL <br />5 SESC MEASURES INSPECTIONS AND MAINTENANCE <br />6 COMPLETE EARTH MOVEMENTS/PAVING <br />7 _ <br />sevan <br />ENGINEERING <br />Regional Office: <br />37704 Hills Tech Drive <br />Farmington Hills, MI 48331 <br />734.367.4445 Telephone <br />Corporate Office: <br />3025 Highland Parkway, Suite 850 <br />Downers Grove, IL 60515 <br />info@sevansolutions.com www.sevansolutions.com <br />INTEGRITY I RESPECT I TEAMWORK I EXCELLENCE I CHARITY <br />REVISIONS <br />NO. DATE DESCRIPTION <br />0 08.18.2020 OWNER REVIEW <br />1 09.24.2020 PERMITS <br />2 10.23.2020 PERMIT REVISIONS <br />3 111.17.20201 PERMIT REVISIONS <br />I CONSULTANT 1111 <br />r <br />SEAL <br />'t W-A <br />II CUSTOMER I <br />IL PROJECT DESCRIPTION I <br />r <br />RCC TENANT <br />PROJECT LOCATION <br />I I SHEET TITLE I <br />�.� .� <br />� 1 1 <br />SHEET MANAGEMENT <br />PROJECT NO.: - <br />DATE: 08.18.2020 <br />CAD FILE: C1,10.dwg <br />PROJECT DOCUMENT <br />ERAND <br />PISKO <br />THIS DSHALLREMAINTHEPROPEMo <br />SEVAN MULTI -SITE SOLUTIONS, INC. <br />REPRODUCTION OR ALTERATION OF THIS DOCUMENT WITHOUT THE EXPRESSE <br />WRITTEN PERMISSION OF SEVAN MULTI -SITE SOLUTIONS; INC. IS PROHIBITED, <br />(NOTPUBLISHED: ALL RIGHTS RESERVED.) <br />COPYRIGHT BY SEVAN MULTI -SITE SOLUTIONS, INC. 2019 <br />SHEET NUMBER <br />SCALE: 1" = 20'-0" <br />EXISTING LEGEND <br />